LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.

Slides:



Advertisements
Similar presentations
Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
Advertisements

All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
Slim crab cavity development Luca Ficcadenti, Joachim Tuckmantel CERN – Geneva LHC-CC11, 5th LHC Crab Cavity Workshop.
LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Ofelia Capatina on behalf of the CERN specification team
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
ESS cavities interfaces
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
KEKB Crab Development K. Hosoyama (KEK) Crab Cavity for HER Crab Cavity for LER Crab Cavity for KEKB History of Crab Cavity R&D Characteristics of Crab.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
KEK R&D for LHC Plan of 800MHz Cavity Calculation of 400MHz Cavity 16 th September 2009, LHC-CC09 at CERN K.Nakanishi.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
LHC-CC09, 3rd LHC Crab Cavity Workshop CERN, September, 16-18, 2009 Cryostat & Tuner Compatibility* V. Yakovlev, in behalf of the team: O. Brunner, E.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
SLHC WG3 (Cryomodule) summary & plan with recommendation to the CB V.Parma, CERN TE-MSC P. DUTHIL, IN2P3-CNRS 3rd SPL collaboration meeting, CERN
The integration of 420 m detectors into the LHC
A Four Rod Compact Crab Cavity for LHC Dr G Burt Lancaster University / Cockcroft Institute.
UK-Jlab-TechX Designs for the LHC Crab Cavity Dr G Burt Lancaster University / Cockcroft Institute.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
RF Modeling of the LHC Crab Cavity Zenghai Li SLAC Zenghai Li LARP CM20 April 8-10, 2013.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
LHC Crab Cryostat Integration and Planning Meeting – some outcomes
Cryomdoule Test Stand.
S1G Experiment Schedule Plan
TDR guideline discussion on Cavity Integration
CERN – Zanon discussions
WP5 Elliptical cavities
Meeting for S1-Global module design Cryomodule and Cryogenics
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
A beam splitter for the Project X LHC Crab Cavity Meeting 11/15/2011
LHC Crab Cavity Conceptual Design at SLAC
Design Fabrication and Processing Group H. Padamsee
CERN Cryomodule Requirements for Crab Cavities
UK RFD Pre-Series cryomodule
SNS PPU Cryomodule Instrumentation
Cryomodules Challenges for PERLE
SPS-DQW HOM Measurements
CEPC-650MHz Cavity Cryomodule
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
ERL Director’s Review Main Linac
SNS PPU Cryomodule Instrumentation
HWR and Test Cryomodule for China ADS
Presentation transcript:

LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008

Agenda Possible CC design for phase I Cryostat location Using LHC 400 MHz cavity cryostat –problems? SBIR phase-I proposal for CC cryostat Helium Temperature 2K vs. 4K LHC requirement for cryostat/cavity

Coupler design constrains All couplers are mounted in Horizontal plane (FPC and HOM coupler) or Vertical plane (SOM, LOM) Only one horizontal direction is available for couplers (other is occupied by second beam). It fixes the beam line for CC For ILC-like HOM coupler with side power extraction coaxial line there is no room in cryostat. Need straight line coaxial design like in LHC 400 MHz cavity HOM coupler. Need LHe cooling for all couplers Power coupler : –Power ~ 50kW CW, available from IOT –No needs for tunable design (small beam loading)

LHC standard beam-beam distance: 20 cm around P4: special 42 cm (for main RF!), not easy (dog-leg) - Transverse Space: 800 MHz | * OK (*) 800 MHz will NOT do for the real thing:too crooked bunches

LHC IP4 location (RF) CC location CC location (second beam)

Global Option Location: P4 at (staged) ACN location

Tunnel cross-section Coupler position limitations FPC & HOM ??? FPC & HOM Do we have room available for couplers from the wall side?

CM Layout (400 MHz cavity) 1496 mm 1130 mm

Sub-unit for one 400 MHz cavity Side view Top view WG Variable input coupler Narrow band HOM coupler Broad band HOM coupler Needs 2 cavities (2 units) Port locations are different

Flange ports Cover plates Easy access for cavity assembly inside cryostat Cryostat frame

Helium circuit in one cavity Gas collector (box) He heater & He level Liquid He Inlet or Gas He Outlet ??? Emergency outlet Coupler Gas He cooling

Problems with using of LHC cryostat Port locations not fit present CC design Cryogenic ports not fit as well (?) 2K option is not possible (shielding, cryosystem). Need redesign: support system, alignment, tuner (hopefully partial), … Needs at least 2 sub-units and 2 end-cups  not available. New order is costly  cryostat has complex design and expensive in production. New design probably is more preferable option –SBIR phase-I proposal with AES is under preparation

New design constrains Most constrains are defined by CERN requirements and safety regulations (see talk of J. Tückmantel “LHC Integration of a Crab Cavity” an CC mini workshop, CERN, Aug. 21,2008) –CERN Standards –Compatibility –Safety, –Materials for CM and components –Cryogenic and protection from accidents –Vacuum, bake-out, –Radiation –RF components, cables etc. –Alignment –Transportation –Other

Questions: Operating temperature: 2  K versus 4  K. 4  K problems: Neither magnetic shield no a heat shield are necessary ! - higher losses in the cavity; - Microphonics from bubles - lower gradient ?  higher number of cavities? Need to be investigated – cavity design, available place for them. 2  K problems: - high pressure; - possible cavity deformation in the case of an accident. Need to be investigated – robust cavity design, helium input, fast valves, etc.

SNS experience (805 MHz, pulse regime)

2. Available components? -coaxial lines for the (1-10) kW monopole mode extraction; -Coaxial lines for other couplers ? -Cables and loads for LOMs/HOMs -Frequency tuner. 3. Environment limitations: - position of the dampers and input coupler (vertical, above the cavity, below the cavity; horizontal?) - limitation for longitudinal position of the couplers.

Cavity Mechanical Tuner Stepping motor Thermal Shielding (super isolation only) 800 MHz Crab cavity needs Tuner design. Can we adopt an existing design for CC? Is it available from CERN, including control system ?

End Cups Super isolation Flanges for beam pipe (in horizontal plane)

Cavity Support / Alignment Top View Side View Horizontal Vertical Longitudinal

FNAL CRAB CAVITY WITH QUARTEWAVE COUPLERS (alternative compact design) LOM Couplers HOM and FP Couplers Notch-filter for 800 MHz

2D optimization L gap a b R cavity R ap A B FIXED: R cavity =175mm R ap =60mm a, b, A, B, L gap are optimized. H s /H eff L gap, mm

V * ┴, MV 2.5 Bpeak, mT 77.4 Epeak MV/m 31.7 R ┴ /Q, Ohms 52.5 * V ┴ = Δp ┴ c/e a 50 b 60 A 50 B 45 L gap 125 D1/D2 147/175 Dimensions (in mm) and main parameters of FNAL Crab cavity D1 D2 F, MHzQR/Q, Ohm RESULTS OF FIRST 3D OPTIMIZATION Monopole modes P<2kW P=2.5 kW