Cable MRB July 13, 2005 R.P. Johnson. July 13, 2005R.P. Johnson2 Cable Status Needed in Italy to support Tower 8,9 Environmental Testing July 19.

Slides:



Advertisements
Similar presentations
Ray Lundquist, NASA GSFC
Advertisements

Tracker Subsystem1 GLAST LAT Project FM15 PSR, Oct. 14, 2005 GLAST LAT Tracker Tower15 Pre-Ship Review INFN-Pisa.
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 25 May 2011 Overall.
26 September 2000 High Voltage Plates and Capacitors Jack Fowler.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMay 20, 2003 LAT Engineering Meeting Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Revisions to Tray Design.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
MRB on SLAC NCR 226 MCM Encapsulation Delamination R.P. Johnson January 3, 2005.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
GLAST LAT Project18 July GLAST Large Area Telescope: NCR 529 Systems Engineering R. Bright Gamma-ray Large Area Space Telescope.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
HF Cabling Upgrade Options T. Shaw 30-OCT HF 2012 Upgrade Meeting 30-OCT-10 T. Shaw.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
High Speed Interconnect Solutions HIROSE ELECTRIC IT3-32mm SI Report Three-Piece Mezzanine Connector for 20+ Gbps Applications October 29, 2009.
GLAST LAT ProjectMonthly Review, November 3, 2004 Tracker SubsystemP. S. Drell 1 GLAST Large Area Telescope: Tracker Subsystem WBS Persis S. Drell.
Tracker Summary Alan Bross MICE CM October 10, 2007.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
MPSRQA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Mission Assurance Manager Ron Jackson University of California - Berkeley.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
1 Coupon Evaluation for GSFC Flight PWBs presented by Diane Kolos Materials Engineering Branch NASA Goddard Space Flight Center November 14, 2007.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
MRB on SLAC NCR 226 Excess of Disconnected MCM Channels R.P. Johnson November 9, 2004.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
Conformal Coat Quality issues Update of November 3, 2004.
Charlie Young, SLACPitch Adapter Review 1/20/051 Trace Cracking Problem Pitch Adapter (PA).  2-mil Kapton.  ½ oz copper.  Nominal 150  -inch nickel,
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
Tracker Timing Margin MRB R.P. Johnson U.C. Santa Cruz October 15, 2004.
Sierra Assembly Technology Inc.
GLAST Large Area Telescope:
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
GLAST Large Area Telescope:
Preproduction Status & Results
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
IPC Compliance Testing (DPA) Methodology
Presentation transcript:

Cable MRB July 13, 2005 R.P. Johnson

July 13, 2005R.P. Johnson2 Cable Status Needed in Italy to support Tower 8,9 Environmental Testing July 19.

July 13, 2005R.P. Johnson3 C7-142 Was initially rejected by Parlex QA for foreign material inclusion. –The coupons from the panel were good. Sent to GSFC for review. The material is nonconductive (from x- rays). Electrical tests at Parlex were good. The two traces near the material are TREQ signals from two different layers. –Trigger primitive (1 side of each of 2 differential pairs). –Failure of these traces would not impact the MCM functionality but would result in the loss of 2 out of 72 trigger primitives in the tower.

July 13, 2005R.P. Johnson4 C6-104 and C5-60 Rejected because of coupon annular rings less than 2 mils, but greater than 1 mil. IPC Class-3 high-reliability spec is >1 mil. NASA spec is >2 mil. For reference, the pad radius is 15 mils. These cables were sent to GSFC and reviewed by Diane Kolos et al this Monday. –Annular rings are visible at both cable extremities. –Some misregistration of the power/ground planes, but the electrical testing at Parlex at 100V indicates no problem. We have already asked Parlex to assemble these cables, plus C7-142, to have a good chance of them being available by end of week.

July 13, 2005R.P. Johnson5 C5-60 X-ray photos sent by Diane Kolos

July 13, 2005R.P. Johnson6 C5-60

July 13, 2005R.P. Johnson7 C5-60

July 13, 2005R.P. Johnson8 C6-104

July 13, 2005R.P. Johnson9 C6-104

July 13, 2005R.P. Johnson10 C1-17 Cable with fully conforming coupons results and electrical testing. 3 connectors have small (microscopic) cracks in the dielectric, found by LAT QA. See following slides. Testing in progress at GSFC on connectors with known cracks. –5 mate/demate cycles, and –5 thermal cycles, followed by: –Leakage current measurement: no change –Visual inspection: in progress This cable has already been shipped to Italy. –It must be installed on Tower 9 in order to proceed with environmental test. –The remaining question will be whether it has to be removed and replaced later. The tracker group is completely comfortable with using this cable for flight.

July 13, 2005R.P. Johnson11 Flex Cable S/N C1-17 / NC518 Slight cracks were exhibited on the first pin of each omnetics connector J3, J8, J9. J3 (30X)

July 13, 2005R.P. Johnson12 Flex Cable S/N C1-17 J8 J9