Power Supply & Electrical Engineering for sustainable science

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
EMMA Upgrade: Slow Acceleration with Low-Frequency Cavity J. Scott Berg Brookhaven National Laboratory 12 March 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Injection System with a Booster in Separate Tunnel T. Shaftan for the NSLS-II team.
Magnets for the ESRF upgrade phase II
Magnet designs for the ESRF-SR2
FFAG Workshopfermilab April 2005 f Summary: FFAG WORKSHOP nonscaling electron model muon FFAGs C. Johnstone Fermilab.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Yichao Jing 11/11/2010. Outline Introduction Linear lattice design and basic parameters Combined function magnets study and feasibility Nonlinear dynamics.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
Mar 19, 2008 S. Kahn -- RF in HCC Channel 1 Examination of How to Put RF into the HCC Steve Kahn NFMCC Meeting Mar 19, 2008.
Drive beam magnets powering strategy Serge Pittet, Daniel Siemaszko CERN, Electronic Power Converter Group (TE-EPC) OUTLINE : Suggestion of.
Options for Final Focusing Quadrupoles Michele Modena CERN TE-MSC Many thanks for the contributions of: J. Garcia Perez, H. Gerwig, C. Lopez, C. Petrone,
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Compact & Low Consumption Magnet Design Workshop for Future Linear and Circular Colliders Geneva, November 26-28, 2014 Saving opportunities in accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Permanent magnet wiggler based on NdFeB material. This wiggler type uses the same design principles as the wigglers which have been developed for PETRA.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
ESRF PSG safety for equipment and personal related to power converters 2 nd POCPA 15th of June 2010 Jean-François Bouteille.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Y. R. Roblin Hall A beamline and accelerator status.
Emittances Normalised r.m.s. Emittances at Damping Ring Extraction Horizontal Emittance (  m) Vertical Emittance (  m)
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Booster Corrector Review, Oct. 10 th, 2006 E. Prebys Introduction/Specifications Eric Prebys Proton Plan Manager.
Pulsed Magnet Power Supply Feasibility Study
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
1 DR 10 Hz Repetition Rate S. Guiducci (LNF) AD&I webex, 23 June 2010.
Report Technical Director Storage-Ring-Installation Completed
ILC Power and Cooling VM Workshop
Long Term Plans at MAX IV
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Some Design Considerations and R &D of CEPCB Dipole Magnet
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
Warm magnets for LHeC / Test Facility arcs
Bocheng Jiang SSRF AP group
Innovative He cycle Francois Millet.
with operating voltage
Low Emittance Rings 2014 Workshop
NC Accelerator Structures
Physics design on Injector-1 RFQ
Arc magnet designs Attilio Milanese 13 Oct. 2016
DR Magnets & Power Supply System ILC-ADI Meeting March 14, 2012
Magnets for the ESRF upgrade phase II
Main magnets for PERLE Test Facility
Compact and Low Consumption Magnet Design The DESY Experience
Mechanical system of CEPC
FFAG Accelerator Proton Driver for Neutrino Factory
Electron sources for FCC-ee
Negative Momentum Compaction lattice options for PS2
PEPX-type BAPS Lattice Design and Beam Dynamics Optimization
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Negative Momentum Compaction lattice options for PS2
Electron Collider Ring Magnets Preliminary Summary
JLEIC Main Parameters with Strong Electron Cooling
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Power Supply & Electrical Engineering for sustainable science Boosting accelerator electrical efficiency at the ESRF Geneva, October 23th, 24th & 25th 2013 Power Supply & Electrical Engineering for sustainable science   Jean-François Bouteille  On behalf of the ESRF Accelerator Program Phase II Team

Global cost computation Power Supply & Electrical Engineering ->Electrical supply engineering Organisation: J-F Bouteille Power Quality and magnets power procurement Joel Chavanne Magnet group head Y Gouez Electrical infrastructure and consumption Gael Le Bec Magnet group deputy Jean-François Bouteille – Power Supply Group Head

Work Package 1.4 of the Technical Design Study Goal of the package: Prepare the cost and the procurement planning of the power supplies. Evaluate the matching of each PS+Magnet pairs. Review of the cabling and cooling constraints of each of the PS+Magnet pairs. AC and DC wise they will be touched on as a global evaluation. Compatibility with the existing energy infrastructure; What needs to be adapted, in which direction and prepare the consequences of running costs. Compare many solutions with a global cost computation over 15 years including electrical energy cost increase. Jean-François Bouteille – Power Supply Group Head

Comparison dipole magnet technologies Present situation: Power per magnet = 10kW used for 160 000h Procurement cost of 64 magnets : 1.5 M€ in 1990, Running cost for 64 magnets : 5 M€ since 1992 Electrical for the magnet current : Joule losses. Electrical for auxiliaries: PS + AC 50Hz transport and distribution Electrical for cooling needs: water and air 5 year power and energy cost tendency 3 main parts: energy, transport, taxes: €/MWh, €/MW, VAT+additional taxes. Announcement of 30% global increase for the 5 years to come. General tendency of 3% per year over 15 years seems very optimistic. Jean-François Bouteille – Power Supply Group Head

New lattice with 7 dipoles Old lattice with 2 dipoles Jean-François Bouteille – Power Supply Group Head

New lattice magnetic field profile The profile of the magnetic field is decreasing along the path of the electrons. The gap of the dipole is adjusted to the vacuum chamber height in order to minimize the magnetic volume. The number of coil turns is chosen to approach the ideal curve. The power to perform 4 / 7 of the dipole function is 2.6kW leading to a total of 336kW! The 3 other combined function dipole-quadrupole electromagnets are forecasted to 4.5kW/cell => 144kW Jean-François Bouteille – Power Supply Group Head

Longitudinal Gradient Dipole electromagnet Jean-François Bouteille – Power Supply Group Head

Pole extensions To avoid the loss of efficiency coil extremities: pole extensions to be engineered. Jean-François Bouteille – Power Supply Group Head

Comparison dipole magnet technologies Hybrid dipole magnet mixed with Permanent Magnets Needs temperature and lattice correction coils Cost of the correction function imposed by the technology and the alignment Air cooled coils is today the best approach Global cost over 15 years of the correction function Discussion on the added value of the correction function in electromagnet design, Family connection compared to individual connection. Jean-François Bouteille – Power Supply Group Head

Dipole with longitudinal gradient Iron yoke Sm2Co17 Magnet Magnetic design view Vertical field along beam path G. Le Bec et al. -- Low Emittance Rings workshop, Oxford, 2013

Fair comparison of two technologies we foresee Electromagnet Permanent magnet Global length= 2.16m Pole extension and coils: engineering difficulties. Tunability: one power supply no local correction accessible Power = 2.6kW Energy for 15 years : 330MWh -> 28k€ per magnet! Safety: No risk when powered off Global length= 2.08m Pole extension: assembled before end. Mechanical forces to be mastered. Tunability: correction for temperature drift within +/- 3% of the field Power = few watts only. Energy for 15 years : less than 1MWh. Safety: Magnetic forces always present! e- Arrangement of PM dipole modules (top view) Electromagnet dipole modules (front view) Jean-François Bouteille – Power Supply Group Head

Comparison electro-magnet and permanent magnet The limited aperture of the pole gives severe constraints on the coils and pole designs. The total length is affected such that the crosstalk with neighbor magnets is yet not solved. The permanent magnet is not only cost effective but also able to be more compact The tunability of each step is accessible without any major constraints or changes. Jean-François Bouteille – Power Supply Group Head

Present power footprint of the storage ring The power to run the storage ring depends on the modes: Multibunch uniform : 5.7MW->5.4MW for 200mA -> 161mA 7/8 + 1 filling : 5.3MW->5.0MW for 200mA -> 164mA 90 mA 16 bunches : 4.5MW -> 4.3MW for 91mA -> 59mA 40 mA 4 bunches : 4.22MW -> 4.14MW for 43mA -> 31mA Most of the power variation is driven by the RF part The electromagnet part is measured to : 1.86MW The tech. gallery and General UTility for the accelerator is 0.92MW The RF part is therefore the complement : This varies from 2.92MW to 1.36MW Jean-François Bouteille – Power Supply Group Head

New low emittance lattice ring power footprint The lattice magnet part is foreseen to be 1.25MW instead of 1.86MW -> 33% reduction The RF reduces losses per turn from 5.4 to about 3.6 MeV/turn -> 30% reduction at least : function of the cavities impedances. Cooling needs for the accelerator will be reduced by 30% which represents half of the general utility 0.92MW: -> 0.78MW The SR will therefore have a power demand of 4.1MW instead of the 5.7MW for uniform 200mA which represents a 28% reduction of peak power demand. The injector in topup mode will also benefit from 4 cavities in the booster and optimized ramping power supplies: Reduction of the SYRF power demand by nearly 50%; wall plug energy increase due to the topup repetition rate. Booster Magnet power demand will be similar, energy to be discussed depending on the MDT yearly multicycle demand. Jean-François Bouteille – Power Supply Group Head

Conclusion The new lattice proposed is a big opportunity to think on a better efficiency of the accelerator complex. By enlarging the dipole length from 4m to 11m the emittance will decrease and consequently the RF losses. This is also the global cost computation over the estimated life time of the instrument which is guiding the technology which has to be used for a sustainable engineering. Many magnets will benefit from this computation Even if the electromagnetic solution would be chosen, the actual 640kW for the dipole electric function will be reduced to 480kW, many other facilities have power needs much above this value for lower electron energy! Jean-François Bouteille – Power Supply Group Head

Many thanks for your attention Jean-François Bouteille – Power Supply Group Head