Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.

Slides:



Advertisements
Similar presentations
Software Analysis Tools
Advertisements

Charlie Salamone Cape Power Systems Consulting Presented at the Northeast Sustainable Energy Association’s Wind Project Development Strategies for New.
På väg mot en elförsörjning baserad på enbart förnybar el i Sverige En studie om behov av reglerkraft och överföringskapacitet Version 4.0 Lennart Söder.
Will CO2 Change What We Do?
ACOT Intro/Copyright Succeeding in Business with Microsoft Excel
MANAGERIAL ACCOUNTING
Financial Model.
Hawawini & VialletChapter 7© 2007 Thomson South-Western Chapter 7 ALTERNATIVES TO THE NET PRESENT VALUE RULE.
Capital Budgeting Decisions
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Making Clean Local Energy Accessible Now Storage Bid Evaluation Protocols Role of CEP, Quantifiable Benefits Stephanie Wang Policy Director Clean Coalition.
Quantifying Emission Reductions from Local Government Actions Bruce Biewald Presentation to Metropolitan Washington Council of Governments Energy and Air.
EWEC 2007 Milano Drs. J.P. Coelingh, senior consultant Wind and power derivatives in project financing.
Metrics for Process and Projects
EE535: Renewable Energy: Systems, Technology & Economics
CAPITAL BUDGETING AND LEASING Chapter 4. Investment The addition of durable assets to a business Disinvestment is the withdrawal of durable assets from.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Wind Energy Forecaster A Web-based Wind Energy Prediction Tool Aditya Trivedi ’16 Advisor: Dr. Eric Larson.
Renewable Energy Hedges 101 SNHU Office of Sustainability and Eco Power Hedge, LLC © EPH, LLC 2007 E co Power Hedge.
Uncertainty in Wind Energy
Fabozzi: Investment Management Graphics by
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Presentation of Wind Data  The wind energy that is available at a specific site is usually presented on an annual basis.  There are several methods by.
GreenHadoop: Leveraging Green Energy in Data-Processing Frameworks Íñigo Goiri, Kien Le, Thu D. Nguyen, Jordi Guitart, Jordi Torres, and Ricardo Bianchini.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Power Generation from Renewable Energy Sources
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Capital expenditure decisions: an introduction
Project Planning and Capital Budgeting
ECE 7800: Renewable Energy Systems Topic 12: Economic Analysis of Renewable Energy Systems Spring 2010 © Pritpal Singh, 2010.
Chapter 7 Fundamentals of Capital Budgeting. 7-2 Chapter Outline 7.1 Forecasting Earnings 7.2 Determining Free Cash Flow and NPV 7.3 Analyzing the Project.
Iowa Wind Entrepreneurship Workshop Steps in Organizing, Utility Agreements, and Financing October 21, 2005 Iowa Community Entrepreneurship Academy Manning.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Perfect Competition *MADE BY RACHEL STAND* :). I. Perfect Competition: A Model A. Basic Definitions 1. Perfect Competition: a model of the market based.
Southern Taiwan University Department of Electrical engineering
Global WINDPOWER Chicago, Illinois Assessment of Potential Improvements in Large-Scale Low Wind Speed Technology Joseph Cohen Princeton Energy Resources.
Unit 4 – Capital Budgeting Decision Methods
Lidzbark Warmiński heating plant in RETScreen Software Justyna Pawilonis 28 March 2007 Lidzbark Warmiński.
Northwest & Intermountain Power Producers Coalition Capacity Factor Impact on Wind Power Financials Ted Risher The Energy Group February 27 th, 2009.
ECE 7800: Renewable Energy Systems
Program Requirements Alternative Energy Supplement Design Requirements Problem Statement Testing Economic Analysis Energy System Program Requirements Calculate.
The nature and importance of economic feasibility studies for investment projects 1.
Conceptual Tools The creation of new and improved financial products through innovative design or repackaging of existing financial instruments. Financial.
Proposed Generation Expansion Process For Review and Discussion March 1, 2011.
Power Generation from Renewable Energy Sources Fall 2012 Instructor: Xiaodong Chu : Office Tel.:
Financing Considerations for Renewables and Energy Efficiency Projects By Guido Alfredo A Delgado August 28, 2006 FUTURE ENERGY SCENARIOS TOWARD SUSTAINABLE.
Group 4B: Bergold, Kajander, Leppä, Niemeläinen, Pesonen.
Feasibility Study.
FURTHER INFORMATION ON MISO FTR AUCTIONS For SPP RSC Discussion October 6, 2010.
Renewable Energy Project Analysis Course - Module 1
Capacity Planning Pertemuan 04
Engineering, Policy, Finance
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
FINANCIAL ANALYSIS. What is Financial Analysis? The process of evaluating businesses, projects, budgets and other finance- related entities to determine.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Clean Energy Project Analysis Course Clean Energy Project Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – 2004.
Wind Production intermittency Cross border compensation: what to expect in Western Europe? Analysis of Winter 2010/2011 Hubert Flocard and Jean-Pierre.
RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission.
MGT601 SME MANAGEMENT. Lesson 17 Financial Feasibility of SMEs.
15ELP044: Energy System Investment and Risk Management Unit 2B: Energy Economics and Markets Paul Rowley 1, Simon Watson 1 and Andy Williams 2 1 CREST.
Prepared for the Annuity Reserve Work Group By Steve Strommen FSA, CERA, MAAA May 1, 2013 POTENTIAL RESERVE METHODOLOGY.
Project Evaluation and Programme Management
RENEWABLES AND RELIABILITY
The Feasibility Study: something we already know
Chapter 9 OIS Discounting, Credit Issues, and Funding Costs
Data management: 10 minute data, 8760 hours Data Q/C, error checking
Engineering, Policy, Finance
Portfolio Analysis Mike Hopkins
Software Analysis Tools
Presentation transcript:

Resource Analysis

Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the issues discussed earlier. For example, we : –Understand what factors are important and not very important in cost and benefit analysis –Further elaborate on risk analysis –Evaluate tax benefits in different scenarios –Consider alternative structuring issues

Wind Resource Assessment

Wind Studies The first step for the project lenders is to conduct an in-depth analysis of the owner's feasibility study and possibly even hire a consultant to conduct an independent feasibility study. Such studies will analyze the wind resource data and should demonstrate the financial viability of the project. These studies will detail technical, financial and other aspects of the project and are crucial to the lender in its risk assessment of the proposed project. Independent Engineers compute the probability of different wind availability. However, these studies are based on the wind measurements for previous years and for a particular site, and while the studies accommodate the fact that the year in which the measurements were taken may have been a particular good or bad year, there is no guarantee that there will not be substantially less wind in the future. Off-taking utilities are largely able to mitigate this risk because it is possible to get very accurate wind forecasts, which enables alternative sources to be used in order to maintain grid stability and supply if necessary. For the project itself, however, no wind means zero cash flow. Such risk could, in theory, be hedged or covered by insurance, and while some attempts have been made in that respect, such tools are not yet a common feature and thus remain a risk which has to be factored in.

Wind Speed Risk A potential and significant risk for any energy project is the underlying resource for its generation – in this case wind. Identifying the availability of wind is paramount. This has two aspects. –The first is the question of whether a particular site has sufficient wind speeds. This issue is addressed by the lending banks insisting on long-term – usually at least 12 months – wind measurements, which are then used as the basis for a number of wind studies. Banks usually insist on at least two of those coming from reputable wind experts. These wind studies give an estimate of the annual electricity output of a project, based on a probability curve, usually 75% or 90%, that the project will generate x number of full load hours. Depending on the wind turbine used, there is therefore a 75% or 90% respectively, probability that the turbine will generate y kW/h per year when in service.

Value of Renewable (Wind) on Market Basis Assumptions –Wind Power Curve –Wind Capacity Factor –Wind Capital Cost –Net Energy Value of Wind –Required Subsidy

Average Capacity Factors

Source of Wind Data htm CONSULT THE REPORTS AT THE SITE:

Power Curve of Wind Technology

Wind Speed by Hour

Wind Speed by Hour of Day and Month of Year

Wind Speed Variation by Month

Capacity Value of Wind Assume to Production Cost Runs with the same amount of non-wind capacity, except that one case has some wind capacity –1. Without Wind –2. With Wind The LOLE in the second case will be lower than the LOLE in the first case because in some high load hours, the wind farm will be running and lower the net load requirements for the other units. The value of wind could be –LOLE reduction x Cost of outage –Eg x 10,000 Won/kWh

Weibull Distribution In excel, =weibull(Wind Speed,C Factor (e.g. 2),Avg Speed/.89) X = wind speed K = Average Wind Speed/Gamma Factor = Average Wind Speed/.89 C = 2

RetScreen Reconciliation Total energy delivered after losses and adjustments is 100,565 MWH Capacity Factor is –Average Generation:100,565/8760 = 11,480 –Divided by 40,000 –Equals 28.7%

Start with Monthly Wind Speeds Before Working with the Power Curve and the Weibull distribution, adjustments to the wind speeds for height and wind density should be made:

Compute Month by Month Wind Speeds This table illustrates how the unadjusted wind speeds are adjusted

Use the Weibull Distribution to Compute the Average Hourly Output by Month This example shows the calculation for the first month. The index function can be used for the same calculation in other months

Compute Total Production for Each Month Compute the total production for one turbine for one year before adjustments for losses etc. using data table function in excel

Adjust for Number of Turbines and Loss Factors

Alternative Use of Weibull Required Inputs

Preliminary Calculations This shows some calculations that are necessary

Power Curve and Weibull

Wiebull Distribution

Raw Wind Speed Analysis

Raw Wind Speed Data

Actual Distribution vs Weibull

Weibull versus Actual

Alternative Power Curves

Variation in Average Wind Speeds

Variation in Capacity Factor from Wind Speed Variations

Solar Resource Analysis

Solar Radiation in Energy per m2

Capacity Factor

Solar Production by Month

Computation of Solar Energy per m2

Clearness Index