Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.

Slides:



Advertisements
Similar presentations
Brenna Flaugher Sept. 26, The Dark Energy Survey Camera: DECam 1.1 Management 1.2 Focal Plane Detectors 1.3 Front End Electronics 1.4 Optics 1.5.
Advertisements

Pre-Director’s Review Findings & Recommendations RecommendationManagerStatus 9Update BOE for AlN boardsShawDone 10Establish the budget profile ASAPFlaugherDone.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Major Management & Systems Engineering Ideas for Reducing Costs Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
Construction of the Dark Energy Camera Brenna Flaugher, DECam Project Manager CTIO Nov John Peoples (1 st DES Director ) Symmetry Magazine.
1 B. Flaugher P5 April 2006 The Dark Energy Survey From Scientific Goals to Science Quality Data Brenna Flaugher Fermilab April 2006 P5 Meeting.
Brenna Flaugher May 17, Technical Draft Recommendations 3.1Optics, Optical Corrector, Mechanical Systems 1.Augment the systems engineering effort.
NEDM Construction Project Cost & Schedule Philosophy Vince Cianciolo, ORNL Physics Division Internal Cost & Schedule Review 02/11/2005.
DES PMG Meeting, January 26, 2007 T. Shaw1 DES PMG Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky, J. Olsen, W. Stuermer (FNAL)
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
7/26/2006 Wyatt Merritt 1 DECam Preparations for Critical Decision 2/3a Preparations for CD2 Preparations for CD3a DECam MOUs.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Telescope Integration and Tests Tuesday Afternoon.
Brenna Flaugher July 25-27,2006 Directors Review 1 The Dark Energy Survey Camera: DECam 1.1 Management 1.2 Focal Plane Detectors 1.3 Front End Electronics.
Brenna Flaugher DES presentation to the Fermilab PAC Nov. 12, 2004 Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 1 DES Technical Progress, Cost and.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
3.1 Optomechanical systems (1) Scientific and engineering resources are available to carry out the optomechanical work on DECam. The highly distributed.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Brenna Flaugher July 20, DECam Project Summary Outline –WBS 1.1 Management –WBS 1.2 Focal Plan Detectors –WBS 1.3 Front End Electronics –WBS 1.4.
Dark Energy Survey Status John Peoples Presentation to the Fermilab PAC 6 March 2009.
PIP PMG Project Controls Elmie Evans-Peoples PIP PMG Oct 25, 2012.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
Brenna Flaugher Aug. 17, DECam Project Summary Outline –WBS 1.1 Management and Integration –WBS 1.2 Focal Plane Detectors –WBS 1.3 Front End Electronics.
1 The DES Calibrations Effort Douglas L. Tucker (DES Calibrations Scientist) DES NSF/DOE Review, 8-9 June 2009 The DES Calibrations Effort has connections.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
DoE Review June 6, 2000 Cost Estimate  New Cost Estimate u Manpower Costs (Op. SWF) u Equipment Costs (Eq. M&S) u Contingency  Conclusions Mike Tuts.
1 DECam in Chile Intro to Dark Energy Survey & DECam Project Status of arrivals in Chile Instrument checkout in Chile Schedule for first light.
Brenna Flaugher October 30, 2007 Preliminary Directors Review 1 Outline This talk will describe progress on DECam since the joint NSF/DOE CD-1 review in.
DUSEL Beamline Working Group Meeting March 09, :00 AM – Snake Pit (WH2NE) By Dean Hoffer - OPMO.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
Brenna Flaugher July 25-27,2006 Directors Review 1 The Dark Energy Survey Camera: DECam 1.1 Management 1.2 Focal Plane Detectors 1.3 Front End Electronics.
AGS RSVP Weekly Meeting P. Pile 24 Mar 2005 AGS RSVP Weekly Meeting 24 Mar 2005 Useful Links: RSVP Project : C-AD.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
Brenna Flaugher July 6, DECam Project Summary Outline –WBS 1.1 Management –WBS 1.2 Focal Plan Detectors –WBS 1.3 Front End Electronics –WBS 1.4.
DES Review CCD Focal Plane and Camera Roger Smith George Ricker.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
EDM Fast Start Presentation WBS 11 – Assembly and Commissioning Vince Cianciolo, Paul Huffman May 23, 2006.
Oct. 19, 2006V. Scarpine1 DES Posters to AAS 2007, Seattle 1.Brenna Flaugher – “The Dark Energy Survey instrument” 2.Tom Diehl – “Characterization and.
Oct 17, 2001SALT PFIS Preliminary Design Review Management, Schedule, & Budget 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Management,
Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Brenna Flaugher FNAL All Experimenters Meeting June Dark Energy Survey Motivation Dark Energy is the dominant constituent of the Universe Dark Matter.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
Cosmic Program and Users in the Fermilab Dark Energy program Brenna Flaugher Fermilab Institutional Review Feb
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March 2013
Jim Fast Pacific Northwest National Laboratory
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Project Management W. J. Foyt
WBS 1.03 Readout Systems Scope, Cost and Schedule
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Management Breakout: MREFC Budget Summary Victor L
LSST Camera Detector Status
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
Preliminary Project Execution Plan
Presentation transcript:

Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting in delivery to CTIO in April 2010 (no explicit contingency) Optics critical path. Pres. Bud. Req. Feb. 2007: 3.6 in MIE funds in FY08 From Kathy: –FY08: 3.6 in MIE in OPC = 4.8 –FY09: 6.5 in MIE + 1 in OPC = 7.5 –Further request: what happens if FY09 is a total of 6.5 not 7.5 From Mont/John: OPC in FY08 is not fixed. Additional R&D funds could be possibly negotiated with the lab or from collaborators FY2007FY2008FY2009FY2010FY2011Total DOE MIE DOE R&D DOE TPC

Brenna Flaugher, PMG, April 6, 2007 Strawman installation and commissioning schedule 1.3 weeks for installation on telescope 2.3 weeks on sky weeks for analysis & adjustment –DECam is available for daytime test in its stowed (inverted) position. 4.2 weeks on sky –Complete remaining tasks of previous two slides –Verify modifications of step 3 –Staff training –DES acceptance test sign-off 5.2 weeks science verification / contingency –NOAO community scientists carry out demonstration science, no proprietary period, rapid dissemination of results. Oohs & aahs. 6.Community &/or DES observations begin a minimum of about 4 months after Installation begins

Brenna Flaugher, PMG, April 6, 2007 Profiles and Dates Deliver to CTIO (No contingency) July 2010 Dec 2010 We expect to switch to R&D funds (from Generic) in Fy07 4 th quarter and expect to spend ~ $0.5k Labor, $0.5M M&S This adds $1M to the total project costs listed above, depends on CD-1 date. After delivery to CTIO: 3.5 months of reassembly + testing months of contingency on L1 milestone for testing complete + 5 months contingency for CD-4 CD4 date is ~14 months after delivery to CTIO (Sept ~ March 2012)

Brenna Flaugher, PMG, April 6, 2007 Breakout Session DECam 1 14:30 – 17:00 Parallel Breakout Streams; Breakout Session # 1 (2 hours) Stream #1, Session #1: DECam, CFIP, and Integration: Technical details of the subprojects, current status of R&D, Level 2 cost and schedule Presentations: –20+10 min – Brenna: more detailed overview of DECam project, how it all fits together and is coordinated, Critical paths (focus on optics and CCDs), R&D program so far and progress, Remaining questions, Risks, cost and schedule, what ever doesn’t fit in the plenary talk –20+10 min – Rebecca – Optical Design ~ same talk as at the optics review, let them know the design is well optimized, meets the specs and can be built. –20+10 min – Juan: CCD characterization, why we think the CCDs will meet our specifications, what we know about the yield

Brenna Flaugher, PMG, April 6, 2007 Breakout Session DECam 2a 9:30 – 12:00– Parallel Breakout Sessions Continued, Session #2 CCDs, Focal Plane, Front End Electronics, SISPI: Level 2 cost and schedule for these items (WBS 1.3, ) 20+10: Tom: CCD tracking, packaging, Focal Plane detector WBS cost and schedule 20+10: Terri: Readout electronics Overview, Status of the 12 channel, clock board, and SLINK, R&D questions still to be answered, cost basis of estimate and schedule 20+10: Jon: SISPI, online monitoring, cost and schedule Additional backup talks prepared: –10+10: Natalie: CCD wafer processing and probing –10+10 Greg Derylo: CCD packaging detailed plans –10+10: Laia, or someone from Spain to talk about MCB, SLINK, Clock board, Cube, plans –10+10 Jim Grudzinsiki: Controls plans –10+10: Inga or Tao: mutilcrate, supervisor layer, Guider issues –10+10: Gladders on Alignment and Focus

Brenna Flaugher, PMG, April 6, 2007 Breakout Session DECam 2b DECam, CFIP, and Integration: Stream #1, Session #2b: Camera, Corrector, mechanical systems, and external cryogenic systems for DECam, Level 2 cost and schedule for these item (WBS 1.4 and 1.5) 20+10: Herman: C5 cell, Focal plane, Camera and cooling system design – Camera cost and schedule basis of estimate 20+10: Peter (Video): C1-4 cell design, Procurement strategy for the blanks and polishing, coating : Andy: Barrel Design, overview of Cage, hexapod, mechanical systems and interfaces Design, Cost and Schedule Additional backup talks: –10+10: Bruce: Filter changer, Filter procurement plans, Shutter (Filter specs defined in Science session) –10+10: David Brooks: Assembly and testing of the lens in the cells, cells in the barrel, shipping to CTIO –10+10: Dave McGinnis: Hexapod specs and plans

Brenna Flaugher, PMG, April 6, rd Breakout DECam + CFIP 13:00 – 15:30– Parallel Breakout Sessions Continued Focus on Integration min – Tim: more detailed information about how DECam fits in at the Blanco, how CTIO stays in contact with the DECam design, the Community needs document, Planned observing modes, the flip, 8 filters, SISPI from the CTIO point of view, Blanco performance upgrades if it didn’t fit in the plenary talk 15+10: Andy: Overall Mechanical integration including plans for Telescope simulator and testing prior to shipment to CTIO 15+10: Terri: Electrical Integration, testing plans, before shipping to CTIO and at CTIO 15+10: Jon: Plans for Integration and testing of SISPI with CTIO and DM, in particular TCS

Brenna Flaugher, PMG, April 6, 2007 Schedule file Generic R&D (no EVMS) – but we are using the schedule file to track costs and plan. In March we did a detailed comparison of the labor from Oct-Feb. –Found some effort reporting problems –Used experience of Oct- Feb to adjust future tasks FTE’s Short by ~ 2.5 FETs, mostly in ME and MT

Brenna Flaugher, PMG, April 6, 2007 Generic R&D 2007 Comparison of actual and scheduled labor for Oct-Feb. We could show this sort of comparison at the review after a bit more tuning.