LCLS Energy Jitter Status in 2012 Franz-Josef Decker 24-Oct-2012 thanks to: J. Turner, R. Akre, J. Craft, A. Krasnykh, M. Nguyen, W. Colocho, … for helping.

Slides:



Advertisements
Similar presentations
TS01 Klystron Modulator Minh Nguyen May 20, 2014 Beam Voltage Stability Improvements.
Advertisements

BC System – Review Options ● BC2 working point (energy-charge-compr.) ● 2BC (rf-rf-bc-rf-bc-rf) ● table: 2BC (rf-rf-bc-rf-bc-rf) dogleg + 2BC (rf-dog-rf-rf-bc-rf-bc-rf)
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
P. Emma LCLS FAC 12 Oct Comments from LCLS FAC Meeting (April 2004): J. Roßbach:“How do you detect weak FEL power when the.
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
A. Zholents, July 28, 2004 Timing Controls Using Enhanced SASE Technique *) A. Zholents or *) towards absolute synchronization between “visible” pump and.
Juhao Wu Feedback & Oct. 12 – 13, 2004 Juhao Wu Stanford Linear Accelerator Center LCLS Longitudinal Feedback with CSR as Diagnostic.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
R. Akre XFEL Short Bunch Measurement and July 26, 2004 LCLS Drive Laser Timing Stability Measurements XFEL Short Bunch Measurement.
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
Comments from LCLS FAC Meeting (April 2004): J. Rößbach:“How do you detect weak FEL power when the gain is very low (few hundred)?” K. Robinson:“Can you.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project Near term opportunities for LCLS 'upgrades' J. Hastings for the LCLS Experimental.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
Linac 6575 Modulator PFN Charging Power Supply Upgrade Minh Nguyen December 5, 2012.
Simulation of IP beam size with orbit jitter + wakefield in EXT-FF ATF2 Project Meeting K.Kubo.
Latest Results on HXRSS at LCLS Franz-Josef Decker 4-Feb Seeding with 004, 220 and over-compression 2.Tuned beam with slotted foil cutting horns.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
Longitudinal transfer function a.k.a. (M 55 ) measurements at the JLab FEL Pavel Evtushenko, JLab  Jlab IR/UV upgrade longitudinal phase space evolution.
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
S2E in LCLS Linac M. Borland, Lyncean Technologies, P. Emma, C. Limborg, SLAC.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Henrik Loos LCLS 6 February 2009 SLAC National Accelerator Laboratory High Level Physics Applications for LCLS Commissioning.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Beam Dynamics and FEL Simulations for FLASH Igor Zagorodnov and Martin Dohlus Beam Dynamics Meeting, DESY.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Self-Seeding Procedure and Development Jim Turner.
P. Krejcik LINAC 2004 – Lübeck, August 16-20, 2004 LCLS - Accelerator System Overview Patrick Krejcik on behalf of the LCLS.
‘S2E’ Study of Linac for TESLA XFEL P. Emma SLAC  Tracking  Comparison to LCLS  Re-optimization  Tolerances  Jitter  CSR Effects.
1 EMCAL Reconstruction in Pass pp 900 GeV 29/03/2010 Gustavo Conesa Balbastre.
The Microbunching Instability in the LCLS-II Linac LCLS-II Planning Meeting October 23, 2013 A. Marinelli and Z. Huang.
Twin bunches at FACET-II Zhen Zhang, Zhirong Huang, Ago Marinelli … FACET-II accelerator physics workshop Oct. 12, 2015.
Lessons Learned From the First Operation of the LCLS for Users Presented by Josef Frisch For the LCLS March 14, 2010.
FEL Spectral Measurements at LCLS J. Welch FEL2011, Shanghai China, Aug. 25 THOB5.
Ultra-short electron bunches by Velocity Bunching as required for Plasma Wave Acceleration Alberto Bacci (Sparc Group, infn Milano) EAAC2013, 3-7 June,
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
Franz-Josef Decker 14-Dec-2011 CSR is a big deal limiting performance Tolerance studies beforehand helped a lot Tor’s List Software adaptability helped.
X-band Based FEL proposal
Microbunching Instability and Slice Energy Spread
A single-shot method for measuring fs bunches in linac-based FELs Z. Huang, K. Bane, Y. Ding, P. Emma.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
LSC/CSR Instability Introduction (origin of the instability) CSR/LSC
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
L1S Jitter with AIP Modulator
A Portion of the SCP RF Control System LCLS Related
Time-Resolved Images of Coherent Synchrotron Radiation Effects
Data Mining Ideas.
LCLS Longitudinal Feedback and Stability Requirements
LCLS RF Stability Requirements
Linac/BC1 Commissioning P
LCLS Tracking Studies CSR micro-bunching in compressors
High Level Physics Applications for LCLS Commissioning
Operational Experience with LCLS RF systems
Low Level RF Status Outline Overview showing hardware instances
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
LCLS Longitudinal Feedback System and Bunch Length Monitor Juhao Wu Stanford Linear Accelerator Center LCLS DOE Review, February 08, 2006 LCLS longitudinal.
Presentation transcript:

LCLS Energy Jitter Status in 2012 Franz-Josef Decker 24-Oct-2012 thanks to: J. Turner, R. Akre, J. Craft, A. Krasnykh, M. Nguyen, W. Colocho, … for helping to reduce jitter over the years

2 Outline LCLS Jitter Status in 2012 History of L1S jitter How does a high voltage change of L1S modulator propagate History of DL2 energy jitter (or different energies, peak currents) -Jitter is 120% (high E) to 250% (low E) of energy spread [0.04–0.12%] What is needed for seeding Different techniques to localize and quantify jitter

3 L1S phase jitter over the years 0.35 deg to 0.03 deg LCLS Jitter Status in 2012 Sample images HV=300kVBC1: E =250 MeV Un-SLEDed, HV=340kV ?

4 L1S Phase and Amplitude Calibration vs. High Voltage Phase -22 deg and Amplitude +145 MeV (BC1: E = 250 MeV) 5.0 deg / % voltage change 2.5 MeV / % voltage change [expected: 5.2 deg, 1.74 MeV (sqrt 2?)] 0.1%  0.5 deg, 0.25 MeV Now at deg, 115 MeV gives: E= MeV  MeV MeV [0.42 (phase) (ampl)] 0.66/220 = 0.3% more energy in BC1 R56 = mm  deg in L2 -36 deg  deg: 5 GeV  4.97 GeV % (less energy) [R56 = mm  deg or deg in L3, (L2 phase can be compensated with +18 deg in L3)] LCLS Jitter Status in 2012  V/V = 100 PPM (0.05 deg)  0.057% at 5 GeV

5 Expected vs Measured Slope BC2 E vs BC1 E Expected: / 0.3 = -1.9 Measured: /0.38 =  0.16 corrcoef = rho LCLS Jitter Status in 2012

6 DL2 Energy vs BC2 Energy Expected: 5 GeV / 12.3 GeV = 41% Measured: 36% / = 48% [ = 0.044% / 0.091%] (peak current increases jitter  20%) [over-compression reduces jitter] LCLS Jitter Status in 2012

7 Energy Jitter History at DL % at 3.5 GeV 3.0 times 0.04 % at 13.5 GeV 3.85 times LCLS Jitter Status in 2012

8 Effect of Peak Current Best energy jitter 0.03 %, long bunch, high energy LCLS Jitter Status in 2012

9 LTU Wire  E/E 12.3 GeV Hard X-ray 3.5 GeV Soft X-ray LCLS Jitter Status in % Jitter % 250 % = % = % Jitter % 140 % % Good: % ‘+’ % = %

10 How does the Energy Jitter Influence Seeding? Intensity on Direct Imager after Simulation: Jitter paints the KMONO [SASE: 0.07%] vs LTU x distribution 0.052/1.25 = 0.042% [seeded sometimes 0.030%   2] LCLS Jitter Status in 2012

11 Average Intensity and Variation, Seeded after KMONO 70% for 0.042% energy jitter, variation 40% rms 90% for 0.020% energy jitter, variation 10% rms LCLS Jitter Status in *  0.020% energy jitter requires  V/V = 80 PPM or 0.04  at L1S [= 0.020/1.2*13.6/5 / *100 PPM]

12 L1S phase is still the worst offender of energy jitter [12% of jitter power at 120 Hz,] but 35% at 60 Hz But other devices are close by: 60 Hz 120 Hz L1S 24-1 L0A L0B LCLS Jitter Status in 2012

13 Main Causes of L1S Jitter A)RF: a)Multi-pacting in load and reflecting back up and DOWN b)Single pulse break down (?) Both avoided by going un_SLEDed (after 220 MeV in BC1) B)Modulator HV: a)Thyratron not switching off “cleanly”, affecting next pulse Avoid by going to 300 kV (costs ~30 MeV, 190 MeV in BC1?) or MANY other approaches LCLS Jitter Status in 2012

14 L1S Modulator Modifications over the Years Try to “match” modulator to klystron impedance (high micro- perveance helps) Change klystron and a few thyratrons, and ranging them Run at 300 kV instead of 340 kV Shorter PFN Tail end clipper “Mystery fan” Delay charging PFN after thyratron firing [ended in fire 120Hz] Measuring and correcting HV (ala SCALA) going on now Other ideas: capacitors with lower inductance … LCLS Jitter Status in 2012

15 Techniques to Localize and Quantify Jitter 1.Methods to get data: 1.BSA (Beam Synchronous Acquisition) 2.Correlation plot 3.get_wf (waveforms) 4.L1S_jit (Jitter vs time) 5.Jitter CUD, FTP from matlab, 6.LLRFgui, KLYSTRONgui, … 2.Analyzing data: 1.BSA_jitter_fft (FFT, corrcoef, slope, …), …svd 2.corr_jitt … 3.get_wf_an14 4.Plot History … LCLS Jitter Status in 2012

16 BSA Data (Power Spectrum in DL2 Energy BPM) Feedback on: 0.054% Feedback off: % (even with big 60 Hz component, without 0.040%) LCLS Jitter Status in 2012

17 Correlation Plot and BSA [Transverse and FEL Intensity] BPM:IN20:371:Y is 75% correlated with VCC x position So laser causes at least 56% (=0.75^2) of 371 Y jitter (Is 42 Hz coming from laser OR MCOR power supply?) LCLS Jitter Status in 2012 From injector laser ?  5 Hz data

18 Jitter from Waveforms, e.g. L1S 300 raw waveforms, with RMS*1000 (red) revealing some elevated jitter inside the pulse, reflected signals show early multi-pacting Insert Presentation Title in Slide Master

19 DL2 and BC1 Pie Charts Much of DL1 explained“Rest” of BC1 is big (maybe 60 Hz shows more), Laser_P is big, but gets compressed, BUT FBs sees it LCLS Jitter Status in 2012

20 Localize Jitter vs z Concentrate on source: 16.7 Hz Make IFFT of FFT-data with only that frequency, then plot max-min vs z, fit oscillation LCLS Jitter Status in 2012 BPM_pvs(100) = 'BPMS:BSY0:61'

21 SVD for 1 st BPM in DL2 Insert Presentation Title in Slide Master 60 Hz L0A_A L0B_A last pulse missing, not used L0A_A L0B_A last pulse missing, not used L0A_A L0B_A MDL 476 Thales Ref L0B_A  DL2  BC2

22 Summary L1S makes ~36% of DL2 energy jitter power: 0.6^ ^2 = = 1.0 Energy jitter is 0.04% for hard x-ray, 0.12% for soft [0.18%] Lowering BC1 energy to 190 MeV, might avoid current modulator instability Hard seeding need about 0.02%, [soft seeding ?] Presented different methods to track down and quantify jitter LCLS Jitter Status in 2012