Procurement for the Supporting Systems

Slides:



Advertisements
Similar presentations
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Advertisements

, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Team members: Alex Baker Ryan Bailey Donald Bell Nathan Wenk Faculty Advisor: Jim Van Winkle, PhD
Mechanical Status of ECAL Marc Anduze – 30/10/06.
© RESCUER Consortium Meeting Genoa March 2006 © RESCUER Consortium Meeting Genoa March 2006 Task 3.1: Design and development of the mobile.
TMM of the CLIC Two-Beam Module T0 in the LAB – Proceedings to structural FEA Riku Raatikainen
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
Influence of the Gravity, Vacuum and RF on CLIC Module T0 Behavior R. Raatikainen.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10.
, CLIC Test Module Meeting Concept of ‘hexapod type’ DB Quad adjustable support Mateusz Sosin.
Measurement report of Boostec girders 1/13 Sylvain GRIFFET, 15/11/2010 Measurements performed on the 28th of October 2010 with the Laser Tracker LTD500.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
Dmitry Gudkov BE/RF/PM CLIC Module Working Group PROTOTYPE TWO-BEAM MODULES (CLEX) Supporting and positioning system for CLEX modules main conclusions.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
Team: Wolfgang Burkert, Haimo Jöhri, Uwe Barth Mechanical precision and vibration behavior of mechanical supports Johan Wickström GFA-ATK.
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
1962 First CMM DEA (Italy) Ahmed CHERIF CERN Metrology lab. CLIC TECHNICAL COMMITTEE – EDMS : EDMS :
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.
Safe Spot ME 4182 Prototype Review #1 March 29, 2006 J.J. Couvillion - Drew Bartlett - Manish Patel - Nick Roberts - Elisha Mellitz.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
The HCAL barrel absorber structure
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
LEFB Belt Drive AC Servo
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Engineering design of the V-supports J.Huopana Input from: G.Riddone, A.Samoshkin, R.Nousiainen, D.Gudkov, N.Gazis.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
1 07-Oct-2012 «BE-RF-PM» Experiments on the Material Samples of the CLIC Two-Beam Module Supporting System: PHASE 2 Nick Gazis 1.
Updates & Finalization for the ANSYS simulations of the Vacuum System 28 March 20111Nick Gazis, CERN-BE/RF & NTU-Athens.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
Progress Report from Material Radiation Testing at NCSR Demokritos 28 February 20111Nick Gazis, CERN-BE/RF & NTU-Athens Input from: G. Riddone, A. Samoshkin,
CLIC Permanent Magnet Quadrupole update 27 th January 2011 Mechanical Engineering status update N. Collomb1.
Thermal Shield Update Niklas Templeton 15/02/16 (final update of placement  )
19-Sept-2012] «BE-RF-PM» TEST MODULES in the LAB DB girders (epucret) for T1 & T4: Optimization of the V-shaped supports Nick Gazis, Dmitry Gudkov, Vadim.
Epument Girder simulation and Module Showroom upgrade For CLIC meeting 2015 Petri Tikka, Helsinki Institute of Physics focusing on exploring the possibilities.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Two-beam module layout
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
CLIC Parameter Working Group Two Beam Module Design
DT-LHCb coordination meeting 18 April 2016
Update on the DB Girders FE Analyses
on behalf of the CLIC active pre-alignment team
Schedule CM SPS G.Vandoni.
TEST MODULE WG Cradles for CLIC module supporting system
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
CLIC Common RF-girder study
CATIA Design Requirements applied to Handling & Transport at CERN 26th CATIA Forum Jean-Louis GRENARD on Behalf of EN-HE design office 18-May-2017.
List of changes and improvements for the next generation CLIC module
Installation plan for LAB modules
MicroMegas Mechanical Meeting --- Cern April 2014
By Arsalan Jamialahmadi
TM0s and TM1 components inventory and procurement schedule
EAT 415 :ADVANCED STEEL BUILDING DESIGN PLATE GIRDER
Presentation transcript:

Procurement for the Supporting Systems for the RF-Structures of the CLIC-Module 19/4/2010 Nick Gazis, CERN-BE/RF & NTU-Athens

Nick Gazis, CERN-BE/RF & NTU-Athens Index Boostec Epucret Type 0 Type 1 Type 4 DB MB Micro-Controle Boostec (SiC) Epucret (Mineral Cast) Micro-Controle (complete Supporting System) Summary & Actions 19/4/2010 Nick Gazis, CERN-BE/RF & NTU-Athens

with the aim of producing BOOSTEC  2* DB [Type 0] Work in Progress with the aim of producing Baseline DB Type 0 SiC Girder technical drawing Updated Girder with integrated V-Supports (June 2010) 19/4/2010 Nick Gazis, CERN-BE/RF & NTU-Athens

Epucret  2* Girders [Type 0] Updated Girder with integrated fixation components (August 2010) 19/4/2010 Nick Gazis, CERN-BE/RF & NTU-Athens

Prototype Girders Fabrication & MS 16th week 2010: OFFER for the complete Supporting System of 2 MB Type 0 girders 19/4/2010 Nick Gazis, CERN-BE/RF & NTU-Athens

Feasibility check – Design/Offer under way (according to baseline) Summary & Actions Feasibility check – Design/Offer under way (according to baseline) SiC Girder with Integrated V-Supports (Boostec)  (ordered) Supporting Systems complete tender & Actuators (Micro-Controle)  (offer on current week) Mineral Cast Girder (Epucret)  (ordered) Carbon Fiber Girder (Hexcel)  (MS) Metal Foam Girder(Alulight)  (MS) Orders issued for the girder earliest delivery deadlines (summer 2010) Girder and DB-quad supporting plate draft designs (in progress to be compatible for the offers design) Progress on the cradle–girder interface according to the updated cradle design and the girder fabrication feasibility 19/4/2010 Nick Gazis, CERN-BE/RF & NTU-Athens

Thank you! 19/4/2010 Nick Gazis, CERN-BE/RF & NTU-Athens 7

Supplementary Slide CLIC-Module MB & DB Girder of SiC Handling Zones Alternative Configuration Girder Baseline Configuration: Max. Vertical & Lateral Deformation at 10μm Max. Girder Weight at 240kg Max. Girder Length of 2m Max. Load on top of the Girder 400kg/m (distributed weight) Rectangular Space Reservation of External Dimensions of [320*150]mm References Surfaces (as presented) of 30mm surface width Baseline Configuration with Reference Surfaces Supplementary Slide 350 mm 150 mm 150 mm 350 mm Handling Zones 19/4/2010 Nick Gazis, CERN-BE/RF & NTU-Athens

DB-Quad Supporting Plate preliminary design Space Reservation compatible with the preliminary configuration of the DB-Quad supporting plate design. Update of the design and new compatibility check should be made after the final DB-Quad design and integration. Fixation , contact and reference surfaces are dedicated to the girder baseline configuration. Supplementary Slide Draft design (to be updated) 19/4/2010 Nick Gazis, CERN-BE/RF & NTU-Athens

Special Technique under investigation Draft List of Companies under investigation for feasible CLIC-Module Girder Fabrication Company Material under investigation for feasible CLIC-Module Girder fabrication Special Technique under investigation Boostec Silicon Carbide Weight lightening Technique, Integrated V-Supports Microplan Integrated V-Supports Micro-Contole Design for complete Supporting Systems package (Girders, V-Supports, Cradles) Epucret Mineral Cast Material (Epument 145/B) Integrated universal fixation components (steel rails for the V-Supports) Salzgitter Mannesmann Precision Steel Weight lightening Design Alulight Metal Foams Weight lighted fabrication, Integrated Components (V-Supports, Cradles) Gleigh Aluminum Metal Foams, Sandwich Panels Alcarbon Hexcel Carbon Fibers Weight lighted fabrication, Integrated V-Supports Supplementary Slide 19/4/2010 Nick Gazis, CERN-BE/RF & NTU-Athens