Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis.

Slides:



Advertisements
Similar presentations
Project Manager P. Paolucci deputy/deputy Run Coordinator G. Pugliese deputy Run Coordinator G. Pugliese deputy DPG D. Piccolo K. Bunkowski DPG D. Piccolo.
Advertisements

RPC project Upgrade phase I Pierluigi Paolucci. RPC system in the forward region The forward region of the RPC project consists of: 4 disks equipped with.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
RPC tasks and manpower P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.
RPC project chart Pigi Paolucci. RPC structure Project Manager1 0 level Deputies - Resource Manager2 0 level Istitution – Editorial – Conference2 0 level.
Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
RPC M&OB status Pigi Paolucci. Summary 2010 Cash Contributions foreseen CHF 2010 Expenditures (2009 carry over) CHF Present Income Balance.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
RPC CONSOLIDATION WORKSHOP Pigi Paolucci INFN of Napoli.
Data Quality Monitoring for CMS RPC A. Cimmino, D. Lomidze P. Noli, M. Maggi, P. Paolucci.
MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3.
MuonDPG/RPC M. Maggi INFN Bari. DQM tool for the DCS data Control Analysis Tool (CAT) by Cimmino, Lomidze, Paolucci, Polese To 1.Make custom DCS data.
A. Cimmino - P. Paolucci - G. Polese / DCS meeting DQM tool for the DCS data What the RPC community needs: 1.Make online/offline DCS data.
Wesley SmithAug. 17, 2010 Trigger Budget Review: Travel & COLA - 1 US CMS FY 2011 Budget Review Trigger Travel & COLA Wesley Smith Aug. 17, 2010 Outline.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
Run Coordination Report 4th RPC General Meeting (CMS week) Luigi BENUSSI, Hassan SHAHZAD, Nicolas ZAGANIDIS.
Databases E. Leonardi, P. Valente. Conditions DB Conditions=Dynamic parameters non-event time-varying Conditions database (CondDB) General definition:
RPC Endcap Maintenance and RE4 Upscope Anton Dimitrov on behalf of RPC TC CMS Week Dec 2012 CERN, Geneva.
RPC project status report RPC IB meeting 29 march 2011 Pigi Paolucci.
CMS Databases P. Paolucci. CMS DB structure HLT-CMSSW applicationReconstruction-CMSSW application FronTIER read/write objects.
1 st RPC General Meeting 29 March 2011 Pigi Paolucci RPC project status.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Pierluigi Paolucci - INFN of Napoli 1 Official Muon talks at 2006 Conferences 1.10th Topical Seminar on Innovative Particle and Radiation Detectors – 1-5.
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
Databases in CMS Conditions DB workshop 8 th /9 th December 2003 Frank Glege.
1 RPC project Upgrade Anna Colaleo (INFN-Bari) on behalf of Bari (Resp.D.Creanza), LNF (Resp.S. Bianco), Naples (Resp.L. Lista), Pavia (Resp.P. Vitulo)
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
India CERN Meeting, BARC, 28/02/11
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
2009 RPC CAF experience We did a very good exercise at the end of 2009 – 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue.
Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.
Data Quality Monitoring for the CMS Resistive Plate Chamber Detector Anna Cimmino etc etc etc Università degli Studi di Napoli “ Federico II ” & INFN of.
Muon Conference Pigi Paolucci. Front-End Control and Monitoring System for the Resistive Plate Chambers at the CMS Experiment Contributed to be given.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
4 st RPC General Meeting 28 June 2011 Pigi Paolucci RPC project status.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
CMS Muon detector from LHC to HL-LHC Pigi Paolucci INFN Napoli 1P. Paolucci (CMS group of Napoli) - Jan 2015.
Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project.
The GEM Proto-Collaboration (“GEMs for CMS”) Marcus Hohlmann, Florida Tech Interim Chair of Proto-Collaboration Board 2 nd CMS Workshop on High-eta Muon.
D. Piccolomeeting RPC Italia - Ischia september CRAFT08 paper status D. Piccolo Laboratori Nazionali di Frascati INFN.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
Silvia Costantini RPC General Meeting CMS week 15 June 2010.
P. Paolucci G. Pugliese M.Tytgat
RPC Data Certification
TC activities.
Stefano Colafranceschi on behalf of:
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
Data Preparation Group Summary of the Activities
EU Institution Board 1 representative of each participating institute
Barrel RPC Conditions Database
CMS RPC Endcap RE1 Status Report
DQM for the RPC subdetector
Presentation transcript:

Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis DPG D. Piccolo K. Bunkowski C. Carillo DPG D. Piccolo K. Bunkowski C. Carillo Upgrade G. Iaselli A.Sharma S. Buontempo Upgrade G. Iaselli A.Sharma S. Buontempo Institution Board L. Litov Resource manager P. Paolucci ad interim Steering committee W. Van Doninck, M. Maggi H. Hoorani, A. Colaleo, A. Sharma (PM+DPM+RC+TC+DPG) Conference Committee S. Park, B Pavlov Conference Committee S. Park, B Pavlov Editorial board S. Qian, M. Abbrescia S. Bianco Editorial board S. Qian, M. Abbrescia S. Bianco 8/02/20111RPC organization chart Tech. Coordination S. Buontempo A. Dimitrov Tech. Coordination S. Buontempo A. Dimitrov

Physic Validation Tool S. Costantini Physic Validation Tool S. Costantini CAF A. Cimmino CAF A. Cimmino P5 L. Benussi P5 L. Benussi Maintenance & reparation A.Dimitrov H. Shahzad Maintenance & reparation A.Dimitrov H. Shahzad Offline D. Piccolo Offline D. Piccolo Online K. Bunkowski Online K. Bunkowski Data analysis C. Carillo Data analysis C. Carillo 8/02/20112RPC organization chart Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis DPG D. Piccolo K. Bunkowski C. Carillo DPG D. Piccolo K. Bunkowski C. Carillo Upgrade G. Iaselli A. Sharma Upgrade G. Iaselli A. Sharma Resource manager P. Paolucci ad interim Tech. Coordination S. Buontempo A. Dimitrov Tech. Coordination S. Buontempo A. Dimitrov Steering committee W. Van Doninck, M. Maggi H. Hoorani, A. Colaleo, A. Sharma (PM+DPM+RC+TC+DPG)

DPG D. Piccolo K. Bunkowsk C. Carillo DPG D. Piccolo K. Bunkowsk C. Carillo Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis SoftwareValidation/ Data Certification J. Gho SoftwareValidation/ Data Certification J. Gho Detector perfomance C. Calabria Detector perfomance C. Calabria Online K. Bunkowski Online K. Bunkowski Offline D. Piccolo Offline D. Piccolo Detector & trigger analysis C. Carillo Detector & trigger analysis C. Carillo Phys Valid Tool S. Costantini Phys Valid Tool S. Costantini Detector impact on trigger Resp. Detector impact on trigger Resp. Calibration Streams M. Maggi Calibration Streams M. Maggi WBM U. Berzano WBM U. Berzano Run Quality Tae Jeong Run Quality Tae Jeong Noise tools S. Costantini Noise tools S. Costantini DQM A. Cimmino DQM A. Cimmino Skims S. Tupputi Skims S. Tupputi Simulation B. Pavlov Simulation B. Pavlov Local Reco C. Carrillo Local Reco C. Carrillo DataBase M. Maggi DataBase M. Maggi Trigger DB M Szlepper Trigger DB M Szlepper Configuration K. Bunkowski DCS Detector DB Manpower needed Not covered Covered 8/02/20113RPC organization chart Non event data P. Petkov Non event data P. Petkov DPG-POG Min Suk Kim DPG-POG Min Suk Kim Upgrade Resp. Upgrade Resp.

8/02/20114RPC organization chart Technical Coordination S. Buontempo A. Dimitrov Technical Coordination S. Buontempo A. Dimitrov Mainten. & repair. (RE,RE) Dimitrov & Shahzad Mainten. & repair. (RE,RE) Dimitrov & Shahzad Upgrade G. Iaselli deputy Upgrade G. Iaselli deputy Bakelite CERN test stand CERN CERN test stand CERN Gap production mechanics Cooling J. Crotty Cooling J. Crotty Ghent site M. Tytgat Ghent site M. Tytgat India site L. Plant India site L. Plant CERN site CERN CERN site CERN Chamber validation Front-end electronic Link board electronic Link board electronic Equipment DB D. Uzunova Equipment DB D. Uzunova Cooling J. Crotty Cooling J. Crotty Gas Benussi Gas Benussi Trigger Warsaw Trigger Warsaw Documentation Dimitrov Documentation Dimitrov Equipment DB D. Uzunova Equipment DB D. Uzunova Electronics resp. Electronics resp. DCS Resp. DCS Resp. Preliminar version Test beam Nicolas Test beam Nicolas R&D N. Zaganidis R&D N. Zaganidis