A Broad Review of August 13, 2015 and Similar Historical Situations Luminant Energy January 22, 2016.

Slides:



Advertisements
Similar presentations
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
DSWG Update to WMS May 17, DSWG Goals Update.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
ORDC Phase 2 Analysis Summary Wholesale Market Subcommittee March 4, 2015 David Thompson.
Ancillary Services Methodology Changes for 2015 Sandip Sharma Bill Blevins Dan Woodfin.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
March 30, 2015 SCED Event Follow up: Proposed Improvements QMWG, May 08, 2015.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
NPRR 097 DSR and Small Capacity / Low Operating Level Issues for Compliance Monitoring.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC November 4 th, 2010.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
RATF Report to WMS Report of RATF meeting held March 3, 2014.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
Long-Term Solution for Negative Generation Entergy Transmission AFC Stakeholder Meeting August 22, 2006.
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
2% Shift Factor rule and associated price discrepancies Kris Dixit 1.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
ORDC Options Analysis SAWG Market Analysis 12/16/2015.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
Responsive Reserve Service Deliverability Review September 15,
2014 & 2015 Unannounced Unit Testing Summary ERCOT ROS February 4 th, 2016.
QMWG February 7, 2011 January 2011 GREDP Performance Summary.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
Joint PLWG/CMWG Assignment Update to ROS September 15, 2011.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
Analysis for the Determination of X, Y, and Z for Compliance Monitoring NATF.
Next Steps on Reserve Discount Factor and 2016 Ancillary Service Methodology ERCOT Staff Date 02/25/2016.
QSE Managers Working Group Report to WMS September 19, 2007.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version
1 EEA Workshop 3 April 2, /3/2015For the purpose of discussion only.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Current FRRS Language & Explanation of Posted Data
RTDF Overview of Data Analysis & Status of “Consesus Items”
Presentation transcript:

A Broad Review of August 13, 2015 and Similar Historical Situations Luminant Energy January 22, 2016

1 Issues Identified By ERCOT  According to ERCOT’s 10/29/15 Presentation to TAC (slide 3, bullet 5), which analyzed the operating day of 8/13/15:  “As we approach scarcity PRC will be around 2,500 and ORDC will gradually approach PRC as prices increase causing QSGRs to come online, resources to put their duct firing online and SCED to move resources to the top making the remaining capacity within 20% HSL. However, since minimum RRS level is 2,300 MW there could be situations where PRC stays just above 2,300 MW for a long time and could drop below 2,300 when we still have lot of quick starts physically offline but available to SCED.”  The minimum PRC that ERCOT observed that day was 2,371 MW at (~15:05) and at that time RTOLCAP was at 3,629 MW and SCED UP was 1,293 MW.  This is the lowest level PRC has reached since ORDC Go Live (6/1/14 – present).  The difference between RTOLCAP and PRC was 1,258 MW and if all of the QSGRs had been online at HSL, then the difference would still have been ~262 MW.  Since the remaining (non-QSGR) available capacity of ~262 MW is materially higher than the ~71 MW delta between PRC and the 2,300 MW EEA 1 Threshold, there are other factors contributing to the divergence of PRC and ORDC that need to be analyzed.

2 Issues Identified By ERCOT (cont.)  According to ERCOT’s 1/22/16 Presentation to QMWG (slide 2, bullets 3 - 5), which analyzed the operating day of 8/13/15:  “Sum of Reg and RRS was about 2,650 MW and these reserves were not released to SCED.”  “A large contribution to the difference between the reserves that we procured (2,650 MW) and the measured PRC (2,371 MW) was due to use of RDF of 0.98.”  “Using an RDF of 0.98 during the peak intervals reduced the measured PRC by more than 400 MW compared to using an RDF = 1 (no discount).”  Luminant Energy agrees with ERCOT’s assessment that the RDF is one of the primary reasons that PRC approaches the 2,300 MW EEA 1 Threshold while un-deployed capacity remains in SCED, but it is most impactful when only 2,300 MW of RRS has been purchased.

Analysis performed by Luminant 3  To better understand the underlying causes and potential solution to the issues that ERCOT identified, Luminant reviewed historical periods where PRC was within 100 MW of the EEA 1 Threshold.  The following slides review three separate time periods:  4/1/11 – 6/30/11 (prior to Luminant offering QSGRs in SCED, RRS minimum requirement of 2,300 MW)  7/1/11 – 3/31/12 (Luminant offering ~1,000 MW of QSGRs in SCED, RRS minimum requirement of 2,300 MW  4/1/12 – 5/31/15 (Luminant offering ~1,000 MW of QSGRs in SCED, RRS minimum requirement of 2,800 MW.)  The following line plots show that the exact issue that we experienced on 8/13/15 (where PRC approached EEA 1 Threshold while SCED still had un-deployed capacity) happened routinely with similar levels of un-deployed capacity during the 12 months when only 2,300 MW of RRS was purchased.  However, during the 38 month period from Apr 2012 – May 2015, when 2,800 MW of RRS was purchased, the issue was nearly non-existent.  Thus, Luminant concludes that the RDF applied to PRC combined with the purchase of less RRS is the principal driver of the issue that ERCOT identified on August 13, 2015.

4 Review of Historical Data Where RRS = 2,300 MW The line plot above attempts to capture steady state, pre-EEA conditions, where there are no known deployments of Gen RRS or LRS During this three month period at the beginning of TX Nodal, prior to Luminant Energy offering any QSGRs into SCED, there is a tight cluster of SCED Up volumes in the range of -50 to 450 MW that could not have been impacted by LUME QSGRs in SCED

5 Review of Historical Data Where RRS = 2,300 MW During this nine month period after Luminant Energy began offering QSGRs to SCED, there is a similar tight cluster of SCED Up volumes in the range of -200 to 450 MW (i.e., QSGRs don’t seem to make a obvious difference in this issue). The line plot above attempts to capture steady state, pre-EEA conditions, where there are no known deployments of Gen RRS or LRS

6 Review of Historical Data Where RRS = 2,800 MW During this 38 month period while Luminant Energy was offering QSGRs to SCED and the RRS floor was 2,800 MW. The only data points are from the 5 minute period following a recall of generation RRS on 7/30/2012. The line plot above attempts to capture steady state, pre-EEA conditions, where there are no known deployments of Gen RRS or LRS

Observations and Conclusions 7  ERCOT’s Proposed Solution (1/22/16 Presentation, slide 3, bullets 1 & 2)  “Reduce RDF. The analysis and extent of reduction in RDF percentages will be presented at the February ROS meeting.”  RDF should be based on what is needed to reliably operate the system. If ERCOT and stakeholders are comfortable reducing RDF based on ROS’s review of the data, Luminant will support that option.  “Increase RRS requirements to reflect the reduction in real-time that is the result of the application of the RDF.”  Independent of this analysis, Luminant agrees that the minimum RRS requirement should be increased, and is a co-sponsor of NOGRR152, which would increase the minimum RRS requirement to 2,750 MW.  Although NOGRR152 is based on reliability, a co-benefit of increasing the RRS requirement is that it will virtually eliminate the instances when PRC approaches the EEA 1 Threshold while available capacity is un-deployed.

Observations and Conclusions (cont.) 8  ERCOT’s Proposed Solution (1/22/16 Presentation slide 3, bullet 3)  “Update , General Capacity Testing Requirements, to consider QSGR as failed to start if it doesn’t come online in 10 minutes after a single interval commitment if PRC is at or below 2,500 MW.”  Luminant has concerns that this recommendation would skew price formation by committing resources that are not needed.  For example, on 8/13/15, Luminant received the following QSGR deployments:  At IE 15:00, Luminant Energy received no QSGR deployments  At IE 15:04 (short cycle of SCED), Luminant Energy received 73.2 MW of QSGR deployments  At IE 15:05, Luminant Energy received 26.3 MW of QSGR deployments  At IE 15:10, Luminant Energy received no QSGR deployments  At IE 15:50, Luminant Energy received no QSGR deployments  At IE 15:55, Luminant Energy received 46.7 MW of QSGR deployments  At IE 16:00, Luminant Energy received no QSGR deployments  If Luminant had followed ERCOT’s suggestion to come online after a single interval commitment, there would have been 120 MW of capacity (LSL) online that was not needed.