1 PS cabling status and planning Overview 14.02.2007 Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

M1 Installation Schedule Plans Burkhard Schmidt Muon Meeting
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 Franck SENÉE1 LP-TPC: Micromegas Panel and Cosmic Muon Trigger.
M.N Minard SPD cabling overview SPD cable chain & tray SPD cable chain & tray Motorisation PS/SPD Motorisation PS/SPD Work on PS Work on PS.
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
E.Guschin (INR,Moscow) 14 February 2007Calorimeter commissioning meeting, CERN Digital camera with LED monitoring Status: Photographs of SPD are completed.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
1 HCAL production, QC and preparation for installation Overview of the status report Rustem DZHELYADIN (IHEP, Protvino)  The general status.
08/10/2007 – DT2 Science Tea Robert KRISTIC1. KEY DATA + DESIGN PARAMETER 08/10/2007 – DT2 Science Tea Robert KRISTIC 2 HCAL ECAL PS Lead Absorber SPD.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1 C-side VFE-FE: PS cabling Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) Cable trays design: 1.PS-top cable tray 2.PS/SPD lateral cable.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Enrique Calvo Alamillo Ds DHCAL m 3 modular structure. 2. Basic modular distribution. 3. Guiding and repositioning system. 4. Detector.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
May 31, 2010Bill Wisniewski1 Mechanical Integration Issues.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
DCal-ALICE integration and installation plan and status A. Tauro.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
Rodger Bossert/Shlomo Caspi
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Micro Vertex Detector of PANDA Strip Detector
Some proposals on HV circuits realization for segmented straw detector
Far Detector Activities Late 2017 – Early 2018
IFR detector mechanics
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
HERD Tracker Layout Considerations
Question & Suggestions March 17th
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
as a prototype for Super c-tau factory
Presentation transcript:

1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed 2.PS/C lateral cable tray (3days)installed 3.PS-SPD/C/A bottom cable tray (5days)installed 4.PS Cable Chain/C outer (2day)installed 5.PS Cables/C top on detector (takes 4 days) installed 6.PS Service Cables/C bottom on detectorin progress To be done : to complete on 1.PS/A lateral cable tray PS Cable Chain/C inner install PS Signal Cables/C bottom on detector (?days) Bend Cable Chain/C PS/C Cabling on Gallery (?days) Proceed with A-side (21+?+? days) Complete PS cabling ( ) conservative schedule?

2 PS cabling status and planning PS/C top cabling Rustem DZHELYADIN (CERN&IHEP, Protvino) All cables have been arranged to “Attachment” grid: Thanks to “Passerelle” GOOD ACCESS is IMPORTANT PS/C in CENTRAL later moved to OPEN C C C-side A-side

3 PS cabling status and planning PS/C top cabling (2) Rustem DZHELYADIN (CERN&IHEP, Protvino) 101 reels – PS/C-top Two bundle layer of 38mm 17mm gap left (of 92mm)

4 PS cabling status and planning PS/C bottom cabling Rustem DZHELYADIN (CERN&IHEP, Protvino) Lateral cable tray 800 cm x (60 x 5.4) cm 2 Bottom tray 425cm x (30 x x 5.4) cm 2 Bottom tray suspension 3mm thick on lead side SPD/C bottom tray 425cm x (30x10.4)

5 PS cabling status and planning Further problems Rustem DZHELYADIN (CERN&IHEP, Protvino) 101 reel (top) + 82 reel (bottom) reel total PS/C To be bent like this

6 PS cabling status and planning Experience Rustem DZHELYADIN (CERN&IHEP, Protvino) Some re-design was required : cable fixing modification was required Steel pipes ~500 to be produced Bend to insert Needs free space

7 PS cabling status and planning Conclusions Rustem DZHELYADIN (CERN&IHEP, Protvino) What we learned? – SPD cables need to be delivered in advance (by mid. March?); – excel file with all required data, like for PS, should be provided (early March?); – drawing with cable fixing points on the “attachment” bar for ALL cables; – SPD cable tray design to be released (by end of February?); – CABLOFIL tray order in advance (next week? - up to 4 weeks delivery); – SPD trays production and installation simultaneously (minimize overall time); – SPD rails and “chariot” to be installed as soon as possible (by end of March?); – the goal is to complete SPD cabling within 4-5 weeks (in April?)+ assembly(??).