Pecomine s Project PA n° 42 Inventory, Regulations and Environmental Risks of Toxic Mining Wastes in Pre-Accession Countries Introduction to PECOMINES.

Slides:



Advertisements
Similar presentations
SEEA Experimental Ecosystem Accounting Overview
Advertisements

BlackSea Region Meeting Varna National Reports on Spatial Planning for Coastal Zones and Maritimes Areas Terms of Reference.
its organisational network EIONET
4th European Congress on Regional Geoscientific Cartography and Information Systems Geoscientific information for spatial planning Bologna, June,
Project Structure Inventory European Environment Agency DG Environment New Initiative on Mining Waste Workshop I Regulations Environmental Impact Collaboration.
Pecomine s PECOMINES Project - Second Steering Committee Meeting, Orta, 26 May 2002 Use of Remote Sensing in the PECOMINES Inventory and Impact Assessment.
Institute of Environmental Protection Maciej Sadowski Grazyna Porebska.
J.M. Iriondo 1, N. Maxted 2, S. Kell 2, B. Ford-Lloyd 2 & C. Lara 1 1 Universidad Rey Juan Carlos, Madrid, Spain 2 University of Birmingham, UK Towards.
Toxic Mining Waste in the pre-Accession Countries the pecomines project Marco D’Alessandro, Giovanni Bidoglio, Tamás Hámor, Győző Jordán, Erik Puura, Panos.
Risk Reduction of Mining Accidents in the Tisa Basin Adriana Eftimie – Director PIU National Agency for Mineral Resources NATO/CCMS Pilot Study “Prevention.
Fort Bragg Cantonment Area Cape Fear River Basin LIDAR data have been used to create digital contours and topographic maps. 1.A Digital Elevation Model.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool Alessandra Alfieri UNSD.
SEEA Experimental Ecosystem Accounts: A Proposed Outline and Road Map Sixth Meeting of the UN Committee of Experts on Environmental-Economic Accounting.
Work Packages A JRC Project in Association with Central and Eastern European Pre-Accession Countries Inventory, Regulations and Environmental Impact of.
The Marine Strategy Framework Directive 17th March 2010, Newcastle North Sea Stakeholders Conference Leo de Vrees European Commission (DG Environment,
1 NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) School of Chemical Engineering Unit of Environmental Science and Technology (UEST) Katherine Haralambous.
IAEA International Atomic Energy Agency Overview of legal framework Regional Workshop - School for Drafting Regulations 3-14 November 2014 Abdelmadjid.
INTEGRATED INFORMATION E & H Action Plan Implementation.
UN Framework for the Development of Environment Statistics (FDES) Why shape does matter Adriana Oropeza IV.
The Contaminated Land Regulations – Consolidated Review 21 September 2005 Craig Edwards.
Pilot project “Regional Risk Assessment of Mining Sites and Contaminated Sites in the Upper Silesia Region” Janusz Krupanek, Marek Korcz Institute for.
Athens, June 5, 2006NATO CCMS Pilot Study1 Current Research Topics Dr. Anthimos Xenidis Lab. of Metallurgy National Technical University of Athens (NTUA)
MISSION Sixth Framework Programme Specific Support Action EC-INCO-CT WP05 CHEMICAL AND PHYSICAL CHARACTERISATION OF MULTIFUNCTIONAL MATERIALS.
Environmental auditing
NATO-CCMS Pilot Study Tour de Table - Greece Recent Developments on Contaminated Land in Greece Anthimos Xenidis Laboratory of Metallurgy National Technical.
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
With the contribution of the LIFE financial instrument of the European Community IWA, 14/06/2011, Granada PROJECT LIFE+ ES-AG_UAS LIE09 ENVS/ ES / 0456.
1 Improving Statistics for Food Security, Sustainable Agriculture and Rural Development – Action Plan for Africa THE RESEARCH COMPONENT OF THE IMPLEMENTATION.
JRC - IRMM – 17/18 June 2008 – EAQC-WISE project workshop – Held1 The EAQC-WISE blueprint: Recommendations for a quality control system for chemical monitoring.
Information and transboundary cooperation – challenges and responses Francesca Bernardini United Nations Economic Commission for Europe.
Recommendation 2001/331/EC: Review and relation to sectoral inspection requirements Miroslav Angelov European Commission DG Environment, Unit A 1 Enforcement,
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Brownfields in Baltic States - Lifelong Educational Project CZ/08/LLP-LdV/TOI/ Legal aspects of brownfield redevelopment in Latvia Edmunds Teirumnieks.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Cooperation with the European Environmental Agency - the Way Forward Svetlana Gjorgjeva, Macedonian NFP/EEA Lisbon, November 2009.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
Rafael Rodríguez Clemente. Coordinator* *Estación Biológica de Doñana, CSIC. Sevilla (Spain) MoCo Meeting, Casablanca (Morocco)
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
IDEA Improving Damage assessments to Enhance cost-benefit Analyses Call Identifier: Prevention 1. Actions on the economics of investing in disaster risk.
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
1 Agri-environment analysis at the EEA Projects and goals of the European Environment Agency.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
Short overview of the legal framework of protected sites and status of existing ecological networks in Serbia.
Health and Food Safety EU strategy for Pharmaceuticals in the Environment Patrizia Tosetti DG SANTE European Commission China/EU Pharmaceutical Industry.
New Ecological Science Advice for Ecosystem Protection The EPA Science Advisory Board (SAB) Staff Office supports three external scientific advisory committees.
INVENTORY AND IMPACT ASSESSMENT OF MINING WASTE
Nuclear and Treaty Law Section Office of Legal Affairs
Nuclear and Treaty Law Section Office of Legal Affairs
Introduction to the EEA and the EIONET
Principles and Key Issues
Forum for Air quality Modelling FAIRMODE ew. eea
Project Coordination Group (PCG) for the implementation of the MSFD
1st European Summer School on Soil Survey July 2003
Inventory, Regulations and Environmental Impact of Toxic Mining Wastes
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
13th meeting of CoU Disaster Risk Reduction and Resilience
Natural water Retention Measures
Mandate of the EEA To provide the Community and Member States with:
GROUNDWATER CHARACTERISATION in England & Wales
European Commission activities
Water scarcity and drought
The Biodiversity and Protected Areas Management (BIOPAMA) Programme
ARTS – Assessment of Regional and Territorial Sensitivity
DG Environment, Unit D.2 Marine Environment and Water Industry
Research on Climate Change on Water, including Natural Hazards Contribution to SSG discussions and science-policy interfacing Philippe QUEVAUVILLER European.
Presentation transcript:

pecomine s Project PA n° 42 Inventory, Regulations and Environmental Risks of Toxic Mining Wastes in Pre-Accession Countries Introduction to PECOMINES project

pecomine s PROJECT TEAM: G. Bidoglio, Project Leader National Experts seconded to JRC: A.-M. Vijdea, Remote sensing applications E. Puura, Inventory and impact assessment G. Jordan, Inventory and impact assessment, GIS applications T. Hamor, Legislation and regulatory aspects JRC scientific staff M. D’Alessandro, Impact assessment S. Sommer, Coordination remote sensing and geo-referenced spatial data M.Van Liedekerke, Information management and GIS applications Inventory, Regulations and Environmental Risks of Toxic Mining Wastes in Pre-Accession Countries

pecomine s PECOMINES Principal Objectives to compile an inventory of toxic waste sites from mineral mining in Pre-Accession countries in relation to “sensitive” catchment areas, by combining an indicator approach according to the DPSIR framework and an analysis of satellite remote sensing to compare criteria and legislation for safety disposal of mining waste and for assessment and remediation of contaminated areas in candidate countries with regulations adopted by EU Member States and with the existing EU legislative framework in the area of waste to contribute to the assessment of the consequences of emissions and accidents related to mining wastes in a perspective of ecosystem protection, by comparing approaches and measures for impact evaluation to ecosystem recovery and restoration

pecomine s PECOMINES Rationale DG Environment is currently taking the initiative for the preparation of a proposal of a EU regulatory framework on mining waste, either as a separate piece of EU legislation or as an annex to existing Directives Previous studies have shown that in the EU Member States harmonised and precisely geo-referenced information on active and abandoned mine tailings is fairly limited Data from EUROSTAT/OECD surveys show that mining wastes rank first in the relative contribution of wastes in many Central and Eastern European Countries Given the widespread nature of toxic mining waste in Pre-Accession countries, DG Environment attaches a particular importance to prioritisation in this area, in order to involve the applicant countries during their environmental approximation process from the beginning

pecomine s PECOMINES Rationale Why Mining Waste? In general: it differs from other waste Large volumes of waste in huge areas Often historic waste covered by soil and vegetation Long-lasting, mainly diffuse-source pollutant Catastrophic events are regular Mining waste (s.l.) is generated throughout the mining cycle Has impact on all elements of environment Has long-distance, catchment-scale, cross-border impacts No existing specific national, international, supranational legislation

pecomine s PECOMINES Project Structure Inventory European Environment Agency MoUon Contaminated Sites TC Wastes DG Environment New Initiative on Mining Waste Workshop Regulations Environmental Impact Collaboration with National and Regional Authorities National Experts IWES (EI 4;JRC 42);EURO-LANDSCAPE (SAI 4;JRC 39) (ongoing activities at theAznalcóllar mining site, Spain) JRC Institutional Links Workshop

pecomine s PECOMINES Methods The state-of-art study reviews relevant EU and international legislations (environment, water, nature conservation, mining). The communications for the inquiry are carried out through personal contacts, written inquiries, missions etc. Through collection of PECO regulations and licency practices, the complete texts of relevant regulations, standards and regulatory authorities licensing practice are obtained.

pecomine s Multi-SCALE MODELLING Catchmentscale Site surroundings scale Site scale Linkage of different scales Different amount of data is available for the toxic mining waste sites, and different scales have been studied. In addition, different modelling tools have been used for the scales. The linkage between different scales is carried out by developing geo-referenced spatial data interfaces - the type of data, taking into account site-specifity and catchment-specifity. PECOMINES Methods

pecomine s EISAIConsejeria de Medio Ambiente de AndaluciaConsejo Superior de Investigacion Cientificas (CSIC)In 1999 and 2000 Collaborative Field Campaigns were organised together with EI, SAI, Consejeria de Medio Ambiente de Andalucia and the Consejo Superior de Investigacion Cientificas (CSIC). Achievements : –Characterisation of the residual levels of heavy metal contamination after initial remediation procedures –Establishment of a relationship between soil contamination and spectral response of airborne imaging spectrometry Learning from studying mining sites: the Guadiamar River Aznalcóllar Mine Accident Integrated approach at watershed level to determine pollutant pathways and impacts on the Guadiamar River basin ecosystem PECOMINES Methods

pecomine s PECOMINES Principal Deliverables Inventory and mapping of toxic waste sites from mineral mining in Pre-Accession countries (document and geo- referenced database) Environmental Vulnerability Indicators in relation to toxic waste sites from mineral mining using DPSIR approach Contribution to DGs on definition of criteria for assessment of contaminated lands Provide input data for an environmental impact assessment of management of toxic mining wastes Technical reports on combined survey and assessment of exposure pathways at contaminated sites Harmonised and geographically referenced tool to predict the potential risk from mining wastes at local and regional level