Activities of 2008) Jinsook Kim, Yongwook Baek 1.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
HCAL-Fermilab7 Feb 2003Hazen / Machado HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
RPC system cable routing Yang Changgen, Guan Mengyun IHEP, Beijing.
Walls crates cables gas chambers electronics CERN adb.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
Status of HO Installation and Commissioning Shashikant Dugad (DHEP, TIFR) India-CMS Meeting BARC, July 2007.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Costas Foudas, The Tracker Interface to TCS, The CMS Silicon Tracker FED Crates What goes in the FED Crates ? What do we do about the VME controller.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
17/1/07 F. Formenti PH-ED1 Competence domain (PH-ED) What field of expertise ED can provide?  System electronics design  1.Front-end detector electronics.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
TOF code status report : raw data data visualization geometry A. De Caro for the TOF group.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
V. Bobillier1 Cable installation status.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
CDMS II Shielding To Installation To Construction From Design.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
S A Griffiths CM42 June 2015 Electrical & Control.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
LKr status R. Fantechi.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
RICH Status from last RICH meeting
Integration issues at IHEP
Fiber Installation for RUN 3&4
UK CMS Oversight Committee Mtg
YE+3 Changes YE+3 X4A51 S4F04 Additions for TS ME+4/2/x chambers
Rack installation and local tests for the MEBT Chopper Rack
Prepared for CSC by Fred Borcherding FNAL
Needed for Team A on -End
Presentation transcript:

Activities of 2008) Jinsook Kim, Yongwook Baek 1

Activities of TOF 2008) SM16: Completed – LV cables installation – HV cables tested – VME 4 crates test & mounted – FEA cards & record ID – Amphenol cables done (both) – FEAC cards & cables installation – Gluing done for both sides – Pulser test : done 2

Activities of TOF 2008) 3 SM17& SM18 : 100 % done – Cooling pipe – Aluminum frame done – gas leak test – Put mylar to protect interface cards – FEA cards & recode ID – LV cables installation – HV cables tested – VME 4 crates test & mounted – FEA cards & record ID – Amphenol cables done – FEAC cards & cables installation – Gluing done for both sides – Pulser test : done – Move to P2

Activities of 2008) 4  Check using test program : Control cable connections DRM connection  Fix & test : Slow control cables TTC signal cables  Installation : Grounding cables LV power cables Optic fiber links

Summary & Milestone Summary (1 post doc. & 1 students)  The assembly of TOFs has been completed in time.  All SMs have been Milestone – Commissioning – Cosmic run (magnet on) Period: 2 nd & 3 rd week of June 5