TROY ISD Long Range Facilities Planning Committee Maintenance and Operations Action Plan Transportation System Action Plan.

Slides:



Advertisements
Similar presentations
Louisiana Safe Routes To School Program
Advertisements

January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Developing a Flexible Capital Improvements Plan That Serves as a Long-Term Funding Stream VSBA Conference Williamsburg, Virginia November 16, 2006.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
NOTE: To change the image on this slide, select the picture and delete it. Then click the Pictures icon in the placeholde r to insert your own image. Farmington.
SCHOOL BUS STOPS OVERHEAD LIGHT and HAZARD LIGHT Effective July 21, 2004 Revised January 2007.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Juneau Downtown Tourism Transportation Study May 27, 2003.
Slide 1. Slide 2 Introduction How did you get to school as a child?
PTO Back to School Night Introduction to our new Access Drive “We are committed to making our school and community safer”
Tuesday, October 2, 2012 MSS Room #1.  The Leadership Team has not had a formal discussion about HSD facilities.  Individual discussions have taken.
Main Roads WA Perth Bicycle Network - Operational Overview Cycling Safety Forum 14 th May 2011.
Santa Susana High School Parking Lot Safety. If you know your ride will show up before school is out, ask your ride to park in a parking spot until you.
Ch. 6 - Passing NY State DMV 1. The law requires that we drive on the right side of the road.  When we are allowed to pass other vehicles, we usually.
Transportation Tuesday TRANSPORTATION TUESDAY Stopping & Parking You should never park or stop your vehicle on busy traffic lanes or in no waiting and.
ACT 96 - Indoor Environmental Quality In conjunction with the requirements directed under WI Statute and Administrative Code, school building officials.
Saint Charles, IL IASBO Facilities Management Committee Presentation 1 What Don’t I Know About Facility Management ? 60 th Annual Conference.
Module 3 SMART PARKING 1. Module 3 Smart Parking Goals for Smart Parking Balance parking supply and demand Consider innovative parking management policies.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
1 Section III Day 2 DMV Manual p. 5-6, Write a scenario about how the driver of the white truck managed to keep his truck on the edge of the.
Rules and Regulations for Safe Driving
BVUSD Facility Workshop September 17, Board Policy-BP 7110 The Board of Trustees recognizes the importance of long-range planning for school facilities.
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
Reviewed by Kim Davis EDLD 5362 Final Project May 15, 2011.
Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
Adams-14 School District Facilities Master Plan Kearney Middle School Focused Site Evaluation SITE DRAINAGE OBSERVATIONS General – Site drainage was primarily.
New Visions Bicycle & Pedestrian Action Plan Bicycle and Pedestrian Transportation – Bicycle and pedestrian travel is vital to the region’s public health,
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Northwest ISD Lakeview Elementary School Additions and Renovations Lakeview Elementary School Additions and Renovations
Sustainable mobility in Lviv mobility.lviv.ua. Sustainable mobility – any type of transportation that can help reduce environmental impact. This may include.
CHILDHOOD INJURY PREVENTION CONFERENCE Environmental Task Forces Russell Smith Program Advisor, FedEx Global Citizenship 2.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
TROY ISD Long Range Facilities Planning Committee Safety and Security.
Projects, Facts and Figures 1. Agenda A. Anticipated Use of Bond Funds B. Explanation of Texas’ Taxing Structure C. Tax Impact and History D. Election.
Savoy ISD Tax Ratification Election (TRE) What is it and why it is needed.
Smart Schools Bond Act High-Tech Security Projects Protecting Our Greatest Assets Conference December 2.
FACILITIES MAINTENANCE PLANNING
THE LOOP Introduction to the car-line Safety is our number one priority!
Lompoc Walkability Assessment September 24, 2009.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
FOOTHILL ELEMENTARY TRAFFIC PROBLEM SOLVING May 19, :30 p.m.
SMITHVILLE R-II SCHOOL DISTRICT Tradition of Excellence The Power of One … One Community … One Future! November 4, 2014 SMITHVILLE R-II SCHOOL DISTRICT.
Indianapolis Public Public Hearing – Proposed 2014 Budget Thursday, August 15, 2013 Transportation Corporation.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
1 Section III Day 2. 2 In this picture are a pedestrian, an inline skater, and a cyclist. They are all going the same way. Which roadway user has right.
1 Presented to the City Council By Randle Harwood, Planning and Development Director Art Cavazos, Chief of District Operations May 3, 2016 School Parking.
White Pigeon Community Schools
Overview of MSBA Building Process and Project Timeline
De Pere Aquatic Presentation
Overview of MSBA Building Process and Project Timeline
Finance Committee & City Council October 10, 2016
Finance Committee & City Council August 8, 2016
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
Facilities Report to the Buffalo State College Senate May 6, 2016
UNION GROVE ELEMENTARY REFERENDUM
Capital Outlay Workshop
Proposed Driscoll Expansion Brookline, Massachusetts
Master Facilities Committee Evaluation and Identification
Chimacum District Facility & Program Plan
FHSA Administration and Staff
Presentation transcript:

TROY ISD Long Range Facilities Planning Committee Maintenance and Operations Action Plan Transportation System Action Plan

ACTION PLAN Maintenance and Operations

BACKGROUND  After a review of select resources on school building maintenance and operations, and school transportation systems, action plans to address key deficiencies in these two crucial areas have been developed.  Data were collected on the sample building through first-hand observations and an interview with the Director of Student Services, who oversees maintenance and grounds personnel in this small 2A district.  The sample building used for this action plan is a 25 year old high school building that has undergone almost no renovation since its construction. As such, significant deficiencies exist in at least five key areas.

DEFICIENCY AREA #1: BUILDING SECURITY  Entry into the building is difficult to control. There is no vestibule, so either full access must be allowed without adequate supervision, or the building must be locked, and visitors must wait to be let in, creating a negative first impression. Source: Tanner & Lackney, Action Plan Step #1: Improve security at the main entrance by routing visitors through the office. Renovation required.

DEFICIENCY AREA #2: COMMUNICATIONS SYSTEMS  Along with security concerns, a lack of communications systems, aside from an antiquated intercom system, are lacking. The NCES Planning Guide for Maintaining School Facilities (2003) suggests that schools have wireless handsets equipped with 911 panic buttons. Also, classrooms do not have telephones, and not all call buttons are operational.  Action Plan Step #2: purchase wireless handsets for each administrator. Plan future technology upgrades to include phones in all classrooms.

DEFICIENCY AREA #3: HVAC CONTROL SYSTEMS  The NCES Planning Guide for Maintaining School Facilities (2003) suggests that schools maintain indoor air temperature at degrees F when heating and degrees F when cooling. Extreme high and low temperatures frequently occur in the building. For example, during the summer, the heat will sometimes be triggered when the A/C overcools certain areas of the building.  Action Plan Step #3: Upgrade HVAC control systems.

DEFICIENCY AREA #4: ROOF  Roof leaks are common in the building, damaging furniture and fixtures and possibly creating indoor air quality hazards such as mold.  Repairs have been made for many years and are no longer a viable long-term solution.  Action Plan Step #4: Replace roof.

DEFICIENCY AREA #5: GROUNDS MANAGEMENT/LANDSCAPING  Expectations for attractive grounds and landscaping have increased since the construction of the building. Trees are minimal even though ample space is available for trees and other Texas native plant species that would require minimal water and maintenance.  Action Plan Step #5: Contract for a landscape design plan, then budget for phased two-year implementation.

FINANCIAL IMPLICATIONS OF M&O DEFICIENCIES  Cost to make needed repairs and upgrades exceeds the maximum possible allocations from the district’s M&O budget.  Cost of the repairs and upgrades will not exceed both the value and the useful life of the building. It makes financial sense to invest additional funds into this building.

FINANCIAL STRATEGY TO ADDRESS M&O DEFICIENCIES  Bond Funds  Bond funds are an appropriate source of funds for the deficiencies described in this M & O action plan.  The repairs and improvements are long-term investments in the maintenance and operation of the sample building.  The repairs and improvements will contribute toward an improved learning environment, including significant improvements in safety.  The repairs and improvements are responsive to the facilities evaluation conducted and reviewed by the committee.

ACTION PLAN School Transportation System

BACKGROUND  A comparison of the Troy High School transportation design to the Operations and Safety Around Schools: Overview of Project Activities and Findings report shows that on school property, the major design elements align with the recommendations of the report.  Examples:  School buses are staged in a single file line with right wheels to the curb. School bus pick up and drop off is separate from other student and parent traffic.  Parent drive has ample stack space, and flow is counter-clockwise, with right wheels to the curb. One possible hazard is student traffic attempting to leave at the same time as parents are picking up students. However, two lanes of traffic, one for dropoff/pickup and one for through traffic, prevent major problems. Source: Cooner, S., Wooldridge, M., Fitzpatrick, K, Crawford, J., Ford, G. (2004) Operations and safety around schools: Overview of project activities and findings. Texas Transportation Institute. Retrieved from: pdf

FINDINGS  While bus drop off and pick up area and the parent drop off and pick up areas are near ideal, improvements are needed in the surrounding car traffic and pedestrian approaches to the school.  The arrows on the map show areas of traffic backup because three schools are located on a small, two-lane street with no center turn lane. Cars often leave the pavement to pass each other when traffic is backed up. (Map next slide.)

TROY HIGH SCHOOL MAP Mays Elem. School Troy High School R. Mays Middle School

DEFICIENCY AREA #1: LACK OF SIDEWALKS  Pedestrians do not have safe routes to school from the neighborhood west of Troy High School. Sidewalks are needed to improve safety and to encourage walking and biking to school.  Sidewalks have been added to the south side of the school— partially shown on the map prior to completion. These are a significant improvement.  Action Plan Step #1: Construct sidewalks on west side of Troy High School.

DEFICIENCY AREA #2: NARROW STREETS  Main street between I-35 and Raymond Mays Middle School is narrow with no turn lane, forcing car traffic off the pavement to get around turning vehicles during drop off and pick up.  Action Plan Step #2: Widen Main Street to include a turn lane.

DEFICIENCY AREA #3: PAVEMENT MARKING AND SIGNAGE  Lack of pavement markings such as arrows and striping prevents smooth traffic flow and causes confusion.  Lack of clear signage contributes to confusion and non-compliance with traffic flow expectations.

FINANCIAL IMPLICATIONS OF ADDRESSING TRANSPORTATION NEEDS  The cost of addressing the transportation deficiencies is significant, with implications for both the City of Troy and Troy ISD. The district and the city would need to collaborate to develop a plan for addressing the need.  The cost of addressing signage and striping is nominal and can be handled through the annual M&O budget.

FINANCIAL STRATEGY  Because the streets and sidewalks needed to address safety concerns on the routes to Troy High School involve a partnership with the city, the financial strategy will need to be one of collaboration. The Troy ISD board will direct the superintendent to enter into negotiations with the city to develop a plan for funding and constructing the needed street improvements. The district will need to be prepared to pay a portion of the improvements, especially for those parts of the project that are on property adjacent to district property. It may be necessary to allocate a percentage of bond funds from the construction project toward street and sidewalk improvements.  The signage and striping will be funded through the normal M&O budgeting process.  The district and the city will investigate a Safe Routes to School grant, which can provide matching funds for sidewalk improvement projects.