Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico.

Slides:



Advertisements
Similar presentations
Beam-beam studies for eRHIC Y. Hao, V.N.Litvinenko, C.Montag, E.Pozdeyev, V.Ptitsyn.
Advertisements

MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Brief Summary of LPA MD on 19 June 2012 Jose Abelleira, Xavier Buffat, Chandra Bhat, Karel Cornelis, Riccardo De Maria, Stephane Fartoukh, Rossano Giachino,
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
Elias Métral, 1st ICE meeting, 14/07/2010 /191 STATUS OF THE LHC INSTABILITIES E. Métral, N. Mounet and B. Salvant E. Métral, N. Mounet and B. Salvant.
W. LHC Studies WG Day Review MDs Transverse Damper from Run1 to Run2 reported by W. Hofle for ADT & friends LHC MSWG Special Meeting.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
1 BeamBeam3D: Code Improvements and Applications Ji Qiang Center of Beam Physics Lawrence Berkeley National Laboratory SciDAC II, COMPASS collaboration.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
Off-momentum tail scraping for passive abort gap cleaning (MD 444) D. Mirarchi, R. Bruce, S. Redaelli On behalf of the LHC Collimation Team LHC Study Working.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Beam-Beam Simulations for RHIC and LHC J. Qiang, LBNL Mini-Workshop on Beam-Beam Compensation July 2-4, 2007, SLAC, Menlo Park, California.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Status of halo excitation studies at CERN R. Bruce, D. Banfi, M. Buzio, J. Barranco, O. Bruning, X. Buffat, R. Chritin, R. de Maria, M. Fitterer, M. Giovannozzi,
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Beam-beam studies in the LHC and new projects T. Pieloni for the LHC and HL-LHC Beam-Beam Teams ICFA mini-workshop on "Beam-Beam Effects in Hadron Colliders”
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Evian 2014 historical perspective run 1: 2010: L peak >10 32 cm -2 s -1  2x10 32 cm -2 s : produce >1 fb -1  delivered.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
BSRT CALIBRATION MD SUMMARY LSWG #6-15/09/2015 BSRT TEAM.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
LHC LHC performance with low-emittance h=9 beam Focus on emittance preservation M. Kuhn, H. Bartosik, B. Dehning, A. Guerrero Ollacarizqueta, V. Kain,
LHC Emittance Preservation MD 3 - Preliminary Results M. Kuhn, V. Kain, G. Arduini, J. Emery, W. Hofle, A. G. Ollacarizqueta, F. Roncarolo,
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
07:30 – 10:30 Asynchronous dump test with Beam 2. No issue found. FIDEL update. Now chromaticity decay corrected. 12:13 Beam dump due to problem in the.
Criteria for dynamic aperture limits and impact of the multipolar errors: summary of the simulations with beam-beam for levelling scenarios at 5 and 7.5x10.
Crossing Schemes Considerations and Beam-Beam Work plan T. Pieloni, J. Barranco, X. Buffat, W. Herr.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
(Towards a) Luminosity model for LHC and HL-LHC F. Antoniou, M. Hostettler, Y. Papaphilippou, G. Papotti Acknowledgements: Beam-Beam and Luminosity studies.
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
1 Strong-Strong Beam-Beam Simulations Ji Qiang Lawrence Berkeley National Laboratory 3 rd JLEIC Collaboration Meeting March 31 st, Jlab 2016.
Pros and Cons of the 200 MHz System G. Iadarola, K. Li, E. Metral, G. Rumolo Thanks to: L. Medina, J. Esteban Mueller, B. Salvant, E. Shaposhnikova, R.
Fabio Follin Delphine Jacquet For the LHC operation team
INTRODUCTION FOR THIS (2nd) REVIEW ON LPL (LHC PERFORMANCE LIMITATIONS) => DURING RUN II ( ) E. Métral Follow-up of (1st) review on LPL during.
Y.Papaphilippou Thanks to
Beam Energy & Intensity: One bunch during full cycle
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Transverse Damping Requirements
Task 2. 5: Beam-beam studies D. Banfi, J. Barranco, T. Pieloni, A
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
MD #453 Effect of low frequency noise
Wire, flat beams and beam-beam MDs in 2017
MD2036: UFO dynamics studies and UFO fast detection
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Beam-beam Effects in Hadron Colliders
MD2490 Measurement of the TMCI threshold at flat-top
Beam-beam R&D for eRHIC Linac-Ring Option
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Limits on damping times
Friday morning 10:30 Optics measurements and corrections.
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
News on TMCI in the SPS: Injecting high intensity bunches
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Collective effects in the SPS and LHC (longitudinal plane)
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Summary for LPC (March 7th, Ralph Assmann)
Fri :52 Stable beams fill #2536
Another Immortal Fill….
Presentation transcript:

Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico

Head-on beam-beam limit Pushing Luminosity  Large Beam-Beam parameter  bb Are there show stoppers? Beam-Beam Limit MD 2011  No fast blow-up  Saw problems of fast blow-up not fully understood for Qy=0.32 (moved it to 0.315) 10 th order resonances?  Achieved  bb = 0.01 per IP (2 IPs)  This could be a source of emittance blow-up during collisions needs to be explored in controlled way  HL-LHC relies on  bb = 0.01 and several Ips

Head-on beam-beam limit Pushing Luminosity  Large Beam-Beam parameter  bb  Characterize losses versus  bb and working point  Characterize emittance slow growth versus parameters and working points to define limits  Explore tune diagram to find limits Simulations: Slow emittance growth (4-10%/h) due to resonances (COMBI simulations) Losses versus working point (DA tune scans) Tune scan down the diagonal to see the limit Coherent beam-beam modes and noise- how do they contribute?

HL-LHC transverse offsets and emittance growth Leveling with transverse offset still option for HL-LHC Long range interactions will give orbit effects at the IPs. How large the effect? Emittance growth is induced by small offsets at collision and has intensity threshold! Is HL-LHC safe? 2012 LHC test not conclusive LHC nominal Slow Emittance growth

1st part : injection energy tune scan 8h Incoherent HO limit (resonances): Simulations: Emittance effects from HO beam-beam is independent on energy and  *  Injection (coll tunes) can help exploring the limits  Beams: single bunches as bright as possible (3-2-1 e11 ppb smallest emittances)  Growth and losses versus BB parameter and working point BSRTs & Wire scanners (monitor emittances in time at different working points) ADT Feedback on: ensure no instabilities Collide Head-on and Observe all bunches Changing Tune scan along diagonal:  Monitor emittances and Losses  Luminosity measurements from Experiments Possibly test separation at 0.5 sigma both IPs and 0.8 sigma

2 nd step: need to ramp, squeeze and collide high brightness beams at top energy  Top Energy  Beams: single bunches as bright as possible (3-2-1 e11 ppb smallest emittances)  Need to guarantee single bunch stability (not obvious)  Growth and losses versus BB parameter and working point BSRTs & Wire scanners (monitor emittances in time at different working points) ADT Feedback on: ensure no instabilities Collide Head-on and Observe all bunches Possibly test separation at 0.5 sigma both IPs and 0.8 sigma Changing Tune scan along diagonal:  Monitor emittances and Losses  Luminosity measurements from Experiments