Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.

Slides:



Advertisements
Similar presentations
HydroQual, Inc. Application of the SWMM Storage-Treatment Block for Analysis/Design of Extended-Detention Ponds Thomas L. Newman II, P.E. Tarig A. Omer.
Advertisements

Everglades Agricultural Area BMP Replacement Water Chapter 40E-63, F.A.C, Part II Rule Development Public Workshop August 28, 2006 Rule Development Public.
To response to litigation, thirty Minnesota Cities were directed to perform antidegradation reviews or Loading Assessments for two time periods: (1) (1)
Agricultural and Biological Engineering SWFREC, UF/IFAS Immokalee.
Flood the Sugar Cane Farms Now to Save the Estuaries: Is This Feasible ? Water Resources Advisory Commission January 5, 2006 Meeting.
Modeling to Support Green Infrastructure Planning Best Management Practice-Decision Support System (BMP-DSS) Application Andrew Parker Director, Water.
Florida Water Forum Everglades Restoration June 3, 2011.
Pond and Wetland BMPs, Retrofitting Detention Basins.
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
The South Florida Watershed
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
Hydrological Information System Module 20 – Integrated Reservoir Monitoring System.
National Park Service - DOI Everglades National Park Everglades Restoration Update: Water Quality, Central Everglades and Tamiami Trail Next Steps Project.
Assessing the Water Quality of South Florida Water Management Reservoirs November 18, 2004 Robert L. Knight, Ph.D. Wetland Solutions, Inc.
. Topographic map of the Refuge marsh (figure provided by Dr. E.A. Meselhe based on USGS topography data). Elevations are in feet, NGVD29.Form USGS data;
Water Quality Impacts of Reservoirs Burns & McDonnell (Contract C-C20104P) Gene L. Foster November 18, 2004.
Engineering Hydrology (ECIV 4323)
Chapter 8: Implementation of the Long-Term Plan for Achieving Water Quality Goals in the Everglades Protection Area 2006 South Florida Environmental Report.
Everglades Protection Area Tributary Basins January 15, 2004 Tracey Piccone, P.E.
Northwest hydraulic consultants 2NDNATURE Geosyntec Consultants September 11, 2007 Urban Upland / Groundwater Source Category Group (UGSCG) Overview Presentation.
Framework Agreement Principals Meeting #5 March 23, 2015 Everglades Water Quality Restoration.
Professional Engineering Services For Restoration Project John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Interim Update: Preliminary Analyses of Excursions in the A.R.M. Loxahatchee National Wildlife Refuge August 18, 2009 Prepared by SFWMD and FDEP as part.
St. Lucie and Indian River Counties Water Resource Study Mark Elsner, P.E., Director Water Supply Development Division Mark Elsner, P.E., Director Water.
DES 606 : Watershed Modeling with HEC-HMS Module 5 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins February 26, 2004 First Annual Public Meeting on Implementation Progress.
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
Water Supply Reallocation Workshop Determining Yield and Space Requirement.
Water Resources Advisory Commission January 5, 2006.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Water Resources Advisory Commission Lake Okeechobee Committee January 25, 2006 Susan Gray, Ph.D.
Tracey Piccone, P.E. August 10, 2004 Tracey Piccone, P.E. August 10, 2004 STA-1W Cell 5 Limerock Berm 2003 Outstanding Project of the Year Palm Beach County.
Basin-Specific Feasibility Studies STA and Reservoir Alternatives Basin-Specific Feasibility Studies STA and Reservoir Alternatives November 21, 2002 Presentation.
Engineering Hydrology (ECIV 4323)
Integrated Ecological Assessment February 28, 2006 Long-Term Plan Annual Update Carl Fitz Recovery Model Development and.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Basin Specific Feasibility Studies Everglades Stormwater Program Basins Preliminary Findings Contract C-E024 HSA Engineers & Scientists DB Environmental.
STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,
WRAC Acme Basin B Discharge Project February 2, 2006.
Lake Independence Phosphorus TMDL Critique Stephanie Koerner & Zach Tauer BBE 4535 Fall 2011.
US Army Corps of Engineers BUILDING STRONG ® Reservoir Simulation Software “Westfield Sub-basin” Presenter – John Hickey, HEC August 2010.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Revisions to the Long-Term Plan for Achieving Everglades Water Quality Goals November 18, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Settlement Agreement April June 2007 Prepared for the Technical Oversight Committee August 28, 2007.
Everglades Protection Area Tributary Basins February 23, 2005 Second Annual Public Meeting on Implementation Progress.
RB-Explorer M7a –Water Quality and Ecology Workgroup WFD-Explorer model wrapup.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
South Florida Ecosystem Restoration Projects 1. Seminole Big Cypress 3. Modified Water Deliveries 5. C-111 South Dade 10. C-111 Spreader Canal 13. Broward.
Everglades National Park Lessons Learned From Everglades National Park, USA Expert Workshop on Benchmarks and Chapter IV Operational Guidelines World Heritage.
Kevin Colvett, PE Jonathan Childs, PE CH2M HILL, Nashville CORRECTIVE ACTION PLAN AND ENGINEERING REPORT, PHASE III, FOR THE CITY OF BRENTWOOD, TN Presentation.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
STA 2 Expansion Project Conceptual Plan for Cell 4 STA 2 Expansion Project Conceptual Plan for Cell 4 Long-term Plan Communications Meeting November 18,
C ALOOSAHATCHEE & E VERGLADES R ESTORATION Jennifer Hecker, Director of Natural Resource Policy.
Wading Bird Habitat Suitability:
Hydrological Information System
STA-1E Structures, Flow, & Long Term Enhancements*
Presentation transcript:

Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August 21, 2002 Presentation to STA Design Review Staff

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins STA 3/4 Includes S-7/S-2 and S- 8/S-3 Basins Additional Inflows from ØC-139 Basin ØSouth Shore Drainage District ØS-236 Basin ØLake Okeechobee

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins STA-3/4 Present Design Approx. 16,543 Acres in 3 Parallel Flow Paths Emergent Macrophyte Marsh Current Design Basis Under Construction, Scheduled Completion Late 2003 Legend: Existing SAV Existing Spillway Existing Pump Station Existing Control Structure Existing Seepage Pump Station

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Baseline Conditions Current Design, Present Inflows Through 2014 Current Design, Inflows Modified To Reflect Full CERP Implementation (EAA Storage Reservoirs, Phase 1 and 2) After 2014 ØOnly Phase 1 Authorized by WRDA 2000 ØNot a CERP-sanctioned simulation, assumptions made for the BSFS which may or may not coincide with the final conceptual design for the EAA Reservoirs Inflow TP Loads Reflect 50% Reduction Due To BMPs In EAA

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Baseline Hydrologic Data and inflow TP loads taken from District-furnished files Outflows of long-term average flow-weighted mean TP concentrations estimated by method presented in Phosphorus Removal by Urban Runoff Detention Basins, W.W. Walker, Ph.D. ØPreliminary In Nature ØSubject to Review and Possible Substantial Modification During Design of EAA Reservoirs

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Baseline EAA Reservoir Modeled in 4 Components, 3 Hydraulically Linked to STA-3/4 ØA1 - Runoff from NNR & Miami Canal Basins ØA2 - Overflows from A1, & L.O.R.R. ØB - Overflows from A2, and L.O.R.R.

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Baseline Component A1 ØReservoir Area = 20,400 acres ØAverage Inlet Concentration = 95 ppb ØAverage Outlet Concentration = 65 ppb Estimated Long-Term Average Outflow Concentration, Compartment A1

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Baseline Component A2 ØReservoir Area = 20,400 acres ØAverage Inlet Concentration = 72 ppb ØAverage Outlet Concentration = 59 ppb Estimated Long-Term Average Outflow Concentration, Compartment A2

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Baseline Component B ØReservoir Area = 10,240 acres ØAverage Inlet Concentration = 71 ppb ØAverage Outlet Concentration = 59 ppb Estimated Long-Term Average Outflow Concentration, Compartment B

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins STA-3/4 Baseline Average Annual Inflows Ø ; 660,889 ac-ft at Mean TP Conc. Of 88 ppb Ø ; 628,502 ac-ft at Mean TP Conc. Of 76 ppb Average Annual Outflows Ø ; 623,700 ac-ft at FW Conc. Of 36 ppb, Geo. Mean Conc. Of 36 ppb Ø ; 588,100 ac-ft at FW Conc. Of 32 ppb, Geo. Mean Conc. Of 30 ppb

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Alternative 1 Current Design, Present Inflows Through 2014 STA-3/4 modified to optimize its performance--in place by 2014 ØConversion of Cells 1B, 2B, & downstream Portion of Cell 3 from emergent to Submerged Aquatic Vegetation (SAV_C4) Future (With CERP) Inflows Legend: Conversion to SAV New Control Structures New Small Forward New Levee Pumping Station P

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Alt. 1 Physical Works 3.3 Miles of Interior Levee Subdividing Cell 3 ØIncludes Additional Water Control Structures ØAlso Includes 3.6 Miles Additional Power Line Forward Pumping Stations (3 total, capacities range from 24 to 54 cfs) ØPump From Emergent Cells During Drought To Maintain Stages in SAV Cells Herbicide treatment of Cells 1B, 2B, and (new) 3B

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Alternative 2 STA-3/4 modified to optimize its performance--in place by 2006 ØOther Than Implementation Schedule, Identical to Alternative 1 Existing Condition Inflows Through 2014 Future (With CERP) Inflows

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins STA-3/4 Summary of Alternatives * Computed Value Less than Calibration Range, Reported at Lowest Sustainable Concentration **

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Sensitivity To SAV Performance * Computed Value Less than Calibration Range, Reported at Lowest Sustainable Concentration

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Sensitivity To BMP Performance * Computed Value Less than Calibration Range, Reported at Lowest Sustainable Concentration

Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins Basin-Specific Feasibility Studies Everglades Construction Project Tributary Basins General Sensitivity * Computed Value Less than Calibration Range, Reported at Lowest Sustainable Concentration