Peter Sharp CERN CMS Tracker 2008 1 TWEPP Meeting in Naxos September 2008 Some Lessons from the LHC Projects Peter Sharp (CERN and IC) 18 September 2008.

Slides:



Advertisements
Similar presentations
ICT Services Suppliers Briefing Thursday, 17 September 2009.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Development of a DC/DC converter for low voltage power distribution in LHC upgrades. Stefano Michelis Supervisor: Federico Faccio ELACCO mid-term review.
CSCU 411 Software Engineering Chapter 2 Introduction to Software Engineering Management.
Personal reflections, Belgrade, November 30,2009 Markus Nordberg, CERN/ATLAS.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
From Research Prototype to Production
©Ian Sommerville 2000, Mejia-Alvarez 2009 Slide 1 Software Processes l Coherent sets of activities for specifying, designing, implementing and testing.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
F R&D on Monolithic and Vertically Integrated Pixel Detectors Special Focus Meeting Marcel Demarteau LCWS08 November 17, 2008 Chicago.
Status of the MaPMT o Status quo o Ongoing work o Issues – mechanics – electronics – schedule o Conclusions LHCb meeting Milano Franz Muheim.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
Work Package 3 On-detector Power Management Schemes ESR Michal Bochenek ACEOLE Twelve Month Meeting 1st October 2009 WPL Jan Kaplon.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Advanced Semiconductor Technologies for SLHC A. Marchioro / PH-ESE.
D. Nelson October 7, Serial Power Overview Presented by David Nelson
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
M. Letheren, LECC 1 June 2001; Status of RD49 and COTS; objectives of one day review1 Status of RD49 and COTS and objectives of a one-day review RD49 -
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
IC Design and Technologies for HL-LHC A. Marchioro CERN-PH-ESE.
Trends in IC technology and design J. Christiansen CERN - EP/MIC
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Ahmed Hassan Ghulam Murtaza Umar Farooq M Mannan Razzaq BSEF08A011 BSEF08A031 BSEF08A034 BSEF08A050.
DC-DC Conversion Studies – Status Report from Aachen Tracker Upgrade Power WG Meeting February 13 th, 2009 Lutz Feld, Rüdiger Jussen, Waclaw Karpinski,
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Electronics Preparatory Group 6 June Events which happened  Meeting of all the conveners of working groups 
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ACES Mar 2007Geoff Hall1 System level requirements for upgraded tracker.
PERG Seminar Warsaw University of Technology, Collaboration of particle physicists with electronics engineers Grzegorz Wrochna Soltan Institute.
MUX-2010 DISCUSSION : W HAT DO WE NEED NEXT IN HEP.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Evaluation of Emerging Parallel Optical Link Technology for High Energy Physics John Chramowicz, Simon Kwan, Alan Prosser, Melissa Winchell Fermi National.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Microelectronics for HEP A. Marchioro / CERN-PH-ESE.
Power Working Group Summary Magnus Hansen. Introduction Most recent session at TWEPP11 TWEPP11 participant comments in the direction of: – Rather an extension.
Dr.F. Arteche EMC DEPFET Project: A general overview.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Work Package 1: Pixel detector systems for particle.
CompSci 280 S Introduction to Software Development
Detector building Notes of our discussion
Impact of EU structural funds in research and innovation: the experience of the Lithuanian 'Valleys’ April, 2016.
CERN R&D plans and Infrastructures
CMS November Upgrade Week
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Managing Project Risks and Opportunities
Basic starting point New tracker layers on the timescale of the first 5 years of running are a sensible first step Contained in the volume from pixel layer.
Status and Prospects of Tracker Services Hans Postema (CERN)
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Peter Sharp CERN CMS Tracker TWEPP Meeting in Naxos September 2008 Some Lessons from the LHC Projects Peter Sharp (CERN and IC) 18 September 2008

TWEPP Meeting in Naxos September 2008 Some Lessons from the LHC Projects The LHC Experiments have been Successfully Commissioned It is now Useful to Reflect on the Progress we have made over the Construction and Commissioning of these Complex Projects and to Ask how Best to Prepare for the SLHC ? This Presentation will Review : Access to Microelectronics Technology Microelectronics and Tracking Detectors Opto-electronics Systems Power Systems, Grounding and Shielding Off-Detector Systems Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 In the Beginning (1) In the Mid 1980s the European Electrical Engineering Communities were beginning to teach the design of Microelectronics for MSc Courses This required access to Design Tools, Lithography, Fabrication and Circuit Evaluation (~ 5μ Technology) Facilities to support the need for an increased number of trained Engineers were established throughout Europe One such Facility was an EU project called ‘Euro-Chip’ Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 In the Beginning (2) In the Mid 1980s Bernard Hyams and Terry Walker had demonstrated the readout of a Silicon Strip Detector using an NMOS Integrated Circuit. Good Performance, but Large Power Dissipation. The Solution was to use the emerging CMOS Technologies So Particle Physics began to use Microelectronics The Big Question was how could this be Done and What Facilities would be Required ? Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 In the Beginning (3) A Review of the Requirements for Electronics Facilities at CERN (Chaired by Chris Fabjan) recognized the growing Importance of Microelectronics to the Future of Particle Physics and Recommended the Establishment of a Properly Resourced Microelectronics Group at CERN Properly Resourced included having a Critical Mass of Trained Engineers, the Correct Balance of Design Tools, Technician Support, and Testing Facilities The CERN Group should act as a Centre for Particle Physics Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 In the Beginning (4) Which Design Tools should the Particle Physics Community invest in ? At RAL we had bought one License for one of a New Generation of Design Tools from ‘SDA’ (Later ‘Cadence’) It was very good, but was very Expensive even with an Educational Discount (for the MSc Courses). RAL and CERN evaluated the software and agreed that we should use it for future Particle Physics Designs How could we obtain Affordable Access to the Design Tools? Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 In the Beginning (5) The Mandate of ‘Euro-Chip’ was to Train Electronics Engineers in Microelectronics. The EU Commission accepted that most of the Training would take place in University Departments, but also accepted that ‘Not for Profit’ Research Institutes had an important role in this Training Process Hence it became possible for all European Universities and Particle Physics Institutions to gain access to the best available Design Tools through ‘Euro-Chip’ & Europractice Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 In the Beginning (6) Today RAL supports the access to the best Microelectronics Tools to ~ 650 European Universities and ~ 100 Research Institutions within the Europractice Programme. In October 1990, at the Aachen Workshop to discuss the design of Future LHC Experiments there were two significant additional meetings: The First Meeting of the Recently Establish DRDC A Meeting to Establish the ‘Microelectronics User Group’ Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 In the Beginning (7) The Microelectronics User Group became the Forum to discuss the best Design Techniques, the ‘State of the Art’ in Microelectronics Technologies and Testing Techniques. The use of Common Design Tools was important in the Transfer of Experiences and in Collaborative designs Once Design had Started it was Important to Establish an Annual Workshop to Coordinate the Work of the Community and Encourage the Use of Common Solutions Hence the LHC Electronics Workshops and TWEPP Started Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Lesson One from the LHC LHC Experiments would not have been possible without Access to Microelectronics Technology. Obtaining Affordable Access to the Technology and Tools Requires Continued Coordination and Collaboration Future Particle Physics Experiments will Continue to Require Access to these Technologies and this will Require Continued Investment in both Engineers, Tools and Facilities Without these Investments there will be No Future Particle Physics Experiments Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Microelectronics and Silicon Detectors (1) At the LEP Experiments, all Silicon Micro-Vertex Detectors used CMOS Technology which provided the required performance with the required Radiation Tolerance The Initial Concerns in the Instrumentation of Silicon Detectors for LHC were the hostile Radiation Environment and the Minimization of the Power Dissipation Fortunately, access to Radiation Tolerant Technology was becoming available from a number of Specialist Vendors Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Microelectronics and Silicon Detectors (2) It was clear that the Priority given to the Development of Radiation Tolerant Technologies would decrease with time The LHC Electronics Board (LEB) encouraged an Investigation (PJ&AM) into the use of ‘Deep Sub-Micron’ (0.25μ or 250nm) CMOS Processes for LHC Applications. The LEB Recommended to the LHC that this Project be Approved The LHC Experiments gained access to 0.25μ CMOS Technology with sufficient Radiation Tolerance and the Very Good Yield expected of a Modern High Volume Technology Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Microelectronics and Silicon Detectors (3) The Scale of LHC Silicon Tracking Detectors was larger than the LEP Detectors. This Required Much Larger Numbers of Chips (Factor ~100) and the Consequent increase in Quality Assurance (QA) Microelectronics had always required a Professional Engineering Approach to Ensure Success, This was now Mandatory, with Careful Reviews at Each Stage. With the Best Tools and Discipline the Particle Physics Community proved that it could Reach the Highest Standard Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Peter Sharp CERN CMS Tracker Marcello Mannelli and Alan Honma hold the OPAL Vertex Detector (1996) in front of the CMS Silicon Strip Detector in the Tracker Integration Facility (TIF) in October 2007

TWEPP Meeting in Naxos September 2008 Scale of the CMS Tracker Project ~ 66,000,000 Pixels and 10,000,000 Silicon Strips ~ 16,000 Modules ~ 100,000 APV Chips, ~ 20,000 ROC Chips ( 250nm IBM CMOS) ~ 40,000 Optical Fibres ~ 500 FEDs ( Front End Drivers (Off Detector Data Receivers) ) ~ 2500 Power Supplies, ~ 2500 Power Cables ~ 450 Cooling Loops ( Capable of Cooling Tracker to C) ~ 540 Physicists and Engineers (54 Institutes in 10 Countries) Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Time Scales Involved in the CMS Tracker Project Approval to Completion of Integration – 7 Years First Production Modules to Commissioned Tracker – 3 Years Strip Tracker Transport and Installation – 2 Days Strip Tracker Connection to Services – 3 Months Strip Tracker Commissioning to ~ 99% - 3 Months Pixel Tracker Transport and Installation – 1 Week Pixel Tracker Connection to Services – 1 Week Pixel Tracker Commissioning to ~ 99% - 3 Months Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Peter Sharp CERN CMS Tracker Some of the Modules used in the CMS Silicon Tracker

TWEPP Meeting in Naxos September 2008 Microelectronics and Silicon Detectors (4) It was only Possible to use Reasonably Advanced Microelectronics Technology at the LHC because there was a Very Effective Infrastructure in Existence to provide Access to Design Tools, Design Kits and Libraries, and the CERN Managed MPW scheme that provided Affordable Access to Engineering Prototypes and a Single Interface to Industry The Partnership with IBM proved Absolutely Invaluable in Understanding the Solutions to the Complex Problems that always arise in Large and Complex Detector Systems. Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Peter Sharp CERN CMS Tracker Number of Wafers Fabricated for Projects From Sandro Marchioro

TWEPP Meeting in Naxos September 2008 Why go to more Advanced Microelectronics Technologies ? The Drive for smaller feature size Microelectronics comes from the Commercial Requirements to obtain Greater Functionality at less Power for Large Volume Applications These are also the requirements of SLHC Applications Use ADCs to Compare Power Dissipation per Conversion Atlas Calorimeter 200K Channels, 16 bits at 40MHz In 250 nm Technology 262 KW 1pJ/Conv Sandro In 65 nm Technology 13 KW 50fJ/Conv Marchioro Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Microelectronics and Silicon Detectors (5) Fifteen Years Ago, Technologies were > 1μ and Wafers ≤ 6” In Future Technologies will be 8” Hence the NRE costs will be much higher !! How do we maintain the same cost / chip as we have now ? Limited Number of Design Iterations and > 100,000 Chips This will inevitably involve a small number of tightly coupled Design Centres with University Groups involved in both the Specification and Evaluation Phases Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Lesson Two from the LHC The Engineering of Large and Complex Systems Requires a Very Disciplined and Professional Approach. Adoption of Formal QA Methods has enabled the Particle Physics Community to Achieve the Highest Standards in both System Performance and Number of Iterations. When Considering the Challenges of the SLHC, We should Consider whether we need to Further Improve our Techniques and Organization Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Opto-Electronics Systems (1) There are a number of reasons for using Opto-electronics systems to Transport Data from the Detectors to the ‘Off- Detector’ Electronic Systems Electrical Isolation of the Detector from Counting Room Potential for High Speed Data Transmission Potential for both Digital and Analogue Data Transmission In the Beginning there was very little Experience in the Particle Physics Community and although there were Commercial Links there was still much R&D Activity Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Opto-Electronics Systems (2) There was a DRDC R&D Project to evaluate the Options available and to provide a Focus for the Community It was Clear from the Outset that Power would be an Issue It was Clear from the Outset that Cost would be an Issue The CMS Tracker chose to use Analogue Links to provide more Diagnostic Information in Commissioning the System The Atlas Tracker chose a Binary Link System Both Detectors used Links for both Data and Control Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Opto-Electronics Systems (3) Initially it was thought that the Cost would be Different The Final Costs were : CMS42,800 Links Production Cost294 CHF / Link Atlas12,264 LinksProduction Cost284 CHF / Link Considering that almost every aspect of these Systems were Different this is an interesting Conclusion To Engineer Large Complex Systems it is Crucial to Establish a Excellent QA at every Stage of the Project Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Opto-Electronics Systems (4) It is Crucial to Test at every Stage of Procurement, Assembly and System Commissioning It is Crucial to do Complete System Tests before the starting Production Procurement. Details Compromise Quality CMS Tracker0.04% Dead Links, 0.38% Problematic Links Atlas Tracker0.8% Dead Links, 0.6% Problematic Links The CMS Analogue Links required more QA from the Outset and this probably resulted in the Different Yields Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Opto-Electronics Systems (5) Lessons from the CMS Tracker Experience Avoid fibre pig-tails. Do not allow excessive fibre-slack without corresponding management scheme. Use Ruggedized ribbon/fibre only. Avoid simplified and/or compact connectors which are difficult to dismount and clean. Develop and distribute fibre-test tools which allow on-line testing, providing immediate channel quality feedback during construction. Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Opto-Electronics Systems (6) Lessons from the Atlas Tracker Experience Better ESD precaution More longer term testing of the VCSELs at an earlier stage in the assembly to weed out any damaged devices. Avoid all use of fragile single fibres on the detector. Always used balanced codes. Ensure that QA is performed for identical conditions to the final system. Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Lesson Three from the LHC All of the Experience in Constructing and Commissioning and the Quality Assurance of the Opto-Electronics Systems for LHC must be Preserved Most of the ‘Know-how’ is stored in the Groups that have Successfully Engineered these Systems It is Crucial to Maintain a Critical Mass of Engineers with the Facilities and Equipment to ensure that the Present Systems Maintain their Performance and that the Engineering of Future Systems is Built on the Experience from the LHC Projects Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Power Systems, Grounding and Shielding (1) Initially there was Concern that it would not be possible to Install the Power Systems in the LHC Caverns because of both the Radiation and the Magnetic Field Environments These are not Problems that Commercial Systems commonly encounter and Hence there were No Commercial Solutions The Alternative was to Place the Power Systems Outside the Caverns with the Additional Cost of Cables and the Increase in the Power Dissipation Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Power Systems, Grounding and Shielding (2) There had also been a contraction in the Number of Companies providing Electronics for Particle Physics Applications Development Projects were started with Two Companies (CAEN and Wiener) to Provide both Radiation and Magnetic Field Tolerant Power Systems Both Projects were Successful and Provided the Range of Systems to meet the Requirements of the LHC Projects However Most Power was Transmitted at Low Voltage (< 3V) and Hence the Transmission Power Losses were Very Large Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Power Systems, Grounding and Shielding (3) Initially Compact Radiation Tolerant Voltage Regulators were Not Available. Hence the CMS Tracker did not have ‘On-Detector’ Voltage Regulation. A Very Successful Partnership with CAEN developed a Power System (including a Low Inductance Cable) that delivered both Low Voltage Power and the Bias for the Silicon Sensors without Introducing Transients at the Silicon Modules that could have damaged the Chips An Extension of this System Development became a Standard Commercial Product Range Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Power Systems, Grounding and Shielding (4) It is Crucial to design a Complete System, which involves Power Supplies, Cables, Control and Safety Systems, and Grounding and Shielding Systems In General this did Not Take Place at LHC Initially a lot of Effort was absorbed in Engineering the Front-End Chips and Electronics Coordinators worked hard to bring Power, Grounding and Shielding Issues into Focus On Occasion Schedule Pressure prevented the attention to the detail that would have improved noise immunity by orders of magnitude. Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Power Systems, Grounding and Shielding (5) Fortunately, Good Engineering at the Integration Stage Reduced the Grounding & Shielding Issues to a Manageable Level and so far there have been no Show Stoppers In General the Particle Physics Community is not well Equipped to Diagnose and Solve Grounding and Shielding Problems. Since the Power Systems are in the Experimental Caverns, System Reliability is an Important Issue. It has been important to ‘Burn In’ the Power Systems before Installation in the Experiments, and to Log and Follow up all Problems Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Lesson Four from the LHC It is Important to Design Complete Power Systems From the Start, which involves Power Supplies, Cables, Control and Safety Systems, and Grounding and Shielding Systems Solving Problems is always Easier, and Usually Cheaper at an Earlier Stage of the Project. It is Crucial to Maintain a Critical Mass of Engineers with the Facilities and Equipment to ensure that the Present Systems Maintain their Performance and that the Engineering of Future Systems is Built on the Experience from the LHC Projects Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Off-Detector Electronics Systems (1) The Engineering of the ‘Off-Detector’ Electronics Systems has been dominated by the Development of FPGA Technology Early Developments of some Systems fixed the Technology before FPGA Technology was Available, Other Systems Adapted to the New Technologies Large Systems with many FPGAs Need Very Careful Engineering to Delivery High Yield, Highly Reliable Systems Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Off-Detector Electronics Systems (2) The Issues with FPGAs is that Many People can write the Firmware required to programme an FPGA, but Not Many People can Engineer a Reliable System that is Easy to Commission and Maintain. Other Issues are Obsolescence of both Hardware and Software and the Version Control of the Firmware Again QA and Attention to Detail in the layout of Large Multi-Layer Circuit Boards are Essential Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Off-Detector Electronics Systems (3) A Example of Good Practice is the Front-End Driver System for the CMS Tracker. It involves 500 9U Boards (See next Slide) The Fabrication Company was Chosen with Care 99% of the Boards worked on Receipt from the Fabrication Company, who were also responsible for Board Fabrication & Board Testing, with Test Equipment supplied by the User The System was Easy to Commission and has proved to be Very Reliable Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Peter Sharp CERN CMS Tracker Peter Sharp CERN CMS Tracker The CMS Tracker FED (Front End Driver) A 9U Board

TWEPP Meeting in Naxos September 2008 Off-Detector Electronics Systems (4) The Issues are by now Very Familiar: Careful Systems Design Careful Tuning and Reviews of the Specifications Professional Design Teams for Hardware, Firmware and Software, Commissioning and Maintenance Systems Careful Preparation of Commissioning and Performance Evaluation A QA System that promotes Continuous Improvements Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Lesson Five from the LHC Large Complex Systems Can only be Efficiently Commissioned and Maintained if Best Engineering Practice has been followed throughout the Design of the System Too Often Gifted Individuals become Single Point Failures LHC Systems have to be Maintained for ~ 10 years well beyond the Commitment of Individuals Hence it is the Institutions that must Underwrite the Commitment to Maintain the Systems for the Life of LHC It is the Institutions that must maintain the Engineering Infrastructure that Guarantees the Long Term Commitment Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Summary (1) The Problems faced in the Engineering of the Electronics Systems have been Significantly Larger and More Complex than any Previous Particle Physics Projects Success has only been Possible by Merging Many Gifted Individuals with an Engineering Structure that has Provided the Environment in which the most Creative Ideas could be Transformed into Reliable and Maintainable Systems Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Summary (2) It is Important that we recognize what has worked well and what is required to Maintain the Improvement Coordination, Collaboration and the Search for Common Solutions to avoid Duplication have been Very Important We should Continuously Review our Organization and Adapt to Changes in both Requirements and Technologies We must Maintain a Critical Mass of Engineers with the Facilities and Equipment to Build on the Experience of LHC Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Summary (3) In General our Approach to System Design could be Improved. It is Very Difficult to Control the System Design without having Control of the Budget. Hence the Method of Funding LHC Projects has made this more Difficult Formal QA Systems need to be Adapted to the Particle Physics Environment. In Many Projects, more in-depth Reviews would have found Problems much Earlier and Hence saved both Time and Money Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Conclusions The LHC Electronics Systems have been Very Successful and the Community should Reflect with Pride at this Massive Achievement Many of the Organizations Establish at the Beginning of the Projects Worked Well. New Working Groups Work Well We need to Build on these Experiences and Ensure that we have a Strong Community to take on the Challenges of SLHC Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Electronics at SLHC Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Peter Sharp CERN CMS Tracker Peter Sharp CERN CMS Tracker An Optimistic Plan for LHC Luminosity

TWEPP Meeting in Naxos September 2008 Peter Sharp CERN CMS Tracker cm -2 s

TWEPP Meeting in Naxos September 2008 Some of the Issues for Electronics at SLHC Which Microelectronics Technology Should we Use ? Do we have the right Organization in Place to Obtain Cost Effective Access to Advanced Technologies ? Which Interconnection Technologies Should we Use ? Will we have Access to Cost Effective Optical Links ? Can we Transmit Power to the Detector at High Voltage and obtain Efficient Conversion to Low Voltage at the Detector ? How will Future Off-Detector Systems Evolve ? How do we Establish Effective Partnerships with Industry ? Peter Sharp CERN CMS Tracker

TWEPP Meeting in Naxos September 2008 Thank You Peter Sharp CERN CMS Tracker