Kirill Egorov Indiana University 20 October, 201115th Thermosyphon Workshop 3D-modelling for hydraulic assembly Preliminary design of the TS “Balcony unit”

Slides:



Advertisements
Similar presentations
Air Conditioners and Heaters
Advertisements

Beginning to use the language of position. Four children stand in a row. Children discuss who is at the front/first in the row? Who is behind? Who is.
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
Anouchka Poloubinski-Blandin Anastasija Krivonosova Anthony Baptista Luis Fernandes Plains-Wanderer N° 9.
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
Pierre Bonneau EN/CV/DC
November 19, 2013 Agenda 1.Roll 2.PowerPoint titled: Heat Technology 3.Video “Head Rush: Liquid Nitrogen Balloon”
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
Air Conditioning Heating Refrigeration
Detector Cooling Project Thermosiphon Project Status Report
Vacuum system.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
The Main Activities of the Construction Industry (unit 3 b)
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Section 3 Using Heat.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Space, labs & testing equipment Paolo Petagna Meeting on CO 2 Cooling CERN 04 February 2015.
 Roof integration  USA15 cavern integration Sylwia Wojnarska CERN - European Organization for Nuclear Research Warsaw University.
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Cooling System Solutions
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
60kW Thermosiphon control system
Michele Battistin Elena Perez Rodriguez 10 November 2010
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
Pipe and station integration ALEX BITADZE CERN- European Organization for Nuclear Research ATLAS Experiment
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
ICARUS Collaboration Meeting Dec A. Scaramelli.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Experiment 6: Rankine Cycle Yvette Triay Reporter Group 3.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
Slide 1 of 33 Home Inspection Class Redfin’s Montgomery Team September 5, Bethesa, MD Host: Michael Wells & Margaret Plumly Like:
Unit 2 Lesson 3 Technology Systems. Big IDEA Big Idea: There are nine “Core Technologies” that are fundamental to all technology systems that must be.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. Bad case of Installation RAC-B-A07.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Air Distribution Control
ATLAS ITk Baby-DEMO update
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
CLIC Handling Engineering Update
Safety approval of the installed copper cooling pipes
Tutorial-02 Refrigeration System
ATLAS Thermosiphon Readiness Review 17th March 2016
Forum on Tracking Detector Mechanics - Bonn, May 2016
Heating, Ventilating, and Air Conditioning
BDS Cryogenic System RDR Status and EDR Plans
From Design to Installation courtesy R. Folch S. Atieh TS / MME
USA-15 Compressor displacement for maintenance
Heating, Ventilating, and Air-Conditioning
______________ Combustion Engine
Second Meeting of the Material Budget & Engineering Working Group
ILC Experimental Hall Cryogenics An Overview
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
FREE Meeting Rooms 8-12a WIFI Balcony 300 MBPS SUPERFAST
as a prototype for Super c-tau factory
SC1R Cold Box PDR Assembly Sequence
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Kirill Egorov Indiana University 20 October, th Thermosyphon Workshop 3D-modelling for hydraulic assembly Preliminary design of the TS “Balcony unit” in USA15.

20 October, 20115th Thermosyphon Workshop2 TS “Balcony unit”… Where is the balcony? It’s here! USA15 level 3

20 October, 20115th Thermosyphon Workshop3 Where is the compressor room to connect the “balcony unit”? Keep in mind this white column!!! …and this cable tray

20 October, 20115th Thermosyphon Workshop4 The white column is a part of the USA15 ventilation system. Where is the bottom part?

20 October, 20115th Thermosyphon Workshop5 This is the bottom part of the white column This is the bottom part of the cable tray Compressor room door Keep in mind these two red areas in front of and behind the tank 1 2

20 October, 20115th Thermosyphon Workshop6 The compressor room is found! The compressor room entrance is under this line The tank is under this white area 1 2 3

20 October, 20115th Thermosyphon Workshop7 …and without drilling of ceiling cm

20 October, 20115th Thermosyphon Workshop8 “Balcony unit” – 3D modelling of components 31kW electric heater Filters 56kW heater Dummy-load Heat-exchanger for sub-cooling Flowmeter

20 October, 20115th Thermosyphon Workshop9 “Balcony unit” – 3D assembling This assembling doesn’t include a support frame There are ~760 3D-solids here

20 October, 20115th Thermosyphon Workshop10 “Balcony unit” – 3D assembling Blue pipes need thermal insulation

20 October, 20115th Thermosyphon Workshop11 “Balcony unit” – 3D integration There are four fixing point for the balcony The support #4 is standing on the roof of the compressor room ~2450 kg without support frame

20 October, 20115th Thermosyphon Workshop12 “Balcony unit” – 3D integration warm liquid to detector cold vapor to condenser warm vapor from detector cold liquid from condenser

20 October, 20115th Thermosyphon Workshop13 “Balcony unit” – 3D integration 1,4 m <1,2 m >3 m

20 October, 20115th Thermosyphon Workshop14 Conclusion There are 3D models for all “Balcony unit” components. The preliminary design is ready. The design of the supporting frame will be ready soon after approval of all the components. The strength of the balcony needs a confirmation from the CERN civil engineering.