#6- Effects of Agile on Pre-Contract Award Subtopics Acquisition Strategy Writing RFP’s allowing for Agile IPM Methodology Evaluating Bidders in Agile.

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

Course: e-Governance Project Lifecycle Day 1
1 Follow Up Items  What are Unbalanced Bids?  What are Best Value Contracts?  Analysis of Contract Approval Limits.
4/28/20151 PRESENTED BY NAKABAGO JOHN CONTRACT MANAGEMENT AND ADMINISTRATION IPPU PRESENTATION JOHN NAKABAGO.
Agile and Medical Device Software
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Slide 1 Performance Based Contracting Slide 2 Adopting A Performance Mindset The Basic Principle: Managing Results Through Measurement.
1 Software Testing and Quality Assurance Lecture 34 – SWE 205 Course Objective: Basics of Programming Languages & Software Construction Techniques.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
By Collin Smith COBIT Introduction By Collin Smith
Chapter 12: Project Procurement Management
Project Management Outline of Chapters 1-6. Chapter 1 – Project Management Concepts Definition of a project and its attributes Key constraints within.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
National Education Consulting Inc. Canadian Public Procurement Council Forum 2007.
Chapter 3: The Project Management Process Groups
Above and Beyond... The Essential Role of Capture Managers in The New Normal Environment 2014 Mid-Atlantic Conference & Expo Sheraton Premiere.
IRM 101 Critical Design Review For March 2015 Update Status 11/21/2014.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Other Planning Processes: Final Planning Touches
European Public Sector Information Systems Conference -- September 30, 1998 Case Study: Building the Skills that Produce Success - A Case Study from the.
Desired Quality Characteristics in Cloud Application Development Leah Riungu-Kalliosaari.
Source Selection. What is Source Selection? Source Selection is the process of conducting competitive negotiations. Source Selection allows the Government.
Chapter 2 Needs Identification. 2 Learning Objectives Review the project life cycle –identifying needs –proposing a solution –performing the project –terminating.
Performance Based Contracting Florida State University Purchasing Department.
12-1 Project Management from Simple to Complex This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
© 2012 | All Rights Reserved | 805 King Farm Boulevard | Suite 300 | Rockville, Maryland | P | F | Transitioning.
The Challenge of IT-Business Alignment
Chapter 2 Needs Identification
IRM304 CDR Course Manager: Denny Involved Competency Leads: 26 (Cybersecurity)-Denman, 19 (Measurement)-Denny, 7 (DBS)-Corcoran [Capability Planning],
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David J. Paveglio Contracts Administrator Laboratory Office Buildings CFAC Review - November 9-10, 2009.
YOUR PROPOSAL CAN LEAD TO CONTRACT AWARDS
ODOT Procurement Office (OPO) Diana L. Foster Chief Procurement Officer.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Alpha Contracting Sole Source Negotiations between Government and Industry (13 CFR (c)(2))
CLE 076 Introduction to Agile Software Acquisition CLE Introduction to Agile Software Acquisition1.
CLE 076 Development Team Meeting #2 12/4/2015 CLE Introduction to Agile Software Acquisition1.
1 Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) Area 3 Pre-Proposal Site Visit HSBP1015R0040 Sectors EL PASO / BIG BEND, TX
Capabilities Analysis Briefing for Chancellor and Senior Leaders.
#2-What is Agile? Why Agile? Subtopics 1- Agile motivation for software / systems 2- Agile tenets and principles 3- Agile as a risk mitigation strategy.
#7-Effect of Agile on Post-Contract Award Subtopics #1- Documentation #2- Regulatory oversight #3- Participating in Agile reviews #4- Measurement ELO ELO.
Evidence about the Benefits of CMMI ® What We Already Know and What We Need to Know Joe Jarzombek, PMP Deputy Director for Software Assurance Information.
1 1-Introduction 2-What/Why is Agile? 3-Basic Agile Concepts 4-Effects of Agile on Program Office Staff 5-Effects of Agile on Engineering Staff 6-Effects.
#7-Effect of Agile on Post-Contract Award Subtopics Documentation Regulatory oversight IBR Participating in Agile reviews Performance Measurement ELO ELO.
Module 2: What is Agile? Why use it? TLO: Given a DoD program involved in software development, the student will recognize situations where applying agile.
Safety & Health Considerations in Accommodating Commercial Activties David Loyd, JSC Safety & Test Operations 2013 NASA Safety Directors & Occupational.
CLE 076 Introduction to Agile Software Acquisition CLE Introduction to Agile Software Acquisition1.
Module 3: Basic Agile Concepts – when and where to apply it TLO: Given a contractor’s development approach student will recognize alignment with agile.
LOG235/236 Performance Based Logistics Bruce Hatlem Logistics Functional IPT September 2007.
Table of Contents – Module 0 Overview of files associated with the Cloud CLM CLE - Module 0 - CLM Table of Contents1.
Module 5: Effect of Agile on Engineering & Test Staff TLO: Given a DoD program involved in software development using Agile IPM methodologies, the student.
Block 7 Project Procurement Management. ► The processes required to acquire goods and services from outside the organization ► Purchasing  Procurement.
© 2005 Windelberg Consulting, LLC EDUCAUSE Mid-Atlantic Regional Conference January 12-14, 2005 Outsourcing: Look Before You Marjorie Windelberg, Ph.D.
RATIONAL UNIFIED PROCESS PROCESS FRAMEWORK OVERVIEW.
Module 7: Effect of Agile on Post-Contract Award TLO: Given a DoD program involved in software development using Agile philosophy, the student will identify.
3-Basic Agile Concepts Subtopics 1-The agile methods landscape 2-Common agile concepts and practices 3-Differences between traditional development and.
Module 4: Effect of Agile on the DoD Program Office TLO: Given a DoD program involved in software development using Agile philosophy methodologies, the.
CLE Introduction to Agile Software Acquisition
CLE Introduction to Agile Software Acquisition
5 – Effect of Agile on Engineering & Test Staff
CLE Introduction to Agile Software Acquisition
ISA 201 Intermediate Information Systems Acquisition
#2-What is Agile? Why Agile?
Phase 2 Tollgate Review Discussion Template
Phase 2 Tollgate Review Discussion Template
Phase 1 Tollgate Review Discussion Template
Case Study for Indian Petroleum Client
Phase 2 Tollgate Review Discussion Template
Presentation transcript:

#6- Effects of Agile on Pre-Contract Award Subtopics Acquisition Strategy Writing RFP’s allowing for Agile IPM Methodology Evaluating Bidders in Agile Contracting Environment Contracting ELO ELO 1 - Identify 3 pre-award characteristics of an acquisition strategy that allows for Agile solicitations. ELO 2 – Recognize technical aspects that contribute to the evaluation of bidders on an Agile RFP. ELO 3 – Identify the benefits and risks associated with various contract type(s) in an Agile IPM environment. CLE Introduction to Agile Software Acquisition 1 Module TLO: Given a DoD program involved in software development, the student will identify key pre-contract award activities in an Agile IPM environment.

ELO Mapping to Sub-topics CLE Introduction to Agile Software Acquisition 2 SubtopicELO(s) Acquisition Strategy1 Writing agile enabling RFPs1, 2 Evaluating Bidders in Agile Contracting Environment2 Contracting3

Subtopic 1: Acquisition Strategy Types of Acq. Strategies Software Development as a Service (SDAAS) Product focus Level of involvement of the Govt Program Office to lead technical effort Applying flexibility within the acquisition life cycle to accommodate agile approaches when applicable. Index of Major Takeaways How to write acquisition strategy language to allow for agile. Assessments: CLE Introduction to Agile Software Acquisition 3

Subtopic 2: Writing agile enabling RFPs Technical review Level of detail of work effort Frequency and detail of CDRLs Flexible prioritization of release contents Index of Major Takeaways – The Contract is only as good as the contracting relationship, leadership must foster environment for good and effective contract management in Agile environment. Assessments: CLE Introduction to Agile Software Acquisition 4

Subtopic 3: Evaluating Bidders in Agile Contracting Environment How well proposal illustrates the methodology Addressing Agile Myths from Module 3 Understanding risk identification and mitigation Evaluating past performance Both sides understand their roles Intended cadence of interaction Index of Major Takeaways Avoid dictating contractors method of execution. Understanding risk identification and mitigation. Logical approach to proposed effort. Assessments: CLE Introduction to Agile Software Acquisition 5

Subtopic 4: Contracting Cost Reimbursable Incentive structure reflects desired performance (benefit or risk depending on application) Fixed Price Best effort (benefit or risk depending on application) Index of Major Takeaways The contract “type” is not as important as incremental delivery of CDRL content Determining the contract type should be based on the understanding of system context, not the use of Agile approaches Assessments: CLE Introduction to Agile Software Acquisition 6