APEX Schedule April 18 2007 10:30am12:30pm5pm 05-18 IBS suppression lattice Litvinenko, Tepikian +team Back 2 Phys 4pm 07-06 Nonlinear Chromaticity (Response.

Slides:



Advertisements
Similar presentations
RHIC Experience: Optics Measurements, Corrections, and Modeling M. Bai C-A Dept., BNL.
Advertisements

RHIC Optics Correction M. Bai C-A Dept., BNL Mini-workshop on ICA in Beam Measurement and Generic algorithm in Nonlinear beam dynamics, Bloomington, Indiana,
APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
The RHIC Collider Fulvia Pilat Collider Workshop, JLAB, February 24, 2009.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Nov. 17, 2005Fermi Lab AP Seminar AC Dipole Based Diagnostics Mei Bai, C-A Department.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
APEX Report March 3, 2010 Fulvia Pilat Time Meeting, March 9, 2010.
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
RHIC Retreat 2006, July 10-12, N.Malitsky. Model update and progress Model Update and Progress L. Ahrens, K. Brown, A. Luccio, N. Malitsky, V.Ptitsyn,
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
1) orbit reponse measurements indicated no obvious BPM polarity errors (Kajetan) 2) confirmed consistency between synchronous and IIR- based orbit estimates.
Saturday ● 06:00: Physics fill from the night shift ● 15:00: End stable beam mode: – problems with incorporation of settings for the squeeze ● 16:40:
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Vladimir Litvinenko, APEX Workshop 11/02/20006 IBS suppression lattice Mei Bai, Joanne Beebe-Wang, Peter Cameron, Roger Connolly, Angelika Drees, Alexei.
Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover.
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
Beta* leverage during RHIC AuAu Run14 G. Robert-Demolaize, M. Bai, C. Harper, A. Marusic, X. Shen, S. White Work supported, in parts, by the European Commission.
APEX RUN-12 APEX Schedule Feb 22, 2012 Injection 8am 11pm IP transfer matrix Tepikian, Ptitsyn If needed: Beam Scrubbing Blaskiewicz, Montag, Huang Injection.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
Run 10 Start-up Status
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
APEX RUN-11 APEX Schedule May 11, 2011 Injection 12am8am BBA Minty, Jordan, Liu, Rob, Rob, Kevin, … Spin Flipper Bai, Pablo, Oddo, Craig, Kevin IPM calibration.
RHIC Optics Status: Optics Measurements and Corrections M. Bai C-A Dept., BNL On behalf of RHIC Team.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
“IBS in RHIC”, HB2008, Nashville, Tennessee, August IBS suppression lattice in RHIC: theory and experimental verification A. Fedotov, M. Bai,
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
Operation Notes APEX Status Fulvia Pilat Machine Experiments Meeting January 20, 2009.
APEX RUN-11 APEX Schedule Planned Feb. 23, pm ~ 3 ramps 8am 12x12 store Physics store Beta* unsqueeze +s* adjustment GRD+team 6x6 store AC dipole.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Floating MD week 28 summary
LHC Commissioning with Beam
-9:00: Test IP transverse adjustment (CMS) and optics verification.
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Tuesday TOTEM and transverse loss map (1) OK
Thursday morning 09:30 Dump of pPb fill.
Thursday :00: Physics fill from the night shift
Saturday 7th May Sat – Sun night
Aims for the week Recover from technical stop and precycle at 10A/s
Monday :20 beta beat corrections during squeeze for flat machine finished Afterwards fixing issues at injection: BPM rephrasing for B2 solved.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Summary for LPC (March 7th, Ralph Assmann)
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Thursday Morning/Afternoon
Multipole Limit Survey of FFQ and Large-beta Dipole
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Multipole Limit Survey of Large-beta Dipoles
Error Sensitivity in MEIC
Presentation transcript:

APEX Schedule April :30am12:30pm5pm IBS suppression lattice Litvinenko, Tepikian +team Back 2 Phys 4pm Nonlinear Chromaticity (Response Matrix) Luo Tepikian 7:30am5am Store 6 bunches 0.5-1x10 9 ppb NO rebucketing BBQ Store Ramp 1: 12 bunches Ramp 2: physics Needs collisions STAR, PHENIX ON Beta* Squeeze Pilat, Malitsky, Ptitsyn Satogata, Bruno Common Mode noise Schultheiss TBD Injection 1-6 bunches 0.5-1x10 9 ppb IBS lattice 2:30pm Store 6 bunches 0.5-1x10 9 ppb NO rebucket BPMs ORM Satogata Niedziela

 * squeeze beam experiment F. Pilat, D. Bruno, N. Malitsky, V. Ptitsyn, T. Satogata, S. Tepikian  Ramp 12 bunches, normal intensity, no rebucketing  Squeeze beta in 4 installments from 0.8 to 0.6 m  Calculate and change the IR8 model for both rings  Adjust tune and chromaticities  Set slow factor 4 (not faster than 0.5 A/sec)  Commit changes  Check orbit, tunes and lifetime, correct if needed  Measure collision rate in IP8  Measure dispersion  Measure optics with AC dipole  Revert the store stone Plan: Objectives: dynamic  * squeeze operational procedure + Ramp Designer module for offline and online optics changes

Blue Optics after online matching  * = (0.70, 0.70) in IR 8

Yellow Optics after online matching  * = (0.71, 0.77) in IR 8

Blue and Yellow behavior during the 0.75m  * squeeze. Blue seamlessly went to 0.7m 2 attempts to squeeze Yellow to 0.75 failed (even with compensation of measured tune shifts the second time)

Summary beta* squeeze  Blue can go down to 0.7m without a glitch.  In Yellow, we lost the beam on slow losses on both attempts when squeezing down to 0.75 even after compensating for the tune shift.  We need to understand why even in the model the yellow matching and squeeze are more difficult  Next attempt: May 8-9

APEX Schedule April am 1pm 8am Beam beam compensators Fischer+Calaga +team 5am1am Nonlinear Chromaticity Off momentum response matrix Luo Tepikian +team 10pm8pm Injection Few bunches AC dipole Store 6 bunches NO rebucketing BBQ Beta Beat Calaga Store Blue: 24 bunches Yellow: 6 bunches HF Schottky BBQ AC dipole Test +DA Bai Beta Beat Calaga IBS suppression lattice Litvinenko, Tepikian +team Injection 1-6 bunches IBS lattice Au77ibs BBA Niedziela Injection Continuous ramp activations 6am AGS OFF