EKT 445 FINAL YEAR PROJECT 1 SEM I 2013/2014
FYP Coordinators Dr. Siti Zuraidah Ibrahim Contact No: Dr. Latifah Munirah Binti Kamarudin Contact No: Dr. Nik Adilah Hanin Binti Zahri Contact No: En. Fazrul Faiz Zakaria Contact No:
INTRODUCTION The FYP is implemented over a TWO (2)-semester period. For the first semester, a student will register for 2 CREDITS (EKT 445). For the second semester, a student will register 4 CREDITS for EKT 446. Each student is eligible to claim maximum RM 250 for the purchase of items used for the FYP.
COURSE OUTCOME CO1 : Ability to apply and integrate theory and practical which has been studied to solve the engineering problems. (Project Management) CO2 : Ability to identify and solve the related engineering problem. (Project Report) CO3 : Ability to develop the suitable research methodology for the project. (Project Management & Report) CO4 : Ability to present and justify/defend the project proposal. (Project Report & Presentation)
COURSE EVALUATION Evaluation based on 1. Project Management : 30% 2. Project Proposal (Progress Report) : 50% 3. Presentation : 20 %
PROJECT MANAGEMENT (30%) Assessment 100% by Supervisor Evaluated twice per semester For each criteria, the rate will be either: Very Poor (1), Poor (2), Moderate (3), Good (4), Excellent (5) Criteria1 st Progress2 nd Progress Attendance Commitment Quality of Work Ability to work independently Dedication and Motivation
PROJECT PROPOSAL (50%) Assessment 100% by Supervisor One copy of progress report should be submitted to the supervisor on 13 th week of lecture: Marking criteria: StructureTotal marks Report Organization/5 Objective/10 Literature Review/10 Methodology: Concept & Design/20 Reference/5 TOTAL/50
PRESENTATION (20%) Evaluated by two (2) external examiners Each examiner contributes 10% of the marks Will be conducted around 14 th to 16 th week of lecture (16 th Dec – 27 th Dec) The list of students with respective panels will be distributed 2 weeks before the presentation day.
PRESENTATION ASSESMENT NOASSESSEMENTSMARKS 1Research Motivation/Objective/10 2Project Gantt Chart/10 3Methodology + Project Overview/20 4Project Progress + Project Status/30 5 Quality of Presentation: Structure + Flow + Visual + Clarity /15 6Q & A/15 TOTAL/100
PLEASE INFORM FYP COORDINATORS IF YOU HAVE ANY PROBLEM ANY INFORMATION REGARDING THE FYP WILL BE UPLOADED IN THE PORTAL. PLEASE CHECK REGULARLY.