1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light.

Slides:



Advertisements
Similar presentations
NDVCS measurement with BoNuS RTPC M. Osipenko December 2, 2009, CLAS12 Central Detector Collaboration meeting.
Advertisements

Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
CASTOR at CMS Enhancing Forward Physics
CMS Heavy Ion Physics Edwin Norbeck University of Iowa.
Quartz Plate Calorimeter Prototype Ugur Akgun The University of Iowa APS April 2006 Meeting Dallas, Texas.
Roberta Arnaldi AFTER meeting, Grenoble 10 May 2012
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
CMS Calorimetry in the Very Forward Direction E. Norbeck, P. Debbins, and Y. Onel University of Iowa For the 23 rd Winter Workshop on Nuclear Dynamics.
Winter Workshop on Nuclear Dynamics, Heavy Ion Physics with CMS: Day-One Measurements Olga Barannikova for the CMS Collaboration.
The performance of LHCf calorimeter was tested at CERN SPS in For electron of GeV, the energy resolution is < 5% and the position resolution.
Patrick Robbe, LAL Orsay, for the LHCb Collaboration, 16 December 2014
Far forward angle physics at the LHC E. Norbeck and Y. Onel University of Iowa For the 24th Winter Workshop on Nuclear Dynamics South Padre Island
The forward detectors of CMS Experiment at LHC Bolek Wyslouch MIT
Rad Hard Active Media for Calorimeters E. Norbeck, J.E. Olson, A. Moeller, and Y. Onel University of Iowa PPAC Čerenkov Liquid with Tungsten metal.
Jornadas LIP 2008 – Pedro Ramalhete. 17 m hadron absorber vertex region 8 MWPCs 4 trigger hodoscopes toroidal magnet dipole magnet hadron absorber targets.
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
Motivation There is a consensus that it is not possible to obtain a software (π 0 ) calibration with few days delay (this is to be verified, this is the.
CMS Hadronic Endcap Calorimeter Upgrade Studies
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
PHENIX Local Polarimeter PSTP 2007 at BNL September 11, 2007 Yuji Goto (RIKEN/RBRC)
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
The Electromagnetic Calorimeter – 2005 Operation J. Sowinski for the Collaboration and the Builders Indiana Univ. Michigan State Univ. ANL MIT BNL Penn.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
HE CALORIMETER DETECTOR UPGRADE R&D Y. Onel for University of Iowa Fairfield University University of Mississippi.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
LHC The Large Hadron Collider (LHC) is an accelerator with 27 km circumference. Being built on the France- Switzerland border west of Geneva. It will start.
Integration of Forward Detectors, ZDC, and CASTOR into CMS Experiments Kevin Reynolds Michael Murray, Mentor David d'Enterria, Co-mentor 2006 Michigan.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
1 Zero Degree Calorimetry for CMS Had EM e +,  - Michael Murray for CMS.
Luminosity Monitoring Issues  ZDC  what’s the advantage?  problems  BBC  can they do it? A. Drees QCD critical point workshop, Mar
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
APS April2000 Meeting Ahmet Sedat Ayan Dept. of Physics & Astronomy University of Iowa.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PPAC in ZDC for Trigger and Luminosity Edwin Norbeck University of Iowa Luminosity Workshop November 5, 2004.
Christopher Cowden Advisor: Mario Spezziga Project: CMS HF (Forward Calorimeter)
Quartz Plate Calorimeter Prototype Hardware & Preliminary Test Beam Data Anthony Moeller The University of Iowa.
Edouard Kistenev for the PHENIX Collaboration Calorimetry based upgrade to PHENIX at RHIC CALOR 2012 Santa Fe, NM, June 4-8, 2012.
BRANs Sune Jakobsen (BE-BI-PM) LHC BI 2015 summary
July 27, 2002CMS Heavy Ions Bolek Wyslouch1 Heavy Ion Physics with the CMS Experiment at the Large Hadron Collider Bolek Wyslouch MIT for the CMS Collaboration.
Inclusive cross section and single transverse-spin asymmetry of very forward neutron production at PHENIX Spin2012 in Dubna September 17 th, 2012 Yuji.
Gas detectors in a ZDC (at LHC) Edwin Norbeck and Yasar Onel University of Iowa For7 th CMS Heavy-Ion meeting at Delphi June 2003.
H. Matis, S. Hedges, M. Placidi, A. Ratti, W. Turner [+several students] (LBNL) R. Miyamoto (now at ESSS) H. Matis - LARP CM18 - May 8, Fluka Modeling.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
1 Status of Zero Degree Calorimeter for CMS Experiment O.Grachov, M.Murray University of Kansas, Lawrence, KS A.S.Ayan, P.Debbins, E.Norbeck, Y.Onel University.
Peter Križan, Ljubljana September 17, 2008 SuperB PID Peter Križan University of Ljubljana and J. Stefan Institute Forward PID: - SiPM as photon detectors.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
PPAC Parallel Plate Avalanche Counter Edwin Norbeck University of Iowa For meeting at SLAC June 2, 2004.
PPAC Jonathan Olson University of Iowa HCAL November 11-13, 2004.
Detector status and commissioning: LUCID
The PSD at Pb-Pb run PSD drawbacks at Ar beam
Status of Zero Degree Calorimeter for CMS Experiment
Experimental Method: 2 independent detectors on both sides of IP
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
The ATLAS Zero Degree Calorimeter Brookhaven National Laboratory, USA
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
LHCf – CSN1 Trieste O. Adriani
HE Calorimeter Upgrade Studies
Present coverage Possible upgrade projects Slogan: Q C D HERA for LHC
Kazuya Aoki For the PHENIX Collaborations. Kyoto Univ. / RIKEN
Experimental Method: 2 independent detectors on both sides of IP
Presentation transcript:

1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light guide Copper frame to take heat out

2 The geometry of nuclear collisions Spectators Participant Region The number and orientation of spectator neutrons tells us the geometry of the collision. For low luminosity pp we will help diffractive physics.

3 Scope, Structure and People The scope of the project has been set. For HI runs we will provide centrality (1-50 neutrons) and luminosity measurement while for low luminosity pp we will measure bremstralung photons The structure will be a tungstan quartz sandwich divided into an EM section with 4 equal hadronic sections. The EM section will have 5 horizontal divisions. The project is a collaboration of Iowa, UIC, FNAL and Kansas plus David d’Enterria of CERN.

4 Simulation software ZDC is being integrated into CMSSW framework. We would like to include pp luminosity monitor. Eventually we would like a complete description of the very forward region. Chadd Smith UIC

5 Narrow showers give info on beam angle Narrow showers give info on beam angle Only the high energy core of the shower produces Cerenkov light. This means that we can get horizontal position information. We will bundle the electromagnetic fibers onto 5 different PMTs. This will allow us to measure the the beam crossing angle with a resolution of ~ 10  rad within a minute. FWHM = 5 mm Horizontal Position (mm)

6 Radiation Hardness For first 3 years of heavy ion and low luminosity pp running we expect 6GRad to hit the ZDC. So far we Iowa group has tested quartz/plastic fibers up to 1GRad without significant damage. However we are confident that quartz-quartz can do the job. We plan to use HF phototubes (or similar) since they have been very well characterized.

7 During pp runs detector heats by 20 o C During pp running sycnotron radiation will produce 200W. We measured the effect of this by injecting heat into an insulated plate and measuring the temperature increase. The plate was connected to copper strips for cooling. X Y Heat Time TT 20 o 0o0o 0o0o

8 Front End Electronics In order to minimize radiation problems we are planning to have as little electronics in the tunnel as possible. The PMTs will be connected by short cables to a patch panel where they connect to fast low loss cables. Collaboration of FNAL and KU. 140m signal cable Patch panel CMS electonics PMT by ZDC Tunnel Counting Room Time Voltage reference cable Two cables/PMT 1m cable

9 Schedule, cost and radiation risk To minimize these risks we will maximize the use of elements of HF and minimize mission creep. From HF we will copy light insertion system, albedo protection, light guides, PMTs and readout electronics. We also benefiting from experience of Iowa, FNAL and Boston. To avoid mission creep we differ building a flow detector for now but will leave space for future work. Also we will not work on timing for first runs but will leave option open. Finally since the 1 neutron peak gives a natural physics calibration point we will not use a radioactive source for calibration.

10 Timing useful for clean up. Vertex trigger gives factor of 2 increase in useful data for BRAHMS  = 2.8cm

11 Funding Profile Manpower for ZDC is supported by NSF Career award. We have started work on a prototype using $53K from DOE Nuclear program. Remaining $250k has been secured from DOE this week. This June we will get money for fibers and cables. We will build one detector and calibrate in test beam in August.

12 Conclusions ZDCs have been very useful at RHIC for both AA,dA and pp. For CMS they would make a significant contribution to the heavy ion and diffraction groups. The justification for the detector is accepted by NSF and DOE and we will be able to complete the detector with US nuclear funds. The schedule is very aggressive but the technology choices are conservative and we are gaining considerably from HEP experience.

13 Backup slides

14 Schedule, cost and radiation risk To minimize these risks we will maximize the use of elements of HF and minimize mission creep. From HF we will copy light insertion system, albedo protection, light guides, PMTs and readout electronics. We also benefiting from experience of Iowa, FNAL and Boston. To avoid mission creep we differ building a flow detector for now but will leave space for future work. Also we will not work on timing for first runs but will leave option open. Finally since the 1 neutron peak gives a natural physics calibration point we will not use a radioactive source for calibration.

15 Construction Prototype We have built a prototype that is 1/4 as long as the final module. KU machine shop is able to reach desired tolerances. We are now confident that we can construct a full size ZDC with quartz fibers.

16 Summary This week DOE agreed to cover ZDC development. We now have first design of hadronic section and are ready to purchase fibers, cables and tungsten (PMTs already bought). We hadronic prototype with steal plates to build up experience. EM section will come later.

17 Acceptance is ~100% for gray neutrons Protons will be swept down the beam pipe. Coalesence may remove some neutrons by converting them into deuterons. KE=200MeV RHIC 32GeV RHIC 100GeV CMS 2.7TeV P y MeV neutron proton Beam crossing angle shits Px acceptance away from zero

18 Luminosity & beam tuning at RHIC AuAu ZDC coincdence vs time pp Van de Meer scan

19 Centrality & ultraperipheral collisions

20 Number of Photon Electrons Mean = 347 RMS = 197  ≈ 19% 50GeV photon into EM section Z of Photon Electrons Limit of EM part