WALIS Cadastre Strategic Directions Workshop Matt Devlin Kerry Smyth Matt Devlin.

Slides:



Advertisements
Similar presentations
Vikram krishnamurthy director of land conservation eastern shore land conservancy 19 may 2009.
Advertisements

SLIP Natural Resource Management Damian Shepherd SLIP NRM Program Manager, Department of Agriculture and Food June 2008.
Maps and Aerial Photos There are many different kinds of maps Geopolitical Topographic Shaded Relief, Photorectified or Standard Geologic Ecosystemic Meteorological.
Whassup DAFWA? Spatial data in the Department of Agriculture and Food WA February 2010.
Topographic mapping in Fiji: Challenges and opportunities Conway Pene 2012 Pacific GIS&RS Conference November 2012, Suva.
Water Corporation take on Referential Topology WALIS Referential Topology Workshop April 09 Presenter: David Bulfield.
PSMA Australia Presentation National DCDB Workshop July 2010 Michael Dixon Group Manager, Products & Services PSMA Australia.
ESRM 250 & CFR 520: Introduction to GIS © Phil Hurvitz, KEEP THIS TEXT BOX this slide includes some ESRI fonts. when you save this presentation,
Referential Topology Workshop Department of Planning - Update 8 th July 2009.
Annual World Bank Conference on Land and Poverty – 2014 Integrating Land Governance into the Post Agenda Managing Mapping and Survey Records in a.
Managing a Cadastral SDI Framework Built from Boundary Data Michael Elfick Michael Elfick Tim Hodson Tim Hodson Curt Wilkinson Curt Wilkinson.
DATA AVAILABLE FROM THE DEPARTMENT OF LAND INFORMATION DATA FROM THE DEPARTMENT OF LAND INFOMATION.
October 2007GIS and Census Mapping in St. Lucia GIS AND CENSUS MAPPING IN ST. LUCIA Presented by Sherma Lawrence Central Statistical Office, St. Lucia.
Regional Geographic Information System to Support Water Planning in the Paso del Norte Region Bobby Creel, Project Manager, NMWRRI –
ArcGIS 3D Analyst: Working with 3D Analyst and CityEngine
Intro. To GIS Lecture 4 Data: data storage, creation & editing
Esri UC2013. Technical Workshop.Editing & Maintaining Parcels with ArcGIS.
Esri UC 2014 | Technical Workshop | Parcel Editing: Advanced Tim Hodson Jason Camerano.
3D Cadastre – Dream or Reality?
Rimantas Ramanauskas Kazys Maksvytis Alvydas Janulevičius State Enterprise Centre of Registers INTEGRATED PROCESSING OF DIGITAL CADASTRAL DATA IN LITHUANIA.
©2005 Austin Troy. All rights reserved Lecture 3: Introduction to GIS Understanding Spatial Data Structures by Austin Troy, Leslie Morrissey, & Ernie Buford,
GIS Maintenance & Tips Jennifer Kuchar. Maintenance is often the bottleneck of the entire GIS Enterprise Parcel Data AssessorRecorderAuditorSurveyor Planning.
Gwinnett GIS Community Partnership. Outline of Presentation Background Statement of Purpose Participants & Geography Topics of Discussion Benefits (from.
Introduction to ArcGIS for Environmental Sciences Day 2 – Fundamentals Module 8 Creating & Editing Data Creating Metadata.
March 14, 2007 First Steps For Starting Your Parcel Database: Aurora Case Study Indiana GIS Conference Dearborn County GIS Ileana Abot.
WA LOCAL GOVERNMENT GIS FOCUS GROUP Referential Topology - the Local Government perspective.
Parcel Data Models for the Geodatabase
Legal Boundaries A major role of a surveyor is the establishment of property boundaries This is often referred to as CADASTRAL SURVEYING.
Attribute Data in GIS Data in GIS are stored as features AND tabular info Tabular information can be associated with features OR Tabular data may NOT be.
Copyright 2010, The World Bank Group. All Rights Reserved. Integrating Agriculture into National Statistical Systems Section A 1.
SWE Strategic Plan and FY14 Operational Goals
GIS 1110 Designing Geodatabases. Representation Q. How will we model our real world data? A. Typically: Features Continuous Surfaces and Imagery Map Graphics.
Chapter 3 Sections 3.5 – 3.7. Vector Data Representation object-based “discrete objects”
Pennsylvania State University – GEOG 596A Linda M. Foster, MGIS Candidate Justine Blanford, Advisor July 2011.
Cost Effective GIS Implementation for Municipalities “Wisconsin Land Information Association Annual Conference – Applications Track” February 13, 2003.
Faculty of Applied Engineering and Urban Planning Civil Engineering Department Geographic Information Systems Vector and Raster Data Models Lecture 3 Week.
Geographic Information System GIS This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF GIS Geographic Inf o rmation.
Wimberley Market Days Progress Report Site Addressing and Management Analysis.
CONCOCTING A GIS Designing a Geodatabase Optimized for Data Maintenance and Map Production Jim Isbell | Engineering Tech. II | Kern County Assessor’s Office.
Page 1 Integrated Base Mapping Management at the City of Calgary Presented by : Leanne James ALS P.Eng. Supervisor of Cadastral Mapping, Land Information.
1 Integrated Services Program The Virginia Metadata Training Workshop Summer, 2006 Lyle Hornbaker Integrated Services Program
GIS Data Structures How do we represent the world in a GIS database?
CADASTRE STRATEGIC DIRECTIONS WORKSHOP AUGUST 16, 2012 Western Australian Land Information System Peter Ingwersen.
Kylie Armstrong Manager Business Programs Spatial Data Infrastructures - Leveraging Public/Private.
112 East Main Street Frankfort, Kentucky tel Fax
The Geographic Information System of the European Commission (GISCO) By Albrecht Wirthmann, GISCO, Eurostat ESPON.
Esri UC2013. Technical Workshop. Technical Workshop 2013 Esri International User Conference July 8–12, 2013 | San Diego, California Migrating Parcel data.
Migrating Data into the Parcel Fabric in ArcMap
DCDB National Workshop Sydney 2010 Geoscience Australia Utilising Digital Cadastre David Campbell National Geographic Information Group DCDB National Workshop.
When you begin a project, a reference data layer is placed on the map first. This initial layer(s) is called the base map. There are different types of.
Michael Gurley / John Murner Oregon Office of Emergency Management October 14, 2015 GIS DATA PREPARATION.
Queensland Digital Cadastral Dataset DCDB National Workshop Bill Gilder - Steve Tarbit.
NSW DCDB July 2010 BOB DAVIS, Team Leader DCDB Update BILL MILLER, Team Leader DCDB Upgrade.
ALLAN CAMPBELL HARRY OOSTERBAAN Spatial Cadastral Data Base (SCDB) Update.
The SCDB Landgate Western Australia Lou Teeuwissen Manager SCDB DCDB National Workshop Sydney
Presentation to the UN Experts Group Meeting UNSD 29 May - 1 June 2007 Alister Nairn Director - Geography Section GIS BASED CENSUS MAPPING APPROACHES -
Maintaining boundary relationships within spatial databases Lesley Arnold Landgate
Chris Wright 3 rd Feb 2010 PAIG Group Meeting. Objectives for today Understand 1Spatials credibility in the area To walk through the process that has.
Land Services Group The South Australia Story DCDB National Workshop Sydney 28 – 30 July 2010 Presented by Mauri Trinca.
Esri UC 2014 | Technical Workshop | Editing in ArcMap: An Introduction Lisa Stanners, Phil Sanchez.
3 Digital Terrain Model (DTM) products: Issues Enhanced DTM & 10m DTM are created as part of the orthophotography creation process New 50m DTM to be created.
BC Electronic Library Network ICIS at a Glance  Introduction to ICIS  Collection of ICIS Data  ICIS Feature Classes - Summary April 15, 2013 SharingDataCollaborationTrustRelationships.
© we-do-IT TM Emil Vulin. © we-do-IT TM Todays Topics The Problem: – Positional Accuracy & Cadastral Alignment The Solution:
OMB Circular A-16, Revised NSDI Data Themes Housing Jon Sperling HUD/Office of Policy Development & Research Housing: Department of Housing and Urban Development.
TASMANIAN JURISDICTIONAL UPDATE DCDB National Workshop28-30 July 2010 Andrew Tomes Manager - Spatial Data & Julian Gill Program Leader - Cadastral & Transport.
Esri UC 2014 | Technical Workshop | Migrating Data To The Parcel Fabric Christine Leslie Amir Bar-Maor.
A major role that is reserved to Surveyors is the establishment of property boundaries This is often referred to asCADASTRAL This is often referred to.
Migrating Data to the Parcel Fabric Solution
Emergency Service Boundaries (ESB) Program
Editing Parcels with the Local Government Information Model
Presentation transcript:

WALIS Cadastre Strategic Directions Workshop Matt Devlin Kerry Smyth Matt Devlin

What Do We Get? Cadastre Quarterly Updates Norm Files – Graphic (51 Order Areas) Norm Files – Tenure (3) State, Christmas Island, Cocos-Keeling Islands Shape File – Graphic (3) Lines, Point, Poly Lodged Layer (Weekly) (3) Lines, Point, Poly

What Do We Do? Cadastre Processing Create Graphic Titles (1157) (Arc Info Coverage) Create Layer (1) SDE Create Various Themes (13) (eg Ownership, UCL, Area Classifications, Easements) Create Tenure Tables (2) (Info – GIS Ownership, DOLA Reserves)

What Have We Done? Realignment to 28 May-2010 – Cadastre Corporate - 12x Datasets (1000) Layers - Maprite Local Planning Schemes – 150x Datasets (1500 layers) - Landgate Technique Provided to SLIP

What Are We Doing? Realignment to 30-June-2012 Cadastre – 1.4m Lines Determine Alignment Method - Maprite or Landgate Technique Revisit Previously Aligned Datasets – 162x Datasets (2500 Layers) Align Additional Datasets – 150x Datasets (500+ Layers)

Example: Post 2010 Realignment issue

Lessons Learned Each method of realignment still requires a substantial degree of editing Each method of realignment is performed over relevant sections, not State-wide Processing times and accuracy can vary Landgate and DoP have collaborated well in achieving results

Before After

BeforeAfter

Maintaining Alignment Options 1. Chasing Option DoP uses Maprite to intermittently determine shifts, realign and refresh its datasets OR Landgate provides regular change vectors so DoP can realign and refresh its datasets. 2. Landgate Split Dissemination Option Landgate provides daily (near real-time) content updates from a dissemination database without incremental positional adjustments AND. Landgate provides regular scheduled change vectors so everyone can realign and refresh its datasets at the same time. 3. Integrate Zoning into SCBD Option DoP Zoning is integrated into the SCDB; DoP has access and editing privileges or Landgate does this process for DoP. DoP’s unsurveyed delineators are absolutely defined (eg gps coordinated) rather than off-set defined from the cadastre) Continuous Realignment on the fly option (GD2 Solution)

Issues for Consideration 1. Data Management Issues Frequency and scheduling content of updates (ie new lots) Frequency and scheduling of positional accuracy adjustments (ie moving existing lots) Data structure models for analysis Our GIS Directions Program intends to maintain boundary linkage at the time of each data edit so once implemented there would be no need for periodic re-alignments. MRS/ unsurveyed boundaries to be defined by coordinated GPS rather than the current offset/ dimensions method.

Issues for Consideration 2. Data Access Licences Issues Degrees of access including via Landgate’s Mapviewer Legacy access to the tenure / property ownership Improved integration with the Valuation Datasets 3. Product Creation Inclusion in derived products Content (eg PSMA Cad lite, Land parcels greater than 1ha) various offerings available Positional accuracy in regional areas and aboriginal communities Positional accuracy in sync with aerial photography accuracy

Future Initiatives /Ideas Strata Lots 3D cadastre Underground and aerial above ground easements and cadastral boundaries Assignment of land-use in multi-story strata buildings Attributing land-use / zoning in the cadastre Integrated Planning /cadastral data so attribute of Land Parcel Aboriginal Community Land Parcels included in SCDB Easements

End of Presentation Thankyou