European Grid Initiative Design Study Current Status Luděk Matyska CESNET EGI_DS Project Director (With thanks to Juergen Knobloch for pictures)

Slides:



Advertisements
Similar presentations
EGEE-III and EGI Design Study Future European Grid Landscape CSC Finnish IT Center for Science.
Advertisements

Tackling the challenge of long term digital preservation through PCP The PREFORMA Project Anna Kasimati Studies and Programs Office, Greek Film Centre.
EGI Design European Grid Initiative Design Study Proposal.
EGI_DS – WP3 Workshop – CERN – Jan th 2008 WP3 Consolidation Workshop CERN, Jan th WP4 Status – Anne-Claire Blanchard - CNRS/IN2P3.
The EGI – a sustainable European grid infrastructure Michael Wilson STFC RAL.
Partners: France: Ministère délégué à la Recherche Germany: Projektträger des Bundesministeriums für Bildung und Forschung im Deutschen Zentrum für Luft-
The European Grid Initiative – Status and Overview Dieter Kranzlmüller (GUP, Joh. Kepler University Linz)
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE-III Program of Work Erwin Laure EGEE-II / EGEE-III Transition Meeting CERN,
Towards a National Grid Infrastructure - The European View Dieter Kranzlmüller (GUP, Joh. Kepler University Linz)
EGEE – EGI Transition Jürgen Knobloch, CERN EGI_DS Technical Director WLCG OB CERN 13 November 2009.
European Grid Initiative Design Study Ludek Matyska CESNET, Czech Republic Member of the EGI_DS team.
EGI – the next evolutionary step in Grid infrastructures Luděk Matyska CESNET Czech Republic
EGI Status and Outlook Pre-GDB May 12 th, 2009 Jürgen Knobloch, CERN EGI_DS Technical Director 2-Mar-091 J. Knobloch - Pre-GDB 12-May-2009.
The activities of CESSDA Data Archives in Europe Roxane Silberman DwP Principal Investigator CNRS/Réseau Quetelet 1st DwB Regional Workshop, Ljubljana,
Towards the new EGI governance model Arjen van Rijn (Nikhef) Chair Organizational Taskforce (EGI_DS and Local Host)
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
European Grid Initiative Dieter Kranzlmüller (GUP, Joh. Kepler University Linz)
Overview & Status of the Middleware & EGI Core Proposals Steven Newhouse Interim EGI Director EGEE Technical Director 26/05/2016 Status of EGI & Middleware.
Notur: - Grant f.o.m is 16.5 Mkr (was 21.7 Mkr) - No guarantees that funding will increase in Same level of operations maintained.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
The EGI Blueprint: Grid Operations and Security Migration to the next grid operations era Tiziana Ferrari (Istituto Nazionale di Fisica Nucleare)
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
LCG Introduction John Gordon, STFC GDB September 9th 2009.
This document produced by Members of the Helix Nebula Partners and Consortium is licensed under a Creative Commons Attribution 3.0 Unported License. Permissions.
Ian Bird LCG Project Leader OB Summary GDB 10 th June 2009.
Enabling Grids for E-sciencE 1 EGEE III Project Prof.dr. Doina Banciu ICI Bucharest GRID activities in RoGrid Consortium.
EIRG – e-Infrastructure Reflection Group Dieter Kranzlmüller e-IRG Chairman
1 ASTRONET Coordinating strategic planning for European Astronomy.
EGEE-III-INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III All Activity Meeting Brussels,
User Community Transition from EGEE to EGI 17 Dec 2008 – Orsay, France The Proposed EGI Model Diana Cresti, INFN
Budapest /08/2001 Annual Report of the European Regional Focal Point. Dominique PLANCHENAULT.
Dieter European Grid Initiative Towards a sustainable production grid infrastructure.
CERN as a World Laboratory: From a European Organization to a global facility CERN openlab Board of Sponsors July 2, 2010 Rüdiger Voss CERN Physics Department.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director Technical Director EGEE-III 1GDB - December 2009.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: “Policy and International Cooperation”
Community of Practice on partnership in the ESF October 2008 Open Days Benedict Wauters Deputy Director Flemish ESF Agency COP partnership coordinator.
European Grid Initiative Design Study Current Status Luděk Matyska CESNET EGI_DS Project Director (With thanks to Juergen Knobloch for pictures)
4 May 2009SSC Workshop, Athens1 User Community Services, SSCs, NGI International Tasks 04 May 2009 EGEE/EGI SSC Workshop – Athens, Greece Diana Cresti,
A. Candiello, INFN New industry perspectives emerging from the EGI model dr. Antonio Candiello INFN/IT, 39 Countries (NGIs)
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
Enabling Grids for E-sciencE EGEE-III INFSO-RI NA1 EGI Task Transition All Activity Meeting – January 2009.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NGI Policy Workshop Introduction and scope.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Plans for PY2 Steven Newhouse Project Director, EGI.eu 30/05/2011 Future.
Representation of European Grid efforts, international cooperation, and ESFRI EGI_DS WP3 consolidation workshop, CERN Fotis Karayannis, GRNET.
Resource Provisioning EGI_DS WP3 consolidation workshop, CERN Fotis Karayannis, GRNET.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
EGI-InSPIRE RI EGI-InSPIRE RI EGI-InSPIRE 1 EGI Governance Model Yannick Legré Director, EGI.eu
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGI InSPIRE Report to the EGI Council Steven Newhouse On behalf of the Editorial Board.
Co-ordination & Harmonisation of Advanced e-INfrastructures WP4 : Modelling the cooperation of European e-Infrastructures with non-European ones Ludek.
Ian Bird LCG Project Leader Summary of EGI workshop.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE NA4 SSC Workshop A&A SSC Proposal C.
Launch event ICRI 2016, Cape Town - South Africa Launch event ICRI 2016 Cape Town South Africa David Bohmert Member ESFRI Executive Board Swiss ESFRI Delegate.
NA5: Policy and International Cooperation
A. Candiello, D. Cresti, T. Ferrari1, F. Karagiannis, D
Tiziana Ferrari, INFN CNAF CNAF, Febbraio 2009
EGI Blueprint or Do not be afraid of EGI
Diana Cresti, INFN User Community Services in the European Grid Infrastructure 29 Jan 2009 – Paris, France Diana Cresti, INFN
Luděk Matyska CESNET ERIC Survey Results Luděk Matyska CESNET
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the Baltic Sea Region (BSR)
Long-term Grid Sustainability
TAPAS in the EGI “ecosystem”
ROSCOE Robust Scientific Communities for EGI
SOCIAL DIALOGUE WITHIN EUPAN
EGI-Engage T. Ferrari/EGI.eu.
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Presentation transcript:

European Grid Initiative Design Study Current Status Luděk Matyska CESNET EGI_DS Project Director (With thanks to Juergen Knobloch for pictures)

EGI workshop, CataniaMarch 2nd, Project Information Title: European Grid Initiative Design Study Budget: € EC Contribution: € Starting date: September 1 st, 2007 Duration: 27 months Total man power: PMs Coordinator: CESNET, Czech Republic (since July 1 st, 2008) GUP University Linz, Austria (till June 30 th, 2008)

EGI workshop, CataniaMarch 2nd, Project Partners 1.CESNET (coordinator): CESNET, zajmove sdruzeni pravnickych osob (Czech Republic) 2.GRNET: Greek Research and Technology Network S.A. (Greece) 3.INFN: Istituto Nazionale di Fisica Nucleare (Italy) 4.CSC: CSC - TIETEELLINEN LASKENTA OY (Finland) 5.LMU: Ludwig Maximillian Universitaet (Germany) 6.CERN: European Organization for Nuclear Research (Switzerland) 7.DNF: Verein zur Foerderung eines Deutschen Forschungsnetzes - DFN-Verein (Germany) 8.STFC: Science & Technology Facilities Council (UK) 9.CNRS: Centre National de la Recherche Scientifique (France) 10.GUP (former coordinator): Johannes Kepler Universitaet Linz (Austria)

EGI workshop, CataniaMarch 2nd, Goal of EGI Design Study Design of a new organizational model of a sustainable pan-European Grid infrastructure –the Blueprint and the Function Description Securing the endorsement of the proposed design –Endorsed at the Policy Board Meeting on 20 th January 2009 Preparation and setup of the new organization –the EGI.org, the EGI project

EGI workshop, CataniaMarch 2nd, Project Organization Five workpackages to deal with the objectives –WP2: EGI Requirements Consolidation –WP3: EGI functions definition –WP4: Design study of EGI legal and organisational options –WP5: Establishment of EGI –WP6: EGI Promotion and links with other Initiatives The management workpackage WP1

EGI workshop, CataniaMarch 2nd, Workpackage timing Preparatory Phase EGI Design Study Project (28 months) Develop EGI Proposal NGIs signing proposal EGEE-III (2 years) EGI operationalEGEE-II (2 years) EGI Entity in place EU Call Deadline for EGI Proposal EGI Blueprint endorsed by NGIs Final Draft of EGI Blueprint Proposal WP2 (4 months) WP3 (28 months) WP5 (24 months) WP6 (28 months) WP4 (15 months) WS1WS2WS3WS4WS PB

EGI workshop, CataniaMarch 2nd, Project Review October 3, 2008, Brussels Successfully passed (Good to Excellent) Major issues from the review report –Steps for the targeted call for EGI in 2009 –NGI maturity: Identify credible potential partners, assess the NGI maturity in regular intervals –Location of the EGI.org –Convincing EC at the political level –Convincing National Authorities and funding bodies

EGI workshop, CataniaMarch 2nd, The Blueprint General framework for the EGI Defines role of –EGI.org –NGI international tasks Operations User and application support Middleware maintenance Business model Financial framework

EGI workshop, CataniaMarch 2nd, The Road to the Current Blueprint WP3 consolidation WS Jan-08 WP3 consolidation WS Jan-08 MW: Coordination – no development Provision of a large-scale production Grid infrastructure MW: Coordination – no development Provision of a large-scale production Grid infrastructure Rome workshop March-08 Rome workshop March-08 D5.1: Draft Definition of EGI Org D5.2: Draft Convention D5.1: Draft Definition of EGI Org D5.2: Draft Convention Geneva workshop 30-June-08 Geneva workshop 30-June-08 Istanbul workshop 22-Sep-08 Istanbul workshop 22-Sep-08 D4.4: Early Draft of Blueprint Second Draft of Blueprint Feedbac k Requirement s from NGIs, EGEE Final Blueprint Prague Policy Board 20-Jan-09 Prague Policy Board 20-Jan-09 Feedba ck Feedback from: NGIs, EGEE, other Grids PRACE,WLCG,etc. Feedback from: NGIs, EGEE, other Grids PRACE,WLCG,etc.

EGI workshop, CataniaMarch 2nd, EGI Basic Elements (from Blueprint) EGI = EGI.org + NGIs –EGI.org as a coordinating body –NGIs basic sustainable actors National funding Own agenda and tasks –Synergies when working together at the EU level – NGI international tasks No middleware development within EGI –However, middleware maintenance included

EGI workshop, CataniaMarch 2nd, EGI.org and NGI Tasks EGI.org tasks NGI international tasks NGI local tasks EGI.org NGI

EGI workshop, CataniaMarch 2nd, Business Model International research teams and projects need a common international infrastructure to share data and compute resources EGI ensures a common infrastructure –National funding of research infrastructures  NGIs –Coordination through EGI.org –Steered by users

EGI workshop, CataniaMarch 2nd, EGI Management/Governance EGI.org EGI Director Non-voting Representatives extra-EU NGIs, Chair of UFSC, … Associate Members e.g. EIROforum member, … Members NGI 1, NGI 2, NGI 3, … NGI n EGI Council EGI Advisory Committees e.g. Middleware Coordination Board (MCB) User Forum Steering Committee (UFSC) User Forum (UF) Middleware Unit Administration & PR Unit Operations Unit User Community Services CTO Middleware Maintenance CAO Admin & PR UCO User Coordination COO Operations

EGI workshop, CataniaMarch 2nd, Funding National and Institutional funding for research infrastructures EC funding –International coordination –International activities –Innovation –Start up phase National co-funding of all these activities

EGI workshop, CataniaMarch 2nd, Resources for EGI.org

EGI workshop, CataniaMarch 2nd, Resources in NGIs Based on current experience These resources exist in countries with operational grid infrastructure Based on current experience These resources exist in countries with operational grid infrastructure

EGI workshop, CataniaMarch 2nd, EGI Financial Reference Model NGI International tasks Middleware maintenance EGI.orgTotal Operations User services Costs EGI Effort (FTEs) EGI costs (M€/year) Income NGI membership fees (M€/year) 1,01 EC Contribution (M€/year) NGI, Middleware consortia and EIRO/ESFRI co-funding Contribution (M€/year)

EGI workshop, CataniaMarch 2nd, Funding view of (medium) NGI EGI.org Membership Fees 30 k€ NGI “Average medium sized NGI” 600 k€ EC FundingNational Co-Funding

EGI workshop, CataniaMarch 2nd, Funding Evolution

EGI workshop, CataniaMarch 2nd, Transition towards EGI EGEE and similar EU projects Major issues –NGIs maturity level The EGEE JRUs not always identical with the proto-NGI Representing/working with different user communities Different approaches toward national infrastructures –EGI.org Location Key personnel identification Need for EGI technical representation “Grid Infrastructures transition towards EGI” (Deliverable D5.5)

EGI workshop, CataniaMarch 2nd, EGI.org Location Process accepted in Istanbul (September 2008) Call for bids closed January 7 th, 2009 Total of 8 bids received –France (Lyon), Finland (Espoo), Italy (Milan), Lithuania (Vilnius), Netherlands (Amsterdam), Poland (Krakow), Slovenia (Ljubljana), Spain (Trujillo) Evaluation Board constituted during EGI PB meeting in Prague (January 20 th ) Decision to be taken by the PB in Catania today, March 2 nd EGI.org established before September 2009 –Core of EGI Council established in June

EGI workshop, CataniaMarch 2nd, Further steps NGI assessment –Requirement from the review To identify status of preparedness –To confirm Acceptance the EGI framework as described in the Blueprint Commitment to the EGI.org fees Commitment to the NGI international tasks and their co- funding –MoU to define the EGI Council membership Former EGI Convention EGI project

EGI workshop, CataniaMarch 2nd, Expected further timing For EC co-funding, target the EC call this Autumn –Expected closure of calls in December 2009 Identification of project partners –EGI MoU to be signed in May Setup of project editorial board –By NGIs who signed the MoU (the EGI Council) –In parallel with EGI.org setup and key personnel identification Writing the project –Since July/August 2009

EGI workshop, CataniaMarch 2nd, Deliverables D3.2 Final EGI functions definitions –Month 20 (April) D3.4 EGI functions definition feedback –Month 22 (June) D5.5 Grid infrastructures transition towards EGI –Month 22 (June) D5.6 EGI Memorandum of Understanding –Month 20 (April, signed June)

EGI workshop, CataniaMarch 2nd, Summary The first phase successfully completed –Blueprint accepted and endorsed –Huge interest in hosting EGI.org, decision hopefully taken in a short time –Clear financial breakdown The second phase even more challenging –Securing EC and national funding –EGI.org setup and personnel identification –NGIs committing to the EGI framework –Clear definition of the transition path for all EU and national Grid infrastructures

EGI workshop, CataniaMarch 2nd,