Briefer: John Charles Angermayer Briefer: John Charles AngermayerESC/GA Electronic Systems Center Hanscom AFB, MA Date: 5 Oct 2004 Date: 5 Oct 2004 Briefer:

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

An Institutionally Secure Integrated Data Environment (INSIDE) By University of St Andrews & University of Durham Original Aims –the development of a sustainable.
OPERATING EFFECTIVELY AT WESD. What is Internal Control? A process designed to provide reasonable assurance the organizations objectives are achieved.
Configuration Management
Software Quality Assurance Plan
1 Auditing in the Public Interest Records Management in the Victorian Public Sector Audit objective Audit had two objectives : The first objective was.
Software Quality Assurance Plan
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Enhancing Data Quality of Distributive Trade Statistics Workshop for African countries on the Implementation of International Recommendations for Distributive.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
School of Computing, Dublin Institute of Technology.
Area Nav: RNP Evolution
4. Quality Management System (QMS)
Chapter 10 Information Systems Controls for System Reliability—Part 3: Processing Integrity and Availability Copyright © 2012 Pearson Education, Inc.
Release & Deployment ITIL Version 3
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
Introduction to ISO New and modified requirements.
Rocky Mountain RAPS Process Validation Presentation 6/7/06 By Clay Anselmo.
Cybersecurity: Engineering a Secure Information Technology Organization, 1st Edition Chapter 7 Software Supporting Processes and Software Reuse.
FDA Docket No. 2004N-0133 Themes for Renewal of 21 CFR Part 11 Rule & Guidance by Dr. Teri Stokes, GXP International
Help Desk System How to Deploy them? Author: Stephen Grabowski.
Quality Control Project Management Unit Credit Value : 4 Essential
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Configuration Management (CM)
Service Transition & Planning Service Validation & Testing
InstantGMP: Electronic Batch Records System for GMP Manufacturing InstantGMP™ Inventory Control Module for GMP Manufacturing.
DAFIF DO-200A Compliance Status and Accomplishment
1 Ogden Air Logistics Center Innovation and Excellence TYBRIN©2003 Government Rights under Contract #F D-0027 TYBRIN©2003 Government Rights under.
Your measurement technology partner for global competitiveness CSIR National Metrology Laboratory The National Metrology Laboratory of South Africa Feedback.
Software Project Management Lecture # 11. Outline Quality Management (chapter 26 - Pressman)  What is quality?  Meaning of Quality in Various Context.
1 DISTRIBUTION A. Approved for Public Release; Distribution Unlimited. 88ABW , 23 May Integrity  Service  Excellence ADT 101: Introduction.
1 The Good, the Bad, and the Ugly: Collecting and Reporting Quality Performance Data.
1 Pat Benson GPS AIR INTEGRATIONS Digital Aeronautical Data for Navy GPS Aircraft Integrations September 2004.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Census Processing Baku Training Module.  Discuss:  Processing Strategies  Processing operations  Quality Assurance for processing  Technology Issues.
Copyright 2010, The World Bank Group. All Rights Reserved. Recommended Tabulations and Dissemination Section B.
Presented to: By: Date: Federal Aviation Administration AIRWORTHINESS Positive Safety Culture Failure to Follow Procedures 1 R1.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
State of Georgia Release Management Training
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
Session 6: Data Flow, Data Management, and Data Quality.
ICS Area Managers Training 2010 ITIL V3 Overview April 1, 2010.
INFORMATION ASSURANCE POLICY. Information Assurance Information operations that protect and defend information and information systems by ensuring their.
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Figures – Chapter 26. Figure 26.1 Factors affecting software product quality.
1. Our Presentation Topic: Importance Of Validation & Qualification In Pharmaceutical Industries Presented By: Md. Tanjir Islam (Group C) 2.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
CM-101 Configuration Management Fundamentals
PBN Performance Based Navigation
Configuration Management
Software Project Configuration Management
Defense Enterprise Accounting Management System (DEAMS)
WORKSHOP INTRODUCTION
Fundamentals of Information Systems, Sixth Edition
Configuration Management Why do we need it? What does it do?
Configuration Management
Workshop on preparations for ANConf/12 − ASBU methodology
Change Control Module P5 LEARNING OBJECTIVES: LEARNING OUTCOMES
Air Carrier Continuing Analysis and Surveillance System (CASS)
CMMI – Staged Representation
BU IS GIG Chemical, Oil & Gas
International Centre for Electronic Navigational Charts
Office of Federal Financial Management Office of Management and Budget
Measuring Data Quality
HHS Child Welfare National IT Managers' Meeting
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
OBSERVER DATA MANAGEMENT PRINCIPLES AND BEST PRACTICE (Agenda Item 4)
Presentation transcript:

Briefer: John Charles Angermayer Briefer: John Charles AngermayerESC/GA Electronic Systems Center Hanscom AFB, MA Date: 5 Oct 2004 Date: 5 Oct 2004 Briefer: John Charles Angermayer Briefer: John Charles AngermayerESC/GA Electronic Systems Center Hanscom AFB, MA Date: 5 Oct 2004 Date: 5 Oct 2004 Global Air Traffic Operations/Mobility Command and Control (GATO/MC2) System Program Office “GA LEADS THE WAY” 2003 Major General Albert R. Shiely Jr. Award Winner Navigation Databases

“GA LEADS THE WAY” Slide 2 Definitions  Accuracy - The degree of conformance between the estimated or measured value and its true value.  Resolution - The smallest difference between two adjacent values that can be represented in a data storage, display or transfer system  Correctness – Data meets stated quality requirements.  Integrity - The assurance that a data element retrieved from a storage system has not been corrupted or altered in any way since the original data entry or latest authorized amendment

“GA LEADS THE WAY” Slide 3 Definitions (Cont.)  Process – The steps involved in achieving a goal or objective. (My own Definition)  Assurance – Obtaining the required degree of confidence in the ability of a process or product to meet its stated requirements, that it is fit for its specified purpose.  Quality Management – Establishing and maintaining the required assurance in the process and product.  Essential Level Data– Failure conditions (i.e. using data of insufficient quality) that reduce capability of the aircraft or crew to deal with adverse operating conditions.  Timeliness - The degree of confidence that the data is applicable to the period of its intended use

“GA LEADS THE WAY” Slide 4 State Trusted Navigation Data Aircraft Manufacturer Software Developer (Tools) Air Crew Operations FMS Trusted Navigation Database Data Chain NGA DAFIF Aircraft Specific DAFIF Data Chain

“GA LEADS THE WAY” Slide 5 Simplified Air Force Data Chain Aircraft Pilot -User Trusted Format and Select Unit FMS Data World Wide NGA Combine State Data Trusted ‘States’ Supplier State Data GATM’s Main Area of Interest for Processes and Tools Wing or Squadron Check World Data World Wide Checked Feedback loop – (e.g. SSF) ●●●●●● Notams SPO MAJCOM ●●●●●●

“GA LEADS THE WAY” Slide 6 How is Compliance Achieved  State Data  By definition correct  For navigation data, an approved supplier is either a State or a RTCA DO-200A/EUROCAE ED-76 compliant supplier.

“GA LEADS THE WAY” Slide 7 How is Compliance Achieved (Cont.)  NGA Data  Uses State Data (Re-formats State Data)  Uses trained analysts and approved processes  Controls tools used  Uses only NGA internal systems  Tests tools  Ensures only approved tools are used  Ensures appropriate use of tools  Controls the release process and release timing  Does extensive data reasonableness checks during release process.  Uses CRCs  Quality Management

“GA LEADS THE WAY” Slide 8 How is Compliance Achieved (Cont.)  Users  Training  Defined and approved processes are used  Only approved tools are used  Tool vendor  Achieved tool qualification – DO-200A section  Uses an approved tool release process  Appropriate configuration management  Built required data control into tool  Built extensive data error reporting into tool

“GA LEADS THE WAY” Slide 9 Feedback Loop  Problem reports can come from all parts of the Data Chain.  Have a working system for feedback in place  Main capture is at Hill AF and NGA  Main CM control is at Hill AF  Main decision makers are currently at AMC support by all stakeholders  Most problems flow into NGA  If NGA can correct the problem then it goes no further.  NGA still responsible for NOTAMS  Processes are in place between all stakeholders to ensure problems get recorded at Hill AF and that those problems are appropriately distributed to the stakeholders.  Process is in place to ensure all problems are answered.

“GA LEADS THE WAY” Slide 10 What can be said about the GATM Approval.  Database is acceptable for specific essential operations.  Data Chain is in compliance with DO-200A at essential level.  Data delivered to the KC-135 aircraft has data resolution (number of digits) sufficient for essential use.  Accuracy is sufficient across the data base to support the allowed essential operations.  There is a working feedback system that can help measure and improve the correctness of the database.  Process changes are not allowed within the data chain without a GATM audit and approval; Quality control is being locally improved.  GATM Approval only involves database use in RNP 10 and RNP 4 airspace.

“GA LEADS THE WAY” Slide 11 What additionally should be said about the GATM Approval  The database is not approved as 100% correct  The database is not approved for all RNP operations  The database is not approved for use in RNP airspace on all Air Force aircraft  The database is not approved for critical navigation operations

“GA LEADS THE WAY” Slide 12 Summary  Where do we go from here?  My current objectives  Educate database users on current feedback system  Monitor the current feedback system against it’s performance requirements  Let current feedback system measure the correctness of the database  Let current feedback system improve the correctness of the database  Improve Quality Management in the Data Chain  Maintain current compliance of the Data Chain to DO- 200A

“GA LEADS THE WAY” Slide 13 Summary (Cont.)  Other possibilities  Establish an allowable correctness value for the database depending on use?  Make a big push to find errors in the database and fix any problems found to meet correctness requirement?

“GA LEADS THE WAY” Slide 14 Summary (Cont.)  Very difficult possibilities  Re-design the process  Implement the re-designed process?