Safety and Mission Assurance Lockheed Martin Space Operations (LMSO) Science, Engineering, Analysis, and Test Operation Safety and Mission Assurance Activity.

Slides:



Advertisements
Similar presentations
Quality Assurance U. S. ITER Project Office U.S. ITER Project 1 November 15, 2006 U. S. ITER QUALITY ASSURANCE Gail Okulczyk, Presenter U. S. ITER Quality.
Advertisements

AS9102 First Article Inspection Report
TurnKey Project Management Services Capabilities Briefing.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.
Final/Shipout Inspection Approved for Public Release.
First Article Inspection Report
SUBSAFE Approved for Public Release
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
© Copyright 2009 TEM Consulting, LP - All Rights Reserved Presentation To Travis County, TX - May 27, 2009Rev 1 – 05/22/09 - HSB US Voting System Conformity.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
AFISS Prospectus of Services AFISS offers HACCP food safety and food quality systems development and management services including preparation for regulatory.
Quality Management System
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
ISO 9000 Certification ISO 9001 and ISO
"Welder Certification" The purpose of this presentation is to introduce you to the various aspects of welder certification. This is not intended to cover.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
First Article Inspection
Creating Lasting Change for Your Business ISO 9001:2000 Management System Overview.
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
The Maintenance and Engineering Organization
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
ARCH – 4601 Architecture Firm Presentation Popham Walter Architects Jason B. Ashe.
From Research Prototype to Production
Supplier Maintenance and Development
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
PSPC/Coating Technical File (CTF)
INSPECTION AND ACCEPTANCE CRITERIA. PRODUCT CONFORMANCE Dimensional conformance - within tolerances as defined on product drawing Dimensional conformance.
Constellation Space Transportation Planning Office July 30, 2009.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
Controlled Storage Training Presented by Marcie Dickson Honeywell Quality Engineer NASA Safety and Mission Assurance
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
Safety & Health Considerations in Accommodating Commercial Activties David Loyd, JSC Safety & Test Operations 2013 NASA Safety Directors & Occupational.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
Safety and Mission Assurance Plan AMS-02 R EBASELINING O UTBRIEF July 15, 2004 NT/David Kaplan
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
EFW DFB Systems Assurance
EFW DFB Systems Assurance
Quality Management Process
THEMIS Mission Assurance
ISUAL Product Assurance
Chapter 4 Aviation Industry Certification Requirements
First Article Inspection
Planetary Protection at ESA
GLAST Large Area Telescope:
Task 8 Describe the documentation required for particular applications (such as design briefs, specification sheets, request for change orders).
Construction Materials and Workmanship
Lockheed Martin Canada’s SMB Mentoring Program
ADVERS Third largest heater manufacturer in the world
Marketing/ Sales/Quote Management/ Improvement
Emulsion Task Force Meeting
First Article Inspection
CUSTOMER (Requirements) CUSTOMER (Satisfaction)
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
BS EN 10204:2004 Metallic Products – Types of inspection documents
BS EN 10204:2004 Metallic Products – Types of inspection documents
ISO 9001:2000 Management System Overview
Standard Business Processes
Presentation transcript:

Safety and Mission Assurance Lockheed Martin Space Operations (LMSO) Science, Engineering, Analysis, and Test Operation Safety and Mission Assurance Activity (S&MA)

ANSI/ISO/ASQ Q Quality Management System Certified Det Norske Veritas (DNV) for: THE DESIGN, DEVELOPMENT, MANUFACTURE, ASSEMBLY, TEST AND SERVICING OF HARDWARE, GROUND SUPPORT EQUIPMENT AND ASSOCIATED SOFTWARE FOR SPACEFLIGHT AND COMMERCIAL USES.

Quality Assurance toward Certification for Flight Begins at project definition and ends at time of LMSO shipment to customer. Establishment of quality requirements for project to assure compliance with flight hardware requirements. –Workmanship –Materials –Welding –Certificates of Compliance –Traceability Participation in design reviews Preparation of Work Documents (WD) In process inspection, receiving inspection, test witness Preparation of Acceptance Data Package (ADP) Shipment Authorization

Quality Engineering and Inspection Consultation with project engineers Drawing Review Receiving, In-process, Shipping Inspection Qualified Vendor List (QVL) Statement of Work and Purchase Request Review Work Documents (WD) –Task Performance Sheet (TPS) –Discrepancy Reports (DR)

Quality Engineering and Inspection Receiving Inspection Test Facility (RITF) Acceptance Data Package (ADP) Shipping Documentation

Quality Assurance Personnel Dave Elmore, Quality Assurance and Support Services Office Manager – Dave Young, S&MA Quality Assurance Representative – Gene Rawlins, Quality Engineering Lead – Steve Caldwell, Project Quality Engineer – Gloria Haynes, Quality Inspection Lead –