Current study status of high gradient at KEK Fumio Furuta KEK SCRF meeting Fermilab. Apr. 21-25 2008.

Slides:



Advertisements
Similar presentations
6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
Advertisements

KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Stain appeared after EP acid renewal Field emission at low gradient happened on MHI-06, MHI-07, in VT. Kyoto-camera found brown stain trace in beam pipes,
New Results on Field Emission Suppression in EP Multi-Cell Cavities at JLab Rong-Li Geng Jefferson Lab ILC10, March 26-30, 2010, Beijing, China.
Series Tests of High Gradient Single- cell Superconducting Cavity for the Establishment of KEK Recipe T. Saeki (1), F. Furuta (1), K. Saito (1), M. Ge.
1 - SCRF Technology for The 1 TeV Upgrade - Cavity Shape and Configuration Statement: Combine the LL high gradient cavity shape and the Superstructure,
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
Surface study at KEK 1) sponge cleaning 2) special single-cell cavity with de-toutchable Nb-samples T. Saeki on behalf of Jlab-FNAL-KEK S0 study collaboration.
Cavity Gradient Yield Plots Update, August, 2009 As reported by Akira Yamamoto to the EC and the ILCSC August, 13, 2009 On behalf of the ILC Cavity Global.
New HOM coupler design Demountable Damped Cavity (DDC) Sokendai, The graduated university for advanced studies. KEK, LL / Ichiro Cavity Group October 21,
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Field emission issue and strategy to improve H. Hayano.
Experimental Comparison at KEK of High Gradient Performance of Different Single Cell Superconducting Cavity Designs. F. Furuta, K. Saito, T. Saeki, H.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
High Q R&D at JLab G. Ciovati, P. Dhakal, R. Geng, P. Kneisel, G. Myneni TTC Topical Meeting on CW SRF Cornell Univ., June 12 th -14 th, 2013.
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
Sample tests for stain problem at KEK LCWA2009 at Albuquerque 01 Oct T. Saeki 1.
KEK Status Report Kirk 04/Mar/20151LCC 5th SCRF Meeting.
Update on S0, S1 for ILC R&D H. Padamsee, Cornell For the S0/S1 Task Force.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Rongli Geng March 4, th LCC ILC Cavity Group Meeting
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
F Fermilab ANL/FNAL SCPF EP/HPR Processing Status and Plan Allan Rowe TD/SRFDD.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
Standard EP recipe at KEK T. Saeki KEK Hot topics session SRF – 29 July 2011, Chicago.
Hydroformed Multi-Cell Cavities. Update Waldemar Singer, DESY Peter Kneisel, JLab.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
CEA DSM Irfu 16/05/2008- F. Eozénou, T. Saeki - FJPPL 2009 A_RD_051 A RD 05: SURFACE PREPARATION STUDIES FOR SUPERCONDUCTIVE CAVITIES F. Eozénou, T. Saeki.
Summary of STF-EP facility at KEK.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Cornell Updates Commissioning of T-map for ILC single cell starts.
Strategy and Status of Reference Cavities for European XFEL
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
Rongli Geng Jefferson Lab & GDE
for the FNAL/ANL, JLab, and Cornell cavity teams
Surface Analysis of the Quench Area Sample of Cavity Z111
S0 Status report from KEK
European-XFEL summary: Cavities/Modules performance
Production Cavities in progress
A COMMON R&D ON THE HIGH GRADIENT Nb CAVITIES
Recent VT Results in the STF-2 cavities
Quality control study with single-cell cavities
TTC topical-meeting on CW SRF 2013
ON THE HIGH GRADIENT Nb CAVITIES
LCLS-II HE R&D ongoing results
Cavity & Cavity Integration; recent KEK activities
Presentation transcript:

Current study status of high gradient at KEK Fumio Furuta KEK SCRF meeting Fermilab. Apr

ACD target ACD: Ave. Eacc=46.7±1.9MV/m Single cell cavity status (ICHIRO center cell shape) Recipe : CBP(100um)+CP(10um)+EP(80um) +EP(20  m)+flash EP(3  m) +HPR+Baking Narrow scattering, high performance. MP process needed. How to eliminate MP? Strengthen rinsing after EP.

ICHIRO 9-cell cavity status 9cell-#1~#3 9cell-#0 (w/o HOM) MP barrier at taper of BP FE caused by end group Large beam tube, complicated structure of end group Contamination from HPR pump by long operation. Key points Re-design of ICHIRO and end-single cell study Replacement of HPR pump: plunger->diaphragm

Field Emission by Plunger HPR Pump contamination Final filter -before use- Contaminated Silicon grease used at plunger sealing of HPR pump! HPR pump was replaced to diaphragm type on beginning of Sep Successfully Qualified by single cell cavity tests! Fixed!

42MV/m 45MV/m ISE#2 (old) ISE#3 (new) ISE#4 (new) ISE#5 (old end group) Full HOM Just HOM cylinder 50MV/m 52MV/m Ethanol Rinsing End-single cell cavities End-cell shape has no problem. Ethanol rinse has big effects on end groups.

ISE#5 tight loop test EP(20  m)+flash EP(3  m) +Ethanol rinsing (10min., r.t.) +Degreasing(MICRO-90, 2%, 1hr, 50C) +HPR(Nomura, UPW) +Baking(120C*48hrs) Eacc[MV/m]Qo 3 rd e9 4 th e9 5 th e9 12 th e9 Repeat ISE#5 Full HOM

9-cell = + x7 + = 50MV/m? Center-cellend-cell Old New Redesigned 9-cell cavity : New Ichiro 9-cell Ready to EP, VT I9#5→sent to J-lab (EP+VT)*3. #5, #6 :w/o end groups #7, #8 :w/ end groups

+EP(20  m) + Degreasing + HPR +EP(20  m) + flash EP(3  m) + Degreasing + Ethanol rinsing + HPR +EP(20  m) + Ethanol rinsing + HPR will be tested Studies for strengthen rinsing by single cell cavities +EP(20  m) + flash EP(3  m) + HPR High reliability, but still MP process needed. Well work for reduction of MP. Well work for end group rinsing. Need more statistics. (A) (B) (C) (D) 46.7±1.9MV/m (N=6) 44.2±6.4MV/m (N=5)

Summary ・ Surface treatment recipe for single cell (center cell shape) was almost fixed. Degreasing has effect on reduction of MP. ・ Limitations of ICHIRO 9-cell (#0,1,2 and 3) cavities were related to end group and contamination from plunger HPR pump. ・ Plunger pump was replaced to diaphragm pump, it works well. ・ End-cell shape single cell cavities were fabricated and tested to understand the end groups. ・ Ethanol rinsing have effect on end group rinsing. End cell cavity with full end group reached 45MV/m. For the end single cell cavities, more statistics will be collected. ・ 4 re-designed ICHIRO 9-cell (#5, 6, 7, and 8) were fabricated. #5 and #6 have simple beam tube, #5 was tested and reached 36MV/m at J-lab. #7 and #8 have full end group, will be tested next month at KEK.