© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
© ERCOT Fleet Cost Summary 2
© ERCOT Fleet MWh Summary 3
© ERCOT Fleet MWh Summary 4
© ERCOT Location of Deployment 5
© ERCOT Percent Fleet Deployment by Location 6
© ERCOT Plant Deployment and Settlements 7
© ERCOT Plant Cost Summary 8
© ERCOT Plant Summary 9
© ERCOT Fleet Deployment Settlement Process 10
© ERCOT What are Fleet Instructions? QSE decrease generation in the North Zone by 100 MW for interval ending 9:15. QSE increase generation in the Houston Zone by 100 MW for interval ending 9:15. Increase/Decrease Generation ERCOT-Wide by 100 MW Have output of plant 1 at or below 450 MW. [This is not a fleet instruction.] 11
© ERCOT High Level ---What is being done by the ERCOT Settlements Group ? Create ZIDUPADJ’S and ZIDDNADJ’s to reflect the Fleet Instruction to ensure URC is calculated correctly. [Done before the Initial is run.] Determine if the QSE followed the “Fleet Instruction”. Identify which type of units were moved in order to follow the Fleet Instruction. (assume economic dispatch.) Create and import unit fuel type payments* (premium) to the QSE for following “fleet instruction”. * QSEs received Balancing Energy Payments via the Resource Imbalance 12
© ERCOT Additional Fleet Settlement Information For more detail information on the Fleet Settlement process, please review the “ERCOT Fleet Settlement Procedures” located at: 13
© ERCOT QUESTIONS, DISCUSSION