If it’s not safe, don’t do it that way Engagement of Marine Surveyors Meeting with Vessel Agents.

Slides:



Advertisements
Similar presentations
Interfacing Risk and Systems Engineering – Left Shift Risk Management
Advertisements

Meezan Tijarah (Finished Goods).
Slide 2 OST 07-2 HEMS Performance JAR-OPS 3.005(d) HSST WP-07/3.4 HSST EASA Form 07/001.
12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
Capture of accurate job, audit & other records for your mobile workforce Solution.
This presentation, including any supporting materials, is owned by Gartner, Inc. and/or its affiliates and is for the sole use of the intended Gartner.
Presentation of the Project “Single Window – Local Solutions”
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
Nigel Hales 24 July 2014 Miller Harris in Business.
Assets and Liabilities Unit 9 June 20131Dr Vidya Kumar.
Royalties for Regions – Information Briefing 10 October 2014 Presenter:David Horton Chief Operating Officer.
1 LAYTIME AND DEMURRAGE RECENT CASES HOUSTON March 29, 2007 William J. Honan Holland & Knight LLP.
Guidance Note Work Health & Safety Obligations for Independent Contractors March 2015.
10+2 Importer Security Filing Brought To the Importer By.
Bridge Owners Forum May 2008 ESDAL Stakeholder Management Team bringing service to life.
WEBINAR SERIES: March 12: General overview of WHP Planning Process March 19: In depth discussion and review of the Data Elements March 26: Requirements.
Massimiliano Di Pace1 INTERNATIONAL PAYMENTS Handling international payment can be complicated and risky The problems can be: - currency - transfer of.
Office of Marine Safety Regulatory Issues Liam LaRue.
Offshore Safety Directive (OSD) Update on the Offshore Petroleum Licensing Regulations 2015 Derek Saward DECC EDU OGED 18 th December 2014.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
Inspection and regulation from September The government’s vision for early years with a revised Early Years Foundation Stage provides the timetable.
Hours Of Service: Are you prepared ?. Hours of Service– FMCSR Applicability: 49 CMR Part 395 – Hours of Service of Drivers Hours of Service Compliance.
DTS Disaster Recovery Service Fact and Fallacy By Marianne Chick, CBCP DTS Disaster Recovery Planner.
South West Specialised Commissioning Group Specialised Service for Morbid Obesity in the South West.
Technology Programme Autumn 2005 Autumn 2005 Competition The Application and Assessment Process Peter Miles TUVNEL Ltd.
Highworth Town Council The Localism Act Neighbourhood Planning Workshop May 2012.
Land Promotion Opportunities. In Simple Terms Emcland partner land owners to promote their site through the planning process. We use our expertise and.
Protecting the Food Supply The Bioterrorism Act of 2002 (BTA) FDA’s role in the BTA Final Rule Requirements UTi as U.S. Agents Prior Notice Requirements.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
Marine Services Condition Assessment Condition Assessment © 2003 Lloyd’s Register of Shipping.
Challenges for Dry Bulk Terminals in Developing Regions.
Lessons Learned Process – A Strawman.  Lessons Learned  “To pass on any lessons that can be usefully applied to other projects”  “The data in the report.
1 Tenant Led Stock Transfer – will new regulations open doors for TMOs? Board update Tom Hopkins FCIH Managing Director.
+ OTC Derivative Clearing Summary Making Great Ideas Become Reality”
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
® Registered trademark of The Empire Life Insurance Company. Policies are issued by The Empire Life Insurance Company. MGA Compliance: An Overview March.
BT Wholesale Products June, SOR Management Tool Angus Flett John Skingle.
SECTION A- QUESTION 1 (g) Question: List 4 circumstances under which a director will be required to vacate or cease to hold office.
Strategic Plan 2012/17 and Annual Performance Plan 2012/13 INDEPENDENT POLICE INVESTIGATIVE DIRECTORATE (IPID) 27 MAY 2015 BRIEFING TO THE PORTFOLIO COMMITTEE.
Cargo Community System - CSS
Dublin City Council Environment SPC: Lead Briefing 24 th June 2015.
From GlobeCast Asia Broadcast Service contract:. From GlobeCast Asia Broadcast Service contract(Cont’d):
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
This presentation, including any supporting materials, is owned by Gartner, Inc. and/or its affiliates and is for the sole use of the intended Gartner.
Mechanical  Do the service agreement’s temperatures minimally satisfy your equipment’s needs? If not, it’s clearly a no go.  Confirm the typical repeat.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
Essentials of Incident Reporting. An Incident (or Near Miss) is: “any unexpected or unintended event … that leads to (or could have led to) harm, loss.
Charging for Pre–application Planning Advice Members Seminar 31 March 2014.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
Towage Procurement Process – Industry Briefing 05 May 2014.
ENTRY INTO DANGEROUS/ ENCLOSED SPACES Changes to UK regulations Julie Carlton Seafarer Safety and Health Manager February 2016.
Complaint Handling What is a complaint ‘ Any expression of dissatisfaction, whether oral or written, and whether justified or not, from or on behalf.
Transitions: An Agent’s Perspective Leslie Covington E Journals Account Manager EBSCO Information Services.
Rick Statham HAS Dip, CMIOSH (Joint Managing Director) Safety & Access Ltd SG4:10 Preventing Falls in Scaffolding Revised Industry Guidance.
Activity processes of brokers in carrying out operations on the customs clearance of goods Activity processes of brokers in carrying out operations on.
Phillipa Silcock Using and discharging conditions.
Framework for Introducing OPRC Christopher R. Bennett Sr. Transport Specialist EASTE.
Capacity Assessment of Implementers February 2014.
Presentation to the Portfolio Committee on Communications on the:
Arbitration and Conciliation (Amendment) Act, 2015 and its impact on International Commercial Arbitration Emerging Trends in International Commercial.
PCI Compliance Service
Content of Tender Dossier - Instructions to Tenderers - Tenders
DTS Disaster Recovery Service Fact and Fallacy
NWA Suitability Criteria
Oleh : Ir. Sjaifuddin Thahir, MSc.
Tree related planning legislation
Lessons Learned Process – A Strawman
Progression and Advancement
Enabling Large Scale Utilisation of Class 3
Presentation transcript:

If it’s not safe, don’t do it that way Engagement of Marine Surveyors Meeting with Vessel Agents

If it’s not safe, don’t do it that way 2 Context  PWCS has had several recent occurrences of vessels being overloaded or near over loadings.  As an interim measure PWCS has engaged Marine Surveyors since June 2008 to attend vessels at the interim draught survey stage to reduce the risk of the vessel being overloaded.  In addition some vessel owners/charterers also engage a Marine Surveyor to attend the vessel from interim draught survey stage to completion of loading the vessel. This means at time two Marine Surveyors have attended the vessel.  PWCS has been considering and consulting with coal exporters and the industry regarding a long term solution since. Three options have been considered: PWCS engaging the Marine Surveyors, coal exporters engaging the Marine Surveyors, or requiring the vessels to engage the Marine Surveyors.

If it’s not safe, don’t do it that way 3 Solution  The longer term solution is to require vessels, at their cost, to engage a Marine Surveyor to attend the loading of each vessel. The Marine Surveyor will be required to attend from the commencement of the loading pass performed immediately prior to the interim draught survey through to the completion of loading of the vessel.  The key benefits are: 1) Risk mitigation against overloading (or under loading). 2) Marine Surveyor is independent of PWCS. 3) Shorter and more reliable interim survey delays and trimming times and therefore completion times. 4) Potential for more tonnes to be loaded = $$$.

If it’s not safe, don’t do it that way 4 Solution  This requirement will be included in the Coal Terminals Information Handbook (CTIH) and enforced via vessel suitability provisions in the Coal Handling Services Agreement (CHSA).  Whilst the onus will be on the vessel to engage the Marine Surveyor, PWCS will enforce this requirement via the CHSA with the Customer.  PWCS’ Coal Loading Plan will include a mandatory section for notification of the Marine Surveyor to carry out the interim draught survey. PWCS will confirm the appointment of the Marine Surveyor before granting permission for the vessel to berth.  Failure to appoint a Marine Surveyor will affect the vessels suitability to load at the Terminals and PWCS has the ability to change the order of loading of the vessel for the failure to submit a valid Coal Loading Plan.

If it’s not safe, don’t do it that way 5 Proposed Amendments to CTIH The proposed wording is as follows:

If it’s not safe, don’t do it that way 6 Proposed Amendments to CTIH