MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1.

Slides:



Advertisements
Similar presentations
MuTr Shielding & Grounding Preliminary 10/6/99 (G. Hart) Additions 1/4/01 (REM)
Advertisements

Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.
Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.
Building a Pressure/Temperature Weather Station (Sensor Pack) AEM 1905, Fall 2008.
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
Stations There are six stations of RPCs. They are 1-3 north, and 1-3 south. RPC3SRPC2S RPC1SRPC1N RPC2NRPC3N This document is available at
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Large Cell Scope Pictures, Part II HV Gnd 1nF Large Cell Tube Anode signal Phi Cathode signal scope S1 S2 S1 S2 This is a follow-up on Richard’s measurement.
Technical Support /7/08 PHENIX WEEKLY PLANNING 8/7/2008 Don Lynch.
Todd Moore for the DES CollaborationApril 20 th, Quick Summary of Noise Test Results. Noise test software & hardware setup. Earth grounding/shielding.
1 HV Bias Power Patch Panel for Scintillator KLM Gerard Visser Xiaowen Shi overview Schematics layout Parts.
Technical Support /13/08 PHENIX WEEKLY PLANNING 11/13/2008 Don Lynch.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
Performance of PHENIX High Momentum Muon Trigger 1.
Building a Weather Station for a Near-Space Payload AEM 1905: Spaceflight with Ballooning University of Minnesota.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Todd Moore for the DES CollaborationNov 28, Noise test hardware & software setup. Earth grounding scheme utilized for noise tests. Block diagram.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
2003/Oct/19 version.Page 1 Aerogel HV cable assembling procedures (for W1-NORTH-side of 80 Aerogel Boxes) Phenix high-pt PID upgrade team Original version(Oct/11/’03):
Technical Support /21/08 PHENIX WEEKLY PLANNING 8/21/2008 Don Lynch.
1 South Arm Installation Plan Itaru Nakagawa RIKEN/RBRC.
Performance of PHENIX High Momentum Muon Trigger.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
2003/Nov/16 version #1.Page 1 Aerogel HV cable assembling procedures (for W1-SOUTH-side of 80 Aerogel Boxes) Phenix high-pt PID upgrade team Original version(Oct/11/’03):
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Performance of PHENIX High Momentum Muon Trigger.
Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch.
Performance and Early Results from the Muon Tracking System of Rusty Towell of Abilene Christian University for the PHENIX collaboration First Joint Meeting.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
Run11 MuTrig Performance RIKEN/RBRC Itaru Nakagawa 1.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
HPS Motherboard Electronic Design
Electronics for RPC Upscope
LV Test Napoli feb 05 Noise ripple: EASY - + CRATE LV cable
Pierluigi Paolucci - I.N.F.N. Naples
Seyoung Han / Ewha Woman’s Univeristy
RPC FEE The discriminator boards TDC boards Cost schedule.
RPC Electronics Overall system diagram Current status At detector
TOF & BB FEE Safety Review
Presentation transcript:

MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1

Octant and quadrant numbers Numbering convention of the quadrant number is different btw N and S. 2 St.3 St.2 St.1 RPC prototype St.3 St.2 St Collision point North arm (2) South arm (1)

MuTr gaps, planes 3 station 1 muon plane 1 plane 2 Gap 1Gap 2Gap 3 plane 1 plane 2 plane 1 plane 2

MuTr cathode strips View from IR Count from left to right (North arm) Count from right to left (South arm) (North arm) (South arm)

MuTr FEE chassis 5 From Nakagawa-san’s slide

MuTr FEE 6 Connector number Backplane channel Master Slave

MuTRG-ADTX chassis Slot 1 Slot 2 IN OUT IN OUT IN OUT IN OUT ADTX Connector number ch=1-16 ch=17-32 ch=33-48ch=

FEE-ADTX cable 8

CAMCAM COMCOM Flat cable Ch.1Ch.16 COM CAB Ch.2 Ch.3... FCI Connector shield Pseudo-chamber to ADTX cable pin arrangement Blue : signal White: GND

CAMCAM COMCOM FCI Connector shield FEE-ADTX cable pin arrangement Blue : GND White: Signal

FEE-ADTX (North Station 1) Gap number is indicated as color of the box for each connector. Strip region is indicated as color of the connector number. 11

FEE-ADTX (North Station 2) 12

FEE-ADTX (North Station 3) 13 Stereo wires were mistakenly selected in above table This slide is going to be updated.

FEE-ADTX (South Station 1) 14

FEE-ADTX (South Station 2) 15

FEE-ADTX (South Station 3) 16 Stereo wires were mistakenly selected in above table This slide is going to be updated.

Number of ADTX boards StationChassis/octBoard/octChassis/stationBoard/station North North North North_total South South South South_total Spare1156 Ground Total

MRG-VME slot Rack power controller MuTRG-VME(1) (south arm) Coolig fan MuTRG-VME(2) (south arm) Coolig fan Optical patch Rack power controller MuTRG-VME(3) (north arm) Coolig fan MuTRG-VME(4) (north arm) Coolig fan Optical patch

MuTRG-MRG 19 IN1 IN2 IN3 IN4 IN5 IN6 IN7 IN8 IN9 IN10 OUT

MuTRG-DCMIF 20 IN1 IN2 IN3 IN4 IN5 IN6 IN7 IN8 IN-GTM OUT

MuTRG-LL1 21 Tile 1 Tile 2 Tile 3 Tile 4 To be confirmed with ISU group

DCM

What’s next Make connector map (FEE-ADTX) for all octants – A correction is neccesary for MuTr map for station 3 where stereo wires were picked. Create a strip-based map – strip-to-ADTXch relation Put into postgreSQL database 23