Activity # 1 Problem Solving/ Engineering Design Process IET 120-Technology Systems Team Harris & Jent.

Slides:



Advertisements
Similar presentations
10 Rules To Manage Your Boss faster decisions, better decisions and more trust.
Advertisements

Attention (your target market) !. Are you (their problem) ?
The Five Finger Method Who ? Wha t? How ? Whe re? Whe n? Wha t? Who ? Whe n? Whe re? How ? SAT Math – A Strategic Approach Rational Routes.
While CCTV is Transitioning to IP, Fiber Optics and Wireless What about Analog Balun/Hub Technology?
METHODS OF RETROFITTING
Share with Pride Train Mounted Laser Survey of Birmingham New Street Area Resignalling Phase 7. Neil Archer – Signalling Innovations Group Rob Dutton -
System Engineering & Economy Analysis Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
ELK Solutions’ Interview Prep
NETS Network Upgrade!.  304 Telecommunication Outlets (TO's) each with 4-copper and 4-fiber connections were installed.  255,000 Feet of CAT6A copper.
Network Engineering Taster Day Mark Clements. 30 March 2012Engineering Taster Day 2 Welcome to Engineering Taster Day: Morning Session Ambassadors Fire.
Groundswell Energy Starter Guide: Clean Energy for Your Organization.
 The amount of time it takes a computer to solve a particular problem depends on:  The hardware capabilities of the computer  The efficiency of the.
Marwan Al-Namari Week 2. ADSL : Asymmetric Digital Subscriber Line Ethernet networks - 10BASE-T - 100BASE-TX BASE-T BASE-TX (Cat5e.
1 Setup Reduction For CNC Principles Copyright 2001.
1 Telecom Cabling Testing and cable certification.
Network Capacity Planning IACT 418 IACT 918 Corporate Network Planning.
Copyright © 1998 Wanda Kunkle Computer Organization 1 Chapter 2.1 Introduction.
How to build your own computer And why it will save you time and money.
Summary of Algo Analysis / Slide 1 Algorithm complexity * Bounds are for the algorithms, rather than programs n programs are just implementations of an.
Project Planning Day 2 An Old Adage: Fail to Plan... and You Plan to Fail!
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Holy Saviour Family Maths Night July 30 th :00 – 8:30pm Challenging all children in the mathematics classroom.
1 Telecom Cabling Patch panels, cabinets and raised floors.
Understanding Feasibility Reports TCO 341 Dr. Codone Fall 2002.
Planning Your Career How Planning Helps
“Clean” and Efficient Public Transportation Kapil Kanhai Yik Ho.
Spreadsheets in Finance and Forecasting Presentation 8: Problem Solving.
BIS Internship Summary Powerpoint Created by BIS Student Cylor Morgan (used with permission)
Objective: I will be able to explain the three steps of the Engineering Design Process.
© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name What Lean Means to Printers Young.
1. 2 IMPORTANCE OF MANAGEMENT Some organizations have begun to ask their contractors to provide only project managers who have been certified as professionals.
The Decision-Making Process. Decision-Making The whole process starts with finding out what the problem is and ends with an analysis of the solutions.
10 Day Challenge. This is you. You pay your $499 to get licensed and set up your online store. The first goal is to get to the position of QTT as quickly.
MIAMI UNIVERSITY BUS SYSTEM IMPROVEMENT PLAN. What’s the problem? ●A current Miami student pays $66 per semester for transit fees that goes towards the.
Example: Sorting on Distributed Computing Environment Apr 20,
DT1 Gas Section Debrief of 2005 activities.. The Purpose of the Debrief  Compare plan and achievements.  Analyze how the work is done ? Do we meet the.
April 26, CSE8380 Parallel and Distributed Processing Presentation Hong Yue Department of Computer Science & Engineering Southern Methodist University.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Vehicle & Crew Scheduling Unit 5: Staff & Fleet Scheduling.
Decision Making. Why is this important We make decisions daily. A decision making process ensures you make a based upon quantifiable data.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Steps of Problem Solving in Health Management Going for the 3 Increases: Increase in Health, Increase in Happiness & Increase in Energy Strategies for.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
Cloud Computing Project By:Jessica, Fadiah, and Bill.
Important measuring devices in automobiles
Business environments are facing constant CHANGE due to GLOBALISATION, technological advances, changing consumer demands and new ways of organising work.
Project Pick a partner and build a pulley system with string, weight, and a spring scale. Switch with another group’s system and see if you can predict.
DECIDE METHOD A six step method used to help you identify and solve a problem in a healthy way.
Intelligent Boiler Sequencing
Presented by Matt McClymonds.  Project Essentials ◦ Project Objective  Prepare the campus for a new telephone system ◦ External Conditions  Converged.
Network infrastructure for CERN DataCenter HEPiX Fall 2015.
Deciding the Future of Tracking Panels September 7, 2005.
Spencer Gauthier. Mission Statement Efficiency Brothers is here to make a transition to a more fuel efficient future easier and less costly. We know that.
1. WHAT IS A PROJECT? “A project is a problem scheduled for solution.” This definition forces us to recognize that projects are aimed at solving problems.
FINANCE Personal Financial Planning. What we will discuss  How to create a financial plan  How to develop your financial goals  How to evaluate the.
Comparative Investment Problems ©Dr. Bradley C. Paul 2002.
September 30, 2008 Jim Van Dyke, Web:
Approximation Algorithms based on linear programming.
FCC-DOL Joint Workshop on Communication Tower Safety RFI Panel February 11, /11/2016 FCC-DOL Joint Workshop on Communication Tower Safety 1.
COMMON TEST TECHNIQUES FROM TESTING FOR LANGUAGE TEACHERs.
Network Topology and LAN Technologies
Computer Network Collection of computers and devices connected by communications channels that facilitates communications among users and allows users.
Service lives of R&D.
The 5S numbers game. 1 1.
The 5S numbers game..
Computer Systems Department.  Introduction  Course Objectives  Grading Policy  Lab Policy  Structured Cabling.
The 5S numbers game..
And Effective Decision Making
Trillo Apparel Company Revised Delivery Plan
Presentation transcript:

Activity # 1 Problem Solving/ Engineering Design Process IET 120-Technology Systems Team Harris & Jent

The Problem Cable Rack, is a floor mount rack that all of the cables go to. There can be different configurations but in all there are patch panels mounted in the rack that the cables are terminated to. From the patch panels we use patch cables to connect to network switches that are also mounted in the rack. Running a shorter run cable versus a longer cable run. Upgrading a school’s data network to Cat6a network cable. Cat6a cable allows data transmission speeds of up to 10 GB/s The length limit for Cat6a cable to run to standard is 100m (328ft.) Background of the Problem

( Problem): One classroom is being pulled to a rack which will make the cables very close to the length limit for the cables to run to standard. Since the school was built, there has been an extra rack added that is closer to the classroom. (length limit of cable is 328ft) The problem with the shorter pull is that it has many corners to negotiate making it harder to pull than the straight and longer run. The shorter run is about 150ft where the longer is at least 300ft. The current plan from the design engineer is to make the longer pull. (Goal): To run the most cost efficient length and to achieve least amount of stress on the cable. The longer run will be less stressful on the installer and the cable, by going the short route it saves a significant amount of cable, but makes the job more difficult. Also it is imperative to gauge the risk that the longer pull may not pass certification due to length and factor it into any decision. Problem & Goal Statement

Step 4: (Consider the consequences of each alternative) The shorter pull will likely cost an extra 2 hours to complete compared to the longer pull. A crew of 2 workers making $20 an hour will cost $80 extra to do this. This will put more pressure on the crew to complete the job on the deadline. Even though the longer pull is easier, 12 cables that are 150ft longer will use around $550 more in material. Also if the longer cables are over the length limit the crew will have to re- run the cables to the shorter rack anyway, which would cost more money and even more time. Step 5: (Select the best solution) The material cost savings of running the shorter cables heavily outweighs the extra cost of labor for the short pull. When coupled with the fact we know that the shorter pull is within length limits the best solution is to pull the shorter cable run. Step 6: (Implement the solution) We decide to run the shorter cable pull. Step 7: (Evaluate the action taken) The shorter pull saved at least $400 on the job, the extra time it took to run the shorter pull was manageable to complete the job on time. We did not have to worry about the cables being too long. The shorter pull was the best choice. Step 1: (Recognize the problem) The current design calls for a cable run that will possibly be too long. If we run the longer cable and it proves to be too long we will have to find another alternative anyway. We know that the other option is well within length limits and will save on material, but will be much more challenging to install. Step 2: (Define the problem) We have two possible network racks to pull new cables to. We have determined that one option will be around 300 feet, possibly more that the 328ft limit, even though it is straight and will be easy to pull. The other option is half as long but has many corners and tight spaces to negotiate making the job harder and taking more time. By using half of the cable on the shorter run compared to the longer we will save money in material that may offset the extra time needed for the harder pull. There is a deadline to this job so the time it takes to run the cables is a significant factor. Step 3: (Brainstorm) There are only two options with this particular problem. We can pull the longer run and chance that it will pass certification, because its will be easier and take less time. Or we can pull to the shorter rack that will be harder to do and cause more pressure to the deadline. Problem Solving Approach

Information Collected Price of the cable being used (Panduit Cat6a CMR copper cable) is $300 per 1000ft spool Total number of cables to be pulled into the classroom is 12 Total cost of cable needed for longer runs is approximately $1100 Total Cost of cable needed for shorter runs is approximately $550 Examining the rack determines that space will be available on either rack to patch the new drops into network switches Sufficient cabling infrastructure (cable tray, J-hooks, conduit, etc.) is already present to run cables in either direction Development of Alternative Solutions We could refuse to make a decision and wait for the design engineer to decide on the problem. That would take much more time and would likely anger our bosses, which could put our jobs in jeopardy. Making another rack that would be straight and shorter would not be feasible from a cost or time standpoint. We could quit our job but we need our job to pay our rent and bills. We can pull the longer pull according to the original plan. We can make a decision to change the plan and pull the shorter pull Selection of Best Solution The shorter pull takes longer but not a great amount longer, and the material cost savings largely outweighs the cost of paying installers for the extra time. Saving money and materials and getting the job done on time will always make the boss happy. Pulling the shorter cable pull is the best solution to this problem. Conclusion