S. Verdú-Andrés, LARP Toohig Fellow Brookhaven National Laboratory

Slides:



Advertisements
Similar presentations
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Advertisements

Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
ESS cavities interfaces
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
Binping Xiao On behalf of the DQWCC team 12/09/2013
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
6 TH C RAB C AVITY W ORKSHOP – December 9-11, 2013, CERN (Geneva, Switzerland) Silvia Verdú-Andrés Silvia Verdú-Andrés on behalf of (BNL) Sergey Belomestnykh,
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
SPS D OUBLE -Q UARTER W AVE C RAB C AVITIES D ISCUSSION ON CAVITY PREPARATION PROCEDURES CERN, 28 October 2015 Silvia Verdú-Andrés, Toohig fellow at BNL.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
RF-Dipole Cavity: Processing and RF Measurements Procedure
Page 1 Subashini De Silva Center for Accelerator Science Old Dominion University CAVITY II – RF-DIPOLE CAVITY TEST RESULTS LHC – CC-13, CERN December 9-11,
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
TE-type Sample Host Cavity development at Cornell Yi Xie, Matthias Liepe Cornell University Yi Xie – TE cavity developments at Cornell, TFSRF12.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
OUTCOME OF FIRST CAVITY TESTS With help of T. Junginger, N. Schwerg, K. Liao, P. Maesen, M. Gourragne, A. Benoit, O. Brunner SPL Seminar 2012 at CERN 112/07/2012Mathieu.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
LHC Crab Cryostat Integration and Planning Meeting – some outcomes
CERN – Zanon discussions
T5.2: Harmonization - Material and Component Reference
HFM Test Station Main Cryostat
Odu/slac rf-dipole prototype
Preliminary Y-chamber specifications – First draft
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
Mathieu, Gabriel, Max, Spyros, Guillaume
SPS – RFD Experience and Evolution to LHC
Definition of work flow for string DESY Example on critical operation
Double Quarter Wave Crab Cavity
Crab Cavity Manufacturing Readiness Meeting
P. Maesen for CERN BE/RF-SRF team
RF-Dipole Cavity Update
Superconducting RF Crab Cavities
UK RFD Pre-Series cryomodule
SRF Section Cuvée 2014.
IMP Cryomodule Assembly and Alignment
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Cryomodule Assembly Plan
SNS Coupler Shipping Plans
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

S. Verdú-Andrés, LARP Toohig Fellow Brookhaven National Laboratory CRYOGENIC TEST OF THE PoP DQWCC AT CERN Experience in preparing and cryo-testing the PoP DQWCC at BNL S. Verdú-Andrés, LARP Toohig Fellow Brookhaven National Laboratory

Crab cavities for LHC Crab crossing LHC Crab Cavities Potential benefits from crabs: Luminosity increase Luminosity levelling Alleviate pile-up 2-cavity module SPS test 4 cavities/IP/side/beam Between D2 and Q4 LHC Crab Cavities 𝜃 𝐶 2 Crab crossing reestablish head-on collision for maximal ℒpeak Need 32 crab cavities

Phases of the LHC Crab Cavities project Today SPS Test Final Implementation LHC crab cavity program phases: 2003  2008 Conceptual design, feasibility study and system development 2009  2014 Proof of Principle Cavities 2014  2018 Cavities and Cryomodules for a validation test in the SPS 2017  2023 HL-LHC system

The PoP DQWCC …and stiffening frame Electric field Magnetic field

PoP DQWCC history Bulk and light BCP Light BCP 600°C bake for 10 h BNL - Test II BNL - Test I 120°C bake CERN - Test III Light BCP

BNL insert

Port assembly

Diagnostics for BNL Test II #1 Top TEMPERATURE MONITORING Number: 6 thermosensors Type: CX-1050 Assembly: EPOXY plus kapton tape #5 #4 #2 #1 On top of the upper large port flange (niobium flange) #2 On FPC port pipe #3 On inner ring of cavity dome #4 On PU port pipe #5 On the pipe of the upper small port at the 4-port side (flange with copper disk) #6 On top of the lower large port flange (niobium flange) PU FPC #3 4-port side Vacuum #6 Bottom

Timeline CAVITY PREPARATION (about 2 days) Wipe cavity with ethanol in buffer area and move into class 10,000 cleanroom. The next day, check particle counting. If OK, then wipe cavity with ethanol and move into class 100 cleanroom (ISO 5) The next day, check particle counting. If OK, then cavity ready for opening ports. PORT ASSEMBLY (about 1 day) FPC, PU, particle trap and blank-off flanges in class 100 cleanroom CAVITY ASSEMBLY INTO INSERT (about 1 day) Cavity into insert Connect vacuum line in class 100 cleanroom SLOW PUMPING WITH NEEDLE VALVE (overnigth), TURBO PUMP (half day), LEAK CHECK + RGA, ION PUMP (overnight) Class 100 cleanroom DIAGNOSTICS INSTALLATION (about 1 day) TOP PLATE RIGGING INTO DEWAR AND ROLLING DEWAR INTO TEST BUNKER (about 1 day) CONNECT RF CABLING (CALIBRATION, TIME DOMAIN REFLECTOMETRY) AND CRYO LINE (about 1 day) COOLDOWN TO 4.5K (~) COOLDOWN TO 2.0K (~) TEST (about 3 days)

Measurements and Results Q0 at around 3~4.5e9. In CW mode, temperature of beam pipe flanges increase. Reached 4.5MV kick in pulsed mode, limited by quench, consistent with conditioning test. Temperature increase on pickup port blending area. Quench field at ~110mT, with peak E field at 52.8MV/m 𝑅 𝑟𝑒𝑠 : ~18.3nΩ

Measurements and Results Lorentz detuning (df/dVdefl)  freq = f(V) -206 Hz/(MV)^2 from CW measurement at 2K Pressure sensitivity (dp(=dT)/df)  freq = f(Tbath=p) -336 Hz/Torr from low power measurement during cooldown from 4.2K to 2K

Measurements and Results Residual surface resistance 𝑅 𝑟𝑒𝑠 : ~18.3nΩ

Cavity status BNL cadeau arrives at CERN on July 10, 2014 PoP DQWCC and its stiffening frame in bldg 252-R-003 now Sealed with stainless-steel flanges* after light BCP at Argonne in May 2014. Cavity is equipped with its own stiffening frame. * BNL property, to be shipped back to BNL inside transportation box.

PoP DQWCC test at CERN - objectives CERN Test III PoP DQWCC test at CERN - objectives Test all the candidate crab cavities on the same baseline. Prepare CERN test facility for future SPS cavity tests. Quench in Nb-coated DN100CF flanges? Freshly Nb-coated flanges may lead to better performances. Plus evaluate technology for SPS DQWCC e.g. tuning system

Test program for PoP DQWCC at CERN CERN Test III Test program for PoP DQWCC at CERN 1st – fixed FPC (vertical test) 2nd – movable FPC (vertical test) 3rd – SPS tuning system (horizontal test) Fixed FPC (bolts) CERN FPC actuator based on BNL design CERN Insert Type I

Cavity assembly - ports CERN Test III Cavity assembly - ports # FUNCTION CONNECTION A blank-off solid DN100 – non-standard port B FPC FPC actuator system C solid DN40 D E PU PU feedthru DN40 F vacuum DN10040 and valve G H

Clean assembly – BNL class 100 cleanroom Stiffening frame wrapped in plastic to reduce contamination Port assembly on wire table

CERN Insert – SPL type Bottom plate a’ la SPL  leak test in cleanroom CERN Insert Type SPL Bottom plate a’ la SPL  leak test in cleanroom

Fixed FPC - bellow length for critical coupling? Facts: Critical coupling (b=1) depends on: Q0, given by cavity performance Qext, given by FPC settings Impossible to predict Q0 beforehand Overcoupled (b>1) structure preferred as lower power requirement Strategy: From 2nd cryo test at BNL, Q0 ~ 4e9. After light BCP at ANL, better performances expected: Q0 > 4e9. b=>1  Qext slightly lower than expected Q0. e.g. set Qext = 4e9 -> d’=21.2mm bellow length The FPC is set at 21.2mm away from the cavity inner surface to the FPC tip, with a Qext at 4e9. If you want to change Qext to 1e10, the distance will be 25mm. Tuesday, Sept 23 (S. Belomestnykh) As the FPC is not adjustable, set Qext somewhat lower, 3e9 or 2e9, to help conditioning the cavity.  Bellow length ~ 27mm. Remarks: FPC coupling depends on coupler shape, penetration and orientation.  Pay special attention during assembly to the coupler orientation.

FPC coupler orientation for fixed FPC

Diagnostics – 6 CERNOX CX old PU CX Inner radius of cavity dome (highest E-field)? Or outer radius of cavity dome… (high B-field) FPC Inner radius of cavity dome (highest B-field) CX CX PU CX Vacuum heater Other thermosensors in all these regions plus in old and new pick up ports and, if possible, in all ports (on blended area of cavity and port plus on flange) CX

Diagnostics – OSTs Possible quenching regions: FPC PU Possible quenching regions: beam ports plate Possible quenching regions: Cavity dome FPC PU plate Vacuum

Diagnostics – 3 unidirectional fluxmeters

Measurements to be performed CERN Test III Measurements to be performed Monitor vacuum level, radiation (field emission and multipacting) during operation at different field levels Q slope (i.e. Q=f(V)) at 4K and 2K Q = f(T) for low field level to get residual surface resistance estimation Residual magnetic field level and corresponding residual magnetic field surface resistance Lorentz force detuning (df/dVdefl)  freq = f(V) Pressure sensitivity (dp(=dT)/df)  freq = f(Tbath=p) Determine multipacting regions. Radiation spectra Magnetic field

Cavity far from ideal… heat loss CERN Test III Cavity far from ideal… heat loss FPC bellow is not coated (difficult to coat welded flanges). Spacing between flanges will let field see SS from flanges and Cu from gasket. FPC and PU hooks made of copper (Nb coating was not adherent enough on copper surface).

Thanks for your attention Questions?

Cavity assembly – hardware (I) PORT FUNCTION CONNECTION BOLT TYPE #BOLTS #NUTS #WASHERS A blank-off solid DN100 M8x55 x16 x32 B FPC system bellow DN40 M6x35 x4 x8 anti-collapse ??? feedthru DN40 C solid DN40 x6 x12 D E PU F Vacuum: DN10040 and valve DN10040 valve DN40 G H In addition, bolts and ¿pins? for stiffening frame in case of magnetic hardware is found hardware for the piece on top of the cavity for transportation

Cavity assembly – hardware (II) BOLT TYPE # BOLTS # NUTS # WASHERS M8x55 32 64 M6x35 48 44 88 Anti-collapse? 4 16 8 Total DN40 copper gaskets: 8 Total DN100 copper gaskets: 2 Remarks: all bolts are Ag-coated A4-100 stainless-steel apply safety factor of 2--3 when ordering

Cavity assembly – FPC system Two options: Fixed FPC: 1st test Movable FPC: 2nd test Remarks: FPC coupling depends on coupler shape, penetration and orientation.  Pay special attention during assembly to the coupler orientation.

FPC actuator T. Renaglia (CERN) based on BNL design

Framework – LHC Crab Cavities If head-on collisions, debris can interact with the machine Crossing angle but decreased peak luminosity 𝜃 𝐶 2 𝜃 𝐶 2 Crab crossing reestablish head-on collision for maximal ℒpeak Need crab cavities (deflecting cavities in phase 0) For LHC, need 4 cavities per side per IP per beam… 32 cavities!!!