VISAS - ODG P74: a first view ESO Faculty meeting, 6 April 2004
Call and Proposal submission No more PostScript, PDF only PDF: smaller & searchable
Totals P proposals received for La Silla and Paranal 14 Large Programs (Paranal 13, La Silla 1) 2 submitted via !
Proposal arrivals vs. Time (P74) Days Number
Proposal arrivals vs. Time (P74) Days Number
Country distribution (P74) 54% Fellows + students
Paranal vs. La Silla Number
Scientific areas (P74) Number LS P P PP
Optimizing the community: the VLT sky
Total Available vs. Total Requested “Available” in this presentation means always 182 nights!
Predicting trouble: UT1
Real life P74: UT1 For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
Predicting trouble: UT2
Real life P74: UT2 For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
Predicting trouble: UT3
Real life P74: UT3 For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
Real life P74: UT3 DARK TIME For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers) ~18 times available time!!
Predicting trouble: UT4
Real life P74: UT4 For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
Real life 3.6: P74 For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
Real life NTT: P74 For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
Real life 2.2: P74 For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
Real life 2.2: P74 DARK TIME For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers) MPIA time
Telescope time allocation
The community Number of proposals 1977 Now 3.6 m 1.5 Dan 0.9 Dut 1.4 Cat 2.2 m SEST NTT UT1 UT2 UT3 UT4
TaToo, the scheduler