1 R&D status report of LST technology (2) Changguo Lu Princeton University BaBar IFR Workshop SLAC, December 8, 2002.

Slides:



Advertisements
Similar presentations
Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Advertisements

Development of high rate RPCs Lei Xia Argonne National Laboratory.
Aging, High Rate and Shielding L. Lopes Lip-Coimbra.
1 Sep. 19, 2006Changguo Lu, Princeton University Induced signal in RPC, Configuration of the double gap RPC and Grouping of the strips Changguo Lu Princeton.
OSU meeting, 04/24/2003 Richard Kass1 Limited Streamer Tube Project Overview Richard Kass Ohio State University Introduction (why, who, what….) The big.
C.Gustavino, XPC and VETO, LNGS OPERA meeting, may VETO AND XPC: Preliminary ideas Outline: Mechanical structure Gas mixture study Aging tests Glass.
E-field calculations for the TPC/HBD N. Smirnov Upgrade Working Group Meeting 05/13/03, BNL.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
PNPI in LHCb A.Vorobyov HEPD Scientific Board meeting, December 26,2003 Status report for 2003.
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
Scintillator based muon upgrade / BELLE Super B Factory Workshop In Hawaii Jan 2004, Honolulu, Hawaii 1.Scintillator strip option 2.Geiger photodiodes.
1 Daya Bay Collaboration Meeting, IHEP, Beijing, 8/1-3/2007 RPC aging concern Changguo Lu Princeton University Daya Bay Collaboration Meeting IHEP, Beijing,
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
Tests of a 10cm by 10cm triple GEM detector
Large Cell Scope Pictures, Part II HV Gnd 1nF Large Cell Tube Anode signal Phi Cathode signal scope S1 S2 S1 S2 This is a follow-up on Richard’s measurement.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
November 5, 2004V.Ammosov ITEP-Moscow, Russian CBM meeting 1 IHEP possible participation in CBM TOF system Vladimir Ammosov Institute for High Energy Physics.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
15 th CBM collaboration meeting, GSI, Darmstadt, Germany, April 12-16, 2010Wang Yi, Tsinghua University R&D status of low resistive glass and high rate.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Muon Detector Jiawen ZHANG Introduction The Detector Choices Simulation The structure and detector design The Expected performance Schedule.
IFR barrel upgrade: status of LST option Roberto Calabrese Ferrara University 10/18/2002.
RPC Development in Beijing and Potential for NO A Tianchi Zhao University of Washington May 16, 2005.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
1 Test on RPC Veto Detector Model —— Anticoincidence Detector for Daya Bay Neutrino Exp. Speaker: Jiawen Zhang 5 June 2006.
Prototypes of high rate MRPC for CBM TOF Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China RPC-2010-Darmstadt, Germany.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
M. Bianco On behalf of the ATLAS Collaboration
19 September 2006SuperNEMO tracker, Manchester status The SuperNEMO Tracker Manchester status Steve Snow Ray Thompson Stefan Soldner-Rembold Irina Nasteva.
Precision Drift Chambers for the ATLAS Muon Spectrometer
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
1 August 18, 2004ICHEP’04, Beijing Changguo Lu, Princeton University Limited Streamer Tubes for the BaBar Instrumented Flux Return Upgrade Changguo Lu,
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
Test on installed RPCs with the gas mixture. Preliminary results. Alessandro Paoloni on behalf of the OPERA RPC Group (Bologna, LNF, LNGS, Napoli, Padova,
Quality-evaluation of Cesium Iodide photocathodes for the ALICE/High Momentum Particle Identification detector by means of a VUV-Scanner system Herbert.
Study of gas mixture containing SF6 for the OPERA RPCs A.Paoloni, A. Mengucci (LNF)
Properties of the bakelite used for standard RPC chambers as a function of the operating temperature F. Bruni – G. Hull – S.M. Mari 4 digital thermometers.
Performance and Aging Studies of BaBar RPC’s Henry R. Band University of Wisconsin for the BaBar IFR-RPC group RPC 2005 VIII Workshop.
Final results from an extensive aging test on bakelite Resistive Plate Chambers Stefano de Capua University of Rome II “Tor Vergata” and INFN.
TRIUMF laboratory studies Christopher Hearty University of British Columbia/IPP 27-Sep-2010.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
The photomultiplier tubes selection for KM2A electromagnetic particle detectors (EDs) hou chao IHEP The 2nd workshop of air shower detection at high altitudes.
XI Workshop on Resistive Plate Chambers and Related Detectors, INFN, 5-10 February, Aging test of high rate MRPC Wang Yi Department of Engineering.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Roberto Calabrese Ferrara University and INFN
MDT second coordinate readout: status and perspectives
An extensive aging study of bakelite RPC
Dubna/JINR Status & Plans
Sensitivity of Hybrid Resistive Plate Chambers to Low-Energy Neutrons
Update on Noise Analysis of the DHCal Test Beam at Fermilab
CMS muon detectors and muon system performance
News on second coordinate readout
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Han Jifeng BESIII MUON GROUP IHEP, CAS
RPC and LST at High Luminosity
BESIII RPC Detector Jiawen Zhang
Pre-installation Tests of the LHCb Muon Chambers
Study on 9x9 standard single cell prototypes in Ferrara
Single rate plateau curve with different gas mixture
University of Rome II “Tor Vergata”
Limited Streamer Tube Project Summary
Presentation transcript:

1 R&D status report of LST technology (2) Changguo Lu Princeton University BaBar IFR Workshop SLAC, December 8, 2002

2 Outlines LST cell size study; Aging test results; LST rate capability; QA at US assembling sites.

3 LST cell size study Comparison of three different cell geometries: Standard cell size — 9  9 mm 2, ST type; Small size, anode wire is located at the center of the cell — 9  8 mm 2, SC type; Small size, anode wire is equally distant from three conductive walls — 9  8 mm 2, SE type. Criterion for the comparison: Relative variation of the E-field on the anode wire surface along the circumferential direction.

4 E-field variation on anode wire surface Coverless LST chamber has one distinguish feature: its E-field on the anode wire surface varies along the circumferential direction. 9 x 9 mm 2 cell with conductive cover V contour plotE-field lines

5 Coverless cell with normal cell size V contour plotE-field lines

6 E-field distribution on the anode wire surface 9 x 9 mm 2 cell size, 100  m anode wire, V anode = 4700V For all-covered cell E-field on the anode wire surface is constant, but for coverless cell E-field varies with . The criterion for comparison: (E max – E min )/E max

7 … E-field distribution ST type (standard cell) SC type (anode at center) SE type (anode equally distant to conductive walls) Emax (V/cm)199,137199,704196,126 Emin (V/cm)197,938198,002194,352 (Emax – Emin) / Emax0.6%0.85%0.9%  V(V) * *  V = 4700* (Emax – Emin)/Emax The differences among three geometries are small, 9  8 mm 2 cell size won’t be a problem.

8 Plateau curve of different gas mixture Standard binary gas mixture. Safe gas mixture (ZEUS) Both of them can get good single’s rate plateau curve.

9 LST for ZEUS, SLD, Phenix and our proposed one ZEUSSLDPHENIX Proposed BaBar barrel IFR upgrade Building material NorylPVC Noryl coating resistivity Low resistivityHigh resistivityHigh resistivity (?) High resistivity readoutanode readout only strip and pad readout anode readout only strip readout only Gas mixtureAr/C 4 H 10 /CO 2 (3/8/89) Ar/C 4 H 10 /CO 2 (2.5/9.5/88) C 4 H 10 /CO 2 (9/91) Ar/C 4 H 10 /CO 2 (3/8/89) Working modeLimited streamer AvalancheLimited streamer No one system is a duplication of the other, we have to conduct our own aging test.

10 Update on aging test So far the accumulated charge dose has reached 170 mC/cm, no aging sign has shown up yet. The test chamber used in this test was made of PVC, anode is 100  m Au-coated Cu-Be wire, a ceremic end board used to distribute high voltage to eight wires, PVC profile was painted with standard graphite paint. The chamber was heat sealed and the wires were heat staked onto plastic supports. No glue was used. We are proposing to use Noryl instead of PVC as the profile and envelop building material. According to ZEUS aging test results Noryl certainly will be much better than PVC. SMC experience shows that their PVC LST aging was well beyond 1C/cm, so we believe that the Noryl LST should be even better than 1C/cm.

11 … Update on aging test

12 Effect of the gas pressure on the streamer signal size LST signal size is sensitive to temperature and gas pressure. Aging test chamber with Sr-90 source. During this period the room temperature was quite stable, ~ 24  0.5  C.

13 Is LST suitable for BaBar endcap IFR? Two key performances need to be checked (based on Jerry’s estimation): Rate capability - 100Hz/cm; Aging performance – 2C/cm. Q rpc = 1000pC   Q = 20C/cm 2 Q lst = 100pC   Q = 2C/cm 2

14 Rate capability of LST The spectra of 61Hz/cm and 111Hz/cm are generated by Sr-90 source with different absorbers. Very similar to cosmic ray background  LST can handle the rate of BaBar IFR endcap layer 18.

15 … rate capability Further increase the source intensity we can see the charge spectrum shifting towards left: Aging performance up to 2C/cm 2 for Noryl LST is still unknown. But so far no any negative evidence. We are going to perform this test as long as we get final version of LST from PolHiTech.

16 Proposed QA procedure at Princeton assembling site Never overestimate the importance of QA for a successful large LST system. PolHiTech will continue to use the QA procedure for Phenix LST mass production. They will continue to monitor the anode wire current for one month. The final selection of good chamber will be based on the current history of the chamber. After receiving the LST chambers at US assembling sites (Princeton and Ohio State), before making the final assembly unit, second round of QA will take place. The proposed QA procedure at assembling site is based on successful OPAL LST system. That procedure had been used to test more than LST tubes ( cell chambers of length 3.0 m to 7.3 m) at CERN. Similar QA program was used at University of Maryland during that time.

17 QA procedure 1.Stability of the anode current — at the maximum voltage continuously monitor and record the current drawn by each chamber for one month. Criterion for acceptance: high current activity above 100nA < 5% of the time in the first half of the history, no activity in the second half of the time; 2.Pulse-form test — decent pulse shape should be seen on the scope: 30 ~ 50 mV, 40 ns. Criterion fro rejection: anomalously shaped pulses or no pulse at all, indication of construction faults; 3.Cathode scanning with a radioactive source — using radioactive source to produce exceptionally high rate of charge exchange on the cathode to detect defect on the graphite coated cathode. Garfield calculation shows at 4700V the total cathode charge ~ 55nC/m, if one anode wire current is 55nA, the source moving speed is 10cm/s, then within 10 seconds we can scan 1m long chamber, and make 10 times cathode charge exchange.

18 Cathode scan Due to graphite coating non-uniformity, some isolated islands may exist on the cathode surface, under the normal background rate those bad spots may not cause trouble, but under high rate condition it would trigger self-sustaining discharge, and reveal this type of defect. Even w/o source the high current is still remaining.     F. Fabbri et al. CERN/EP , 29 July, 1987)

19 Conclusion LST E-field study by Garfield for three different cell’s geometries shows that the small cell size (9x8mm 2 ) has very little affect on the E-field distribution, will not deteriorate the performance. A real test will be conducted on the new prototypes; Aging test on an old PVC LST chamber shows that up to 170mC/cm charge dose, no aging symptom can be seen, which indicates even with PVC LST should have no problem for barrel IFR; Rate test shows that up to 110Hz/cm the charge spectrum shows no difference from cosmic ray background, which indicates that LST should be able to handle the rate for BaBar IFR endcap layer 4x10 34 /cm 2 sec PEP II luminosity.