UCLA Group Meeting March 20, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab 4-120 Andrew Peck & Shayan Rastegari March 20, 2014.

Slides:



Advertisements
Similar presentations
22 May 2007G. Rakness (UCLA) 1 At minus-side slice test… Complete description of how to bring back slice test all the way from (power=off) to (local run=physics.
Advertisements

Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
Problems Encountered - Up to Midterm State Machine Transitions Much Too Fast - Solved by Decreasing Clock (LED Circuit) Difficult to Test LED (Column)
Guide to Oracle10G1 Introduction To Forms Builder Chapter 5.
Debugging CPSC 315 – Programming Studio Fall 2008.
A Guide to Oracle9i1 Introduction To Forms Builder Chapter 5.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
Modules, Hierarchy Charts, and Documentation
ECE Department: University of Massachusetts, Amherst Lab 1: Introduction to NIOS II Hardware Development.
Internet2 Network: Controlling a Slice of the National Network Eric Boyd Senior Director of Strategic Projects.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
Programming. Software is made by programmers Computers need all kinds of software, from operating systems to applications People learn how to tell the.
Internet2 Network: Controlling a Slice of the National Network Eric Boyd Senior Director of Strategic Projects.
G51FSE Version Control Naisan Benatar. Lecture 5 - Version Control 2 On today’s menu... The problems with lots of code and lots of people Version control.
Getting Started With Java Downloading and installing software Running your first program Dr. DwyerFall 2012.
Unit Testing & Defensive Programming. F-22 Raptor Fighter.
Global Timing Constraints FPGA Design Workshop. Objectives  Apply timing constraints to a simple synchronous design  Specify global timing constraints.
A Guide to SQL, Eighth Edition Chapter Three Creating Tables.
Automating Tasks with Visual Basic. Introduction  When can’t find a readymade macro action that does the job you want, you can use Visual Basic code.
© 2003 Xilinx, Inc. All Rights Reserved Reading Reports Xilinx: This module was completely redone. Please translate entire module Some pages are the same.
Development Strategies for Web Applications Jonathan Babbage National Superconducting Cyclotron Laboratory.
Matthew Palmer, Cambridge University01/10/2015 First Use of the UK e-Science Grid Overview The Physics Experiences Looking forward Conclusions Matthew.
Spring Introduction  Today’s tutorial focuses on introducing you to Xilinx ISE and Modelsim.  These tools are used for Verilog Coding Simulation.
David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Unit 1 – Improving Productivity Instructions ~ 100 words per box.
PROJECT LOG MOLLY ATKINSON. 10/09 Today, I got to grips with the course outline, which included creating the relevant folders for all my future publications,
Introduction Advantages/ disadvantages Code examples Speed Summary Running on the AOD Analysis Platforms 1/11/2007 Andrew Mehta.
2013 Texas Ad Astra Summit Monday, July 22 nd Role Play: Fresh Ideas for Setting Up Security Roles in Astra 7.5 Truman Glenn University of Houston
Cover for special hardcover edition of Phys. Lett. B featuring CMS+ATLAS Higgs results 31 July 2012G. Rakness (UCLA)1 The articles were submitted today.
UCLA Group Meeting May 01, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari May 01, 2014.
Basic Input/Output System
Unit 1 – Improving Productivity Instructions ~ 100 words per box.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
Website for our class. The information is updated at the end of each.
Renesas Technology America Inc. 1 M16C Seminars Lab 3 Creating Projects Using HEW4 14 March 2005 M16C Seminars Lab 3 Creating Projects Using HEW4 Last.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
Deploying Software with Group Policy Chapter Twelve.
Tools for NA62 firmware development Franco Spinella TEL62 Workshop Pisa January 30, 2014.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
Version 10.1 Xilinx Tools Update Terry Filiba CASPER Workshop II.
(1) Introduction to Continuous Integration Philip Johnson Collaborative Software Development Laboratory Information and Computer Sciences University of.
Version Control and SVN ECE 297. Why Do We Need Version Control?
Andrew Peck 1 CSC OTMB Firmware Meeting February 21, 2014 ALCT/TMB/RAT Test Stand at CERN Setting up complete duplicate of the ALCT-TMB-RAT test stand.
22 Sept A slight reformulation of (ALCT) muonic timing… In terms of brass tacks.
2/11/2007 NSL/SCS Development Jimmy Bonaiuto 2/26/2007.
CMS livetime during last week’s runnin 11 Sep 2012G. Rakness (UCLA)1 Fills  1.02/fb delivered, 0.98/fb recorded 96.1% live ~2.4% not running.
T Iteration Demo MapGuide based Web Edit Interface I2 Iteration
US ALCT / AFEB Analog Test Results N.Bondar, T.Ferguson, N.Terentiev* EMU Meeting UCLA 01/10/2003.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
MCast Errors and HV Adjustments Multicast Errors (seen on the DATA ERIS connection) have caused a disruption of a HV Adjustment due to a timeout (since.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
HAMILTON VENUS Security Settings. Security Settings are set in the System Configuration Editor.
1 Test Beam with Hybrid 6 Florian Lütticke for the Testbeam Crew Bonn University 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
ElComandante An ELaborate Computer Operated Modular Accessible Nested Data Aggregation Network Testing Environment.
MASS Java Documentation, Verification, and Testing
Lab 1: Using NIOS II processor for code execution on FPGA
904 Status Recall last Group Meeting…
University of California Los Angeles
CSCE 315 – Programming Studio, Fall 2017 Tanzir Ahmed
University of California Los Angeles
TigerSHARC processor and evaluation board
Programming.
Founded in Silicon Valley in 1984
Comparative Reporting & Analysis (CR&A)
An Introduction to Debugging
QuickBooks Support Phone Number 1. Resolve QuickBooks Error 2. Fix Error 6175, , C Performance issues 4. Fix company file & Error H202, Error.
TERMS AND CONDITIONS   These PowerPoint slides are a tool for lecturers, and as such: YOU MAY add content to the slides, delete content from the slides,
Presentation transcript:

UCLA Group Meeting March 20, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari March 20, 2014

UCLA Group Meeting March 20, 2014 Andrew Peck Shayan Rastegari 2 Test Stand Documentation Updated the three existing test instruction manuals.. Trying to fix a lot of the vague and confusing wording (e.g. “disable the clock” was used quite often and means exactly the opposite thing in different manuals). Added a new Test Stand Setup document with instructions for how to actually set up the test stand, rather than just running the tests. Uploaded UCLA_test_stand_files_ zip to the twiki. Now only 60 MB when compressed.. So still plenty of room if we decide to add things. Test Stand Software Added checks throughout the test stand software. If using wrong TMB firmware version, you will be warned explicitly: e.g.: “Wrong TMB firmware version: expect=normal, found=debug.” Fixed some other miscellaneous mistakes and typos in the software. ALCT Slow Control Firmware Using Xilinx Impact, Joonas was able to reproduce my hand edited (in a text editor) firmware file. So now we have a fully tested, working firmware version. His documentation is updated with the necessary settings.

UCLA Group Meeting March 20, 2014 Andrew Peck Shayan Rastegari 3 EMU DCS Software ALCT Slow Control Programming Modified the ALCT slow control programming routine so that it actually programs ALCT slow control firmware. Tested on chamber and worked well. Jinghua committed changes to SVN. The committed code works also. TMB Trigger Tests Have been working on the TMB trigger test utilities. Rather extensive port from the UCLA test software of some trigger testing tools. Has more than doubled the amount of TMB code in emuDCS. The tools work, basically.. But need debugging and tuning of the configuration file. Unfortunately now I can’t test the code New tools

UCLA Group Meeting March 20, 2014 Andrew Peck Shayan Rastegari 4 Checking AFEBs with Nikolai Bondar Spent an afternoon with Nikolai Bondar discussing the problems we had been seeing with AFEBs. Pair-plane crosstalk problems are not reproduced. Tested 12 bad boards, only 1 showed some slight issue. Thresholds problems are real. Uniformly low thresholds (>30 boards rejected) can be seen in the database as a low (~40-50 mV) U20 measurement. Nikolai believes these boards can easily be tuned to change an offset. Simply a matter of swapping one resistor in a voltage divider. Hope that maybe Eric or Matthias can spend another afternoon trying to figure out more issues. Nikolai caught a cold and stayed home so we only worked a short time together. Summary of problems: 136 AFEBs rejected in total Thresholds Problems 30 with Low AFEB thresholds 8 with High AFEB thresholds 17 Unspecified 47 with Pair-plane crosstalk 8 were Not in database 5 had No problem specified (but in the bad AFEBs box): 2 with Broken Ejector Latch or Pins 9 with Test 14 problems (time delay verification). 10 with misc. other problems