12/19/2013 1 PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.

Slides:



Advertisements
Similar presentations
10/03/ PHENIX WEEKLY PLANNING Oct. 3, 2013 Don Lynch.
Advertisements

4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
2/6/ PHENIX WEEKLY PLANNING Feb. 6, 2014 Don Lynch.
12/12/ PHENIX WEEKLY PLANNING Dec. 12, 2013 Don Lynch.
8/22/ PHENIX WEEKLY PLANNING Aug. 22, 2013 Don Lynch.
9/26/ PHENIX WEEKLY PLANNING Sep. 26, 2013 Don Lynch.
5/15/ PHENIX WEEKLY PLANNING May 15, 2014 Don Lynch.
1/30/ PHENIX WEEKLY PLANNING Jan. 30, 2014 Don Lynch.
9/6/20121 PHENIX WEEKLY PLANNING 9/6/2012 Don Lynch.
10/31/ PHENIX WEEKLY PLANNING Oct. 31, 2013 Don Lynch Happy Halloween!
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
10/10/ PHENIX WEEKLY PLANNING Oct. 10, 2013 Don Lynch.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
6/27/ PHENIX WEEKLY PLANNING 6/27/2013 Don Lynch.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
11/7/ PHENIX WEEKLY PLANNING Nov. 7, 2013 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/05/06 Don Lynch. 10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
10/11/20121 PHENIX WEEKLY PLANNING 10/11/12 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
3/14/20131 PHENIX WEEKLY PLANNING 3/14/2013 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
11/29/20121 PHENIX WEEKLY PLANNING 11/29/12 Don Lynch.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
1 12/09/2010 PHENIX WEEKLY PLANNING 12/09/2010 Don Lynch.
4/10/ PHENIX WEEKLY PLANNING April 10, 2014 Don Lynch.
11/15/20121 PHENIX WEEKLY PLANNING 11/15/12 Don Lynch.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
8/29/ PHENIX WEEKLY PLANNING Aug. 29, 2013 Don Lynch.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
4/17/ PHENIX WEEKLY PLANNING April 17, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
6/28/20121 PHENIX WEEKLY PLANNING 6/28/2012 Don Lynch.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
7/12/20121 PHENIX WEEKLY PLANNING 7/12/2012 Don Lynch.
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
9/5/ PHENIX WEEKLY PLANNING Sep. 5, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
Presentation transcript:

12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch

12/19/ This Week Finish FVTX/VTX services and cooling/ bgin commissioning Complete MPC-Ex Installation Remove MPC-Ex installation tool - Done Finish MPC-Ex rack assembly & Install on MMS MuTrigger rack Install LV cables from MPC-Ex rack - Done Install bias cables from MPC-Ex rack - Done Install control cables from MPC-Ex rack - Done Assemble MPC-Ex FEM’s - waiting for parts Install FEM’s - waiting for parts Install signal cable to FEM’s – waiting for parts Install fiber from MPC-Ex rack to MPC-Ex FEM’s - waiting for parts Remove, disassemble and stow station 1 South scaffolding - Done Begin IR & EC prep for move to IR Remove manlifts from IR–Done Remove deck plates from IR–Done Move MuID Collars into IR hold position–Done Remove 12 ton cart from IR–Done Roll in EC Begin Re-connecting gas sniffers, water, elect., gas, fibers to EC Begin Fold down EC platforms & reinstall dumb waiter (carpenters) Prep for DC West repairs (install platform move WC) Continue sPHENIX support HCal prototype assembly EMCal prototype assembly Tilting/rotating Support Structure assembly & test Future IR evolution modeling PHENIX Annual Safety Review: Done, waiting for action item list

12/19/ Next Week Finish EC hookup & prep for run Begin Pink Sheets DC West broken wire repairs Christmas Eve Holiday (1/2 day) Christmas Holiday Continue sPHENIX support HCal prototype assembly EMCal prototype assembly Tilting/rotating Support Structure assembly & test Future IR evolution modeling

12/19/ VTX/FVTX FVTX/VTX East & West Installedsurvey in IR, survey to be completed today, ready for commissioning by end of this week.

12/19/2013 DC East & West Repairs Summary of Tasks DC West broken wire removal – 12/ /30 5

Mechanical installation complete Services connected Rack assembly & FEM assembly in progress MPC-Ex Initial (Partial) Installation 12/19/2013 6

7 Light Collection for HCal sPHENIX

12/19/2013 8

9 Hcal Light-Tight Enclosure

12/19/ EMCal Prototype

12/19/ EMCal Support

12/19/ EMCal Support Structure Parts

12/19/

12/19/ sPHENIX Modeling support for updated MIE sPHENIX

12/19/ ePHENIX Plan View Elevation View

12/19/ GMH Tasks: Also need to complete Analyzer piping

12/19/ Remaining 2013 Shutdown Schedule sPHENIX HCal & EMCal Prototype Assembly/test8/19-1/20/2014 VTX/FVTX Bias, LV and signal Cabling and Cooling distributionDone ? MPC-Ex LV, Bias and signal cabling and cooling distributionDone MPC-Ex installed acceptance tests Done Remove and stow station 1 south scaffoldingDone Pre-run commissioning and detector prep testing for run 1412/9-1/31/2014 Prep for EC roll in(remove fibers, cooling water and gas)Done Remove manlifts from IRDone Remove deck plates from IRDone Move MuID Collars into IR hold positionDone Remove 12 ton cart from IRDone Roll in EC to run position12/18-12/19/2013 Re-connect gas sniffers, water, elect., gas, fibers to EC12/20-12/24/2013 Fold down EC platforms & reinstall dumb waiter (carpenters)12/20-12/24/2013 Reconnect EC dumbwaiter lift wiring and TOF blowers12/26-12/27/2013 Move MMS to run position12/26-12/27/2013 Install the MuID collars12/26-12/27/2013 DC West wire repairs12/15-12/30/2013 Restore all PHENIX Elec. from shutdown safe modes to operating modes12/23-12/31/2013 Christmas Holiday 12/24-25/2013 New Year’s Day Holiday1/1/2014 Pink sheets12/23-12/31/2013 White Sheets1/2-1/3/2014 Assemble large shielding wall and install plug door (riggers)1/6-1/10/2014 Blue Sheets1/6-1/10/2014 Start Watch Shifts1/7/2014 Start Flammable gas flow1/13/2014 End of Shutdown Party1/10/2014 Close shield wall, install radiation interlocks and prepare for run 141/31/2014 Start run 142/3/2014

12/19/ Safety and Security From Mike Zarcone: 50 pound buckets of Ice Melt have been removed from the entrances of several buildings including 130, 197, 703 and 510 (3 times). Laboratory Protection is aware of the situation and will be looking for those stealing government property. While a bucket of ice melt may not seem significant to some, stealing it can be a cause for termination. Is a $20 bucket of ice melt really worth getting fired for? From the lab’s disciplinary policy: 3. Dischargeable Behavior Violations - examples of these violations are · Theft or unauthorized possession of Laboratory property or the property of any employee, agent, guest, etc. of the Laboratory. Additionally, we do use the ice melt when it’s icy or slippery. Not having it readily available puts you and your fellow employees at risk for injury. We are supposed to be helping one another, not doing things that can hurt others. Please look out for these thieves and let Mike Zarcone, your supervisor, or Laboratory Protection know if you see anyone stealing laboratory property. Thanks for your help!

12/19/ Safety and Security

12/19/

12/19/ Where To Find PHENIX Engineering Info Less than 2 weeks left in 2013.