The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.

Slides:



Advertisements
Similar presentations
Jack Mc Gowan, CEM Optimize operating cost for cooling Improve Capital Projects Improve learning environments GHP Best Practices Geothermal Heating and.
Advertisements

Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
GEOTHERMAL AND SOLAR PANEL INSTALLATION BY GRACE BALDWIN.
Kevin Edstrom Mechanical Option 2011 Senior Thesis April 12 th, 2011 Georgetown University New Science Center Washington, DC.
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
ENERGY SOURCES. ALTERNATIVE ENERGY SOURCES Geothermal Energy comfort… savings... environment.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Richard Simmons Drilling Company, Inc. 60 Drill Rig Drive, Buchanan, Virginia Telephone (540) Geothermal Heating & Cooling How it Works.
Lecture 30 Heat Pump Systems.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
BENTLEYVILLE, PENNSYLVANIA KYLE COURTNEY | MECHANICAL OPTION | DUSTIN EPLEE.
 a machine that moves heat from a location to another location, using mechanical work.
Passive House Seminar for Professionals from the Building Sector
DEA Clandestine Laboratory Training Center Penn State University Architectural Engineering Mechanical Option David M. Potchak.
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
Presentation to HOK. 2rw.com NET ZERO ENERGY. SITE < or = renewable energy generated Building produces as much energy as it uses over the course of a.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
SENIOR THESIS PRESENTATION An Evaluation of Water-Side Economics & Emissions Sinai Hospital South Tower Vertical Expansion 2401 W. Belvedere Ave. | Baltimore,
The New RLPS Architects Office Building Lancaster, PA Brice Ohl – Mechanical Option Presented on 4/10/13.
SENIOR THESIS PRESENTATION
ET 493 Senior Design Spring 2013 By: Justin Cifreo, Benjamin Gabriel, Nathan Taylor Instructor: Dr. Cris Koutsougeras Advisor: Dr. Junkun Ma Mechanical.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Berks Classroom and Lab Building Reading, Pennsylvania Julia Broskey Mechanical Option AE 482 – Senior Thesis Faculty Advisor :Dr. William P. Bahnfleth.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
University Ridge at E ast Stroudsburg University Matthew Carr Spring 2007 Mechanical Option Faculty Advisor: Dr. Freihaut.
Army Reserve Center Newport, Rhode Island Alexander Hosko Mechanical Option.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
Des Places Residence Hall Duquesne University Pittsburgh, PA Peter Edwards – Mechanical Option Advisor - Dustin Eplee Des Places Residence Hall Senior.
Geothermal Heat Pumps Connecticut Geothermal Association John Sima, PE.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Hilton Baltimore Convention Center Hotel Andrew Rhodes Spring 2007 Faculty Advisor: Dr. Bahnfleth.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Geothermal. Defining “Geothermal” Energy Dictionary definition – Relating to the internal heat of the earth The Earth acts as a giant solar collector,
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Geothermal Heating and Cooling Applications Rachel Kerekgyarto.
J. david maino the pennsylvania state university architectural engineering lighting/electrical.
New Castle Center for Delaware Hospice, Inc Zachary Klixbull Penn State University – Architectural Engineering Mechanical Option Advisor: Professor Bahnfleth.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Harley-Davidson Museum
ENVIROCENTER PHASE II JESSUP, MD
David Anderson Mechanical Option
Grunenwald Science and Technology Building
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
The Ed Roberts Campus Berkeley, CA Introduction Existing Systems
The Bond Street Wharf Baltimore, Maryland
Senior Thesis Presentation
Virtua Replacement Hospital -Voorhees NJ
Architectural Engineering, The Pennsylvania State University
Presentation transcript:

The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007

Presentation Outline  Project Background  Current Mechanical Systems  Mechanical Alternatives – Depth  Life Cycle vs. First Cost Analysis  Electrical Generation – Breadth  Final Recommendation  Project Background  Current Mechanical Systems  Mechanical Alternatives – Depth  Life Cycle vs. First Cost Analysis  Electrical Generation – Breadth  Final Recommendation Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007

Project Background Project Overview  Site: Emmitsburg, Maryland  Size: 60,000 SF / 3 Stories / 180 Beds  Cost: $10,800,000 Total / $3,400,000 MEP Primary Project Team  Owner: The Mount St. Mary’s University  Architect: Ayers / Saint / Gross Architects  Construction Manager: Gilbane  Civil Engineer: Harris, Smariga, & Associates, Inc.  Structural Engineer: Keast & Hood Co.  MEP Engineer: Burdette, Koehler, Murphy, and Associates, Inc. Project Overview  Site: Emmitsburg, Maryland  Size: 60,000 SF / 3 Stories / 180 Beds  Cost: $10,800,000 Total / $3,400,000 MEP Primary Project Team  Owner: The Mount St. Mary’s University  Architect: Ayers / Saint / Gross Architects  Construction Manager: Gilbane  Civil Engineer: Harris, Smariga, & Associates, Inc.  Structural Engineer: Keast & Hood Co.  MEP Engineer: Burdette, Koehler, Murphy, and Associates, Inc. Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007

Project Background Architecture  Designed to create the appearance of a village  Comprised primarily of 4-bedroom suites, each with a shared bathroom and living area  Small lounge area provided on each floor  Designed to achieve LEED Certification Architecture  Designed to create the appearance of a village  Comprised primarily of 4-bedroom suites, each with a shared bathroom and living area  Small lounge area provided on each floor  Designed to achieve LEED Certification Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007

Presentation Outline  Project Background  Current Mechanical Systems  Mechanical Alternatives – Depth  Life Cycle vs. First Cost Analysis  Electrical Generation – Breadth  Final Recommendation  Project Background  Current Mechanical Systems  Mechanical Alternatives – Depth  Life Cycle vs. First Cost Analysis  Electrical Generation – Breadth  Final Recommendation Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007

Current Mechanical Systems Geothermal Heat Pump System  Exterior  Originally designed with 125, 200 ft deep vertical wells Geothermal Heat Pump System  Exterior  Originally designed with 125, 200 ft deep vertical wells Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007  Redesigned with 64, 400 ft deep vertical wells  Wells located in the courtyard in front of the building  Stem from distribution vault and connected to building mechanical room  Wells located in the courtyard in front of the building  Stem from distribution vault and connected to building mechanical room

Current Mechanical Systems Geothermal Heat Pump System  Interior  58 water-source heat pumps linked to the ground loops  Individual units ranging from 1 – 2.5 tons for each space  Condenser water pumps (2) rated at 375 GPM  No need for boiler or cooling tower Geothermal Heat Pump System  Interior  58 water-source heat pumps linked to the ground loops  Individual units ranging from 1 – 2.5 tons for each space  Condenser water pumps (2) rated at 375 GPM  No need for boiler or cooling tower Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007

Current Mechanical Systems Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007 Ventilation System  Building designed for natural ventilation Ventilation System  Building designed for natural ventilation  Exhaust fans exchanged for (3) 1050 CFM energy recovery units  Each heat pump closet receives 50 CFM of ventilation air  Can reduce outdoor air conditioning loads by 80%  Exhaust fans exchanged for (3) 1050 CFM energy recovery units  Each heat pump closet receives 50 CFM of ventilation air  Can reduce outdoor air conditioning loads by 80%  Supplemental ventilation achieved from energy recovery of exhaust air  Building pressurization  Additional ventilation when windows are closed  Supplemental ventilation achieved from energy recovery of exhaust air  Building pressurization  Additional ventilation when windows are closed Domestic Service Water System  (1) 750 GPH, 600 MBH domestic water heater with (1) 35 gallon expansion tank  Hot water recirculated by a 15 GPM in-line pump Domestic Service Water System  (1) 750 GPH, 600 MBH domestic water heater with (1) 35 gallon expansion tank  Hot water recirculated by a 15 GPM in-line pump

Presentation Outline  Project Background  Current Mechanical Systems  Mechanical Alternatives – Depth  Life Cycle vs. First Cost Analysis  Electrical Generation – Breadth  Final Recommendation  Project Background  Current Mechanical Systems  Mechanical Alternatives – Depth  Life Cycle vs. First Cost Analysis  Electrical Generation – Breadth  Final Recommendation Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007

Mechanical Depth Goals:  Perform analysis of yearly energy usage and cost of geothermal system  Select comparable alternative units to model in HAP  Evaluate results in order to determine merits of each  Perform first cost and life cycle analyses  Critique geothermal system based on results  Perform analysis of yearly energy usage and cost of geothermal system  Select comparable alternative units to model in HAP  Evaluate results in order to determine merits of each  Perform first cost and life cycle analyses  Critique geothermal system based on results Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007 Purpose:  University very interested in green design  Geothermal uses less energy but first costs are high  Are first costs justified?  University very interested in green design  Geothermal uses less energy but first costs are high  Are first costs justified?

Mechanical Depth Was geothermal really the best choice for this project? Proposed Alternatives  Traditional Water-Source Heat Pumps  Mini-Split DX Air-Source Heat Pumps Proposed Alternatives  Traditional Water-Source Heat Pumps  Mini-Split DX Air-Source Heat Pumps Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007

Mechanical Depth Case 1: Geothermal Heat Pump System  Reject heat to and extract heat from the earth at stable temperatures year-round  Most efficient in cooling mode, especially at part load conditions  Requires less maintenance, but has a very high first cost due to the wells  Reject heat to and extract heat from the earth at stable temperatures year-round  Most efficient in cooling mode, especially at part load conditions  Requires less maintenance, but has a very high first cost due to the wells Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007 Case 2: Water-Source Heat Pump System  Reject heat to cooling tower and extract heat from boiler  Less efficient in cooling mode, but greater efficiencies when heating  Requires additional equipment  Reject heat to cooling tower and extract heat from boiler  Less efficient in cooling mode, but greater efficiencies when heating  Requires additional equipment Case 3: Air-Source DX Split Heat Pump System  Reject heat to and extract heat from exterior condensing units via refrigerant  Less efficient than water-source applications  Eliminates need for condenser water pumps, cooling tower, and boiler  Reject heat to and extract heat from exterior condensing units via refrigerant  Less efficient than water-source applications  Eliminates need for condenser water pumps, cooling tower, and boiler

Mechanical Depth McQuay Water Source Heat Pumps  Closed Loop – Enfinity Model FCV Vertical Units (1 – 2.5 Ton)  Ground Loop – Enfinity Model FCW Vertical Units (1 – 2.5 Ton) McQuay Split System Air Handlers  Condenser – Model HCC Heat Pump (1.5 – 2.5 Ton)  Evaporator – Model SAH Air Handler (1.5 – 2.5 Ton) Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007

Mechanical Depth Case 1: Existing Geothermal System Results  Annual Operating Costs: $115,002  MEP Annual Operating Costs: $46,604 Case 1: Existing Geothermal System Results  Annual Operating Costs: $115,002  MEP Annual Operating Costs: $46,604 Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007

Mechanical Depth Case 2: Proposed Water-Source System Results  Annual Operating Costs: $123,709  MEP Annual Operating Costs: $55,340 Case 2: Proposed Water-Source System Results  Annual Operating Costs: $123,709  MEP Annual Operating Costs: $55,340 Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007  Water-Source 8% more efficient when heating  Geothermal 40% more efficient when cooling  Water-Source 8% more efficient when heating  Geothermal 40% more efficient when cooling

Mechanical Depth Case 3: Proposed Air-Source System Results  Annual Operating Costs: $125,971  MEP Annual Operating Costs: $57,299 Case 3: Proposed Air-Source System Results  Annual Operating Costs: $125,971  MEP Annual Operating Costs: $57,299 Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007  Geothermal 50% more efficient when heating  Geothermal 43% more efficient when cooling  Geothermal 50% more efficient when heating  Geothermal 43% more efficient when cooling

Mechanical Depth Annual Cost Comparisons Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007  Geothermal savings of 15.8% annually over water-source  Geothermal savings of 18.7% annually over air-source  Geothermal savings of 15.8% annually over water-source  Geothermal savings of 18.7% annually over air-source

Presentation Outline  Project Background  Current Mechanical Systems  Mechanical Alternatives – Depth  Life Cycle vs. First Cost Analysis  Electrical Generation – Breadth  Final Recommendation  Project Background  Current Mechanical Systems  Mechanical Alternatives – Depth  Life Cycle vs. First Cost Analysis  Electrical Generation – Breadth  Final Recommendation Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007

Life Cycle vs. First Costs Equipment Costs  Air-Source cheapest – no boiler, cooling tower, or condenser water pumps Equipment Costs  Air-Source cheapest – no boiler, cooling tower, or condenser water pumps Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007 First Cost Comparisons Installation Costs  Geothermal most expensive – excavation and installation of the wells  4 times more expensive than Air-Source  5 times more expensive than Water-Source Installation Costs  Geothermal most expensive – excavation and installation of the wells  4 times more expensive than Air-Source  5 times more expensive than Water-Source Total Installed First Cost  Geothermal over $100,000 more expensive than other systems Total Installed First Cost  Geothermal over $100,000 more expensive than other systems

Life Cycle vs. First Costs 25 Year Life Cycle  Geothermal saves $17,000 over Water-Source  Geothermal saves $28,000 over Air-Source 25 Year Life Cycle  Geothermal saves $17,000 over Water-Source  Geothermal saves $28,000 over Air-Source Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007 Life Cycle Cost Comparisons

Life Cycle vs. First Costs Payback Period for Geothermal  17.5 years for Air-Source  19.2 years for Water-Source Payback Period for Geothermal  17.5 years for Air-Source  19.2 years for Water-Source Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007 Life Cycle Cost Comparisons Other Issues  Relocation of water utility line  Lengthening of schedule  Possible need for supplemental heating and cooling at extra cost Other Issues  Relocation of water utility line  Lengthening of schedule  Possible need for supplemental heating and cooling at extra cost Even So…  Dormitory could have a expected life of more than 50 years  Long term savings will be substantial  Savings would increase if electrical costs went up Even So…  Dormitory could have a expected life of more than 50 years  Long term savings will be substantial  Savings would increase if electrical costs went up

Presentation Outline  Project Background  Current Mechanical Systems  Mechanical Alternatives – Depth  Life Cycle vs. First Cost Analysis  Electrical Generation – Breadth  Final Recommendation  Project Background  Current Mechanical Systems  Mechanical Alternatives – Depth  Life Cycle vs. First Cost Analysis  Electrical Generation – Breadth  Final Recommendation Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007

Electrical Breadth Goals:  Determine the available roof space for PV panels  Perform analysis of possible electrical generation using RETScreen  Decide whether a PV system would be worth the investment  Determine the available roof space for PV panels  Perform analysis of possible electrical generation using RETScreen  Decide whether a PV system would be worth the investment Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007 Purpose:  University very interested in green design  Environmental solar system tempting for LEED points  Offset some of the 860 MWh of annual building energy use  Could a PV system be economically designed for this project?  University very interested in green design  Environmental solar system tempting for LEED points  Offset some of the 860 MWh of annual building energy use  Could a PV system be economically designed for this project?

Electrical Breadth Available Roof Space Primary Case  3255 ft 2 available space  65% Usable  155 Panels  South-Facing Primary Case  3255 ft 2 available space  65% Usable  155 Panels  South-Facing Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007 Alternate Case  1942 ft 2 available space  80% Usable  112 Additional Panels  Southeast-Facing Alternate Case  1942 ft 2 available space  80% Usable  112 Additional Panels  Southeast-Facing

Electrical Breadth Photovoltaic Analysis Results Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007 Primary Case  MWh useful energy generated annually  4% of annual energy usage – savings of $4,562 Primary Case  MWh useful energy generated annually  4% of annual energy usage – savings of $4,562 Alternate Case  MWh useful energy generated annually  7% of annual energy usage – savings of $7,827 Alternate Case  MWh useful energy generated annually  7% of annual energy usage – savings of $7,827 Payback Period Not Acceptable!

Presentation Outline  Project Background  Current Mechanical Systems  Mechanical Alternatives – Depth  Life Cycle vs. First Cost Analysis  Electrical Generation – Breadth  Final Recommendation  Project Background  Current Mechanical Systems  Mechanical Alternatives – Depth  Life Cycle vs. First Cost Analysis  Electrical Generation – Breadth  Final Recommendation Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007

Final Recommendation Mechanical Heating and Cooling System  Geothermal system best alternative  Most efficient system  Higher first costs offset by possible long term savings  Environmentally friendly and innovative  Geothermal system best alternative  Most efficient system  Higher first costs offset by possible long term savings  Environmentally friendly and innovative Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007 Photovoltaic Electrical Generation  Very expensive first cost  Inefficient system with very long payback period  Not worth the investment at present  Very expensive first cost  Inefficient system with very long payback period  Not worth the investment at present

Questions? Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007