DR1 PF, E, & FTP PDR Prototype Fabrication, Economic and Flight Test Plan Preliminary Design Review October 26, 2000 Presented By: Mark Blanton & Chris.

Slides:



Advertisements
Similar presentations
The Fuselage and Empennage
Advertisements

Giving Bertha! LTA CDR David Dryjanski – Design/Construction, SolidWorks Expert Rachel Ellman - Design/Construction Carl Engel - Team manager, Propulsion.
DR2 Aerodynamic PDR II Aerodynamic Preliminary Design Review II “The 20 Hour Marathon” October 19, 2000 Presented By: Loren Garrison Team DR2 Chris Curtis.
The Black Pearl Design Team: Ryan Cobb Jacob Conger Christopher Cottingham Travis Douville Josh Johnson Adam Loverro Tony Maloney.
SAE Aero Design Guidelines Rev A, 2013 Aero Design Oral Presentation Guidelines How to Deliver a Presentation The Judges will Notice.
Aerodynamic Modeling for the Ohio University UAV For the Quarterly Review of the NASA/FAA Joint University Program for Air Transportation Research Wednesday.
Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) SAE AERO Chase Beatty.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
1 Design Group 2 Kat Donovan - Team Leader Andrew DeBerry Mike Kinder John Mack Jeff Newcamp Andrew Prisbell Nick Schumacher Conceptual Design for AME.
Completed Design Review Team Airblade Timothy Davenport Brian Guerrero Mark Kastantin Oscar Kataura William Peters Robert Taylor.
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok PROJECT PLAN REVIEW September 26, 2000.
DR2 Presented by: Mark Blanton Loren Garrison Chris Peters Jeff Rodrian September 26, 2000 Chris Curtis.
Project Plan Review AAE451 – Team 3 October 2, 2003 Brian Chesko Brian Hronchek Paul Johnson (MIA) Ted Light Doug Mousseau Brent Robbins Emil Tchilian.
DR2 Stability and Control Preliminary Design Review and Performance PDR October 24, 2000 Presented By: Christopher Peters …and that’s cool Team DR2 Chris.
Vehicle Sizing PDR Presented by: Mark Blanton Chris Curtis Loren Garrison September 21, 2000 Chris Peters Jeff Rodrian DR2.
Project Plan Review Brian Barnett Rob Benner Alex Fleck Ryan Srogi John Keune.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
DR2 Propulsion PDR I Preliminary Design Review II October 17, 2000 Presented By: Mark Blanton Team DR2 Chris Curtis Loren Garrison Chris Peters Jeff Rodrian.
Design Review Three Micro Air Vehicle Project: P Sponsored by Impact Technologies The Boeing Company Mark Baybutt Electrical Engineering.
Team 5 Prototype Fabrication, Economic and Test Plan QDR Presented By: Maria Mullins Charles Stangle.
Prototype Fabrication, Economic, & Test Plan QDR Tung Tran Matt Drodofsky Haris Md Ishak Matt Lossmann Purdue University AAE 451 Fall 2006 Team 4 Mark.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
14 October 2004AME 470 – Team Unum PDR #10 – 11 November 2004 Subsystem Integration Tim Culbertson Team UNUM.
March 22, Prototype Fabrication Economic & Test Plan QDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew.
DR2 Structures PDR Structures and Weight Preliminary Design Review October 5, 2000 Presented By: Jeff Rodrian & Chris Curtis Team DR2 Loren Garrison Chris.
Flight Performance, Stability and Control PDR Brian Barnett Rob Benner Ryan Srogi John Keune Alex Fleck.
Model Aircraft Tools, Materials, and Techniques. Open Structure with Iron-on Film Covering.
Flight Traveling By Emily. Surabaya – Auckland Departure time: Monday, September 29 th at 3:00 a.m. Length of flight: 9 hours and 16 minutes Auckland.
Katie Orona – Lead Brian Senft Katie Trujillo Curtis Amble Kyle Benalil Jack Holloway Jeremiah Duran Brigitte Ek Darien Williams Joe Landavazo Colton Fascitelli.
SAE Aero Design West 2008 Information Session. What is the SAE competition? Who - Undergrad and Grad Students (SAE Members) Competition Components - Design.
ELEMENTS OF AEROSPACE ENGINEERING AND DESIGN ENME 489L Fall Aerodynamic Analysis 3 Balloons in straight line Maximum Lift Minimum Drag.
(Tentative) Plan for Last Days of School. Friday 5/8 / Monday 5/11 Work on empathy final project Tuesday 5/12 / Wednesday 5/13 (MIN.) Work on empathy.
Real World Design Challenge
Order of Presentation David – Intro and Fall Review Matt – Testing and Summary of Changes Josiah – Details on New Design Josh – Electrical Hardware Ona.
Team 6: “Soldier Portable UAV” David Neira TJ Worden Matthew Martin Joshua Mellen Ona Okonkwo Josiah Shearon A IR HERCULES 1.
Student Unmanned Aerial System FAMU/FSU College of Engineering Mechanical Engineering Department (1) Electrical and Computer Engineering Department (2)
Cryohawk artist’s concept
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Preliminary Sizing PDR 26 September, 2000.
The Lumberjacks Team /16/12 Brian Martinez.
Miguel Jimenez Ricardo Lugo Carlos Rojas Advisor: Andres Tremante.
Project Plan Review Boiler Xpress Oneeb Bhutta Ryan Beech Matt Basiletti Mike VanMeter.
Design / Build / Fly Student Project 10 February 2006.
ES 100 Micro Aerial Vehicle Group 1 Michelle Helsel, Austin Dickey, Alsia Plybeah, Dylan Carlson, Peter, Lucilla Calderon.
Ashley Brawner Neelam Datta Xing Huang Jesse Jones
AAE 451 Aircraft Design First Flight Boiler Xpress November 21, 2000
Final Design Team 6 December 2 nd, UAV Team Specializations David Neira – Power & Propulsion Josiah Shearon – Materials Selection & Fabrication.
Subsystem Level Design Review.  Project Review  System Level Changes ◦ Tail Dragger ◦ Airfoil Change and Discussion  Subsystem Selection ◦ Fuselage.
Bridget Fitzpatrick Patrick Dempsey Heather Garber Keith Hout Jong Soo Mok Aerodynamics Preliminary Design Review #2 October 23, 2000.
ES 100 Micro Air Vehicle Project Montgomery College Professor: Dr. Charles Kung Summer I 2012 Team Members: Andrew Joe Laura Mohammed Nathelie Noella Stephanie.
February 24, Dynamics & Controls 1 PDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason.
DR2 Aerodynamic PDR Aerodynamic Preliminary Design Review October 3, 2000 German National Holiday Presented By: Loren Garrison Team DR2 Chris Curtis Chris.
Structures PDR 1 Team Boiler Xpress Oneeb Bhutta Matthew Basiletti Ryan Beech Micheal VanMeter October 12, 2000.
DR2 Propulsion PDR I Preliminary Design Review September 28, 2000 Presented By: Mark Blanton Team DR2 Chris Curtis Loren Garrison Chris Peters Jeff Rodrian.
ELA 8 1 ST HOUR November 24, 2015 Goal: Students will be able to conduct online research to find evidence to support both perspectives of a debatable topic.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Prototype Fabrication, Economic, & Test Plan.
1 Flight 0904 Update. 2 Flight manifest 13 New REPs are scheduled to test in Existing REPs testing in new territories 3 Existing REPs testing for.
My Plan to Go to Around the world By: Benedict/5C.
Critical Design Review Team Floating Point MIT April 25, 2003.
Yaqoub Almounes John Cowan Josh Gomez Michael Medulla Mohammad Qasem
AUTONOMOUS LONG-ENDURANCE UAV (SMART INTERN PROJECT)
Dynamics & Controls PDR 1
FINAL REVIEW UAV AIRFRAME B
Project Plan Review Team “Canard” September 14th, 2006 Team 1:
The Fuselage and Empennage
Fabrication, Economics and Test Plan QDR
Presented by Melissa Doan and Jason Hargraves
Prototype Fabrication, Economic, & Test Plan QDR
Vocabulary in your own words
Prototype Fabrication, Economic and Flight Test Plan PDR
Dynamic Modeling PDR Dynamic Modeling Preliminary Design Review for Vehicle and Avionics October 17, 2000 Presented By: Christopher Peters …and that’s.
Presentation transcript:

DR1 PF, E, & FTP PDR Prototype Fabrication, Economic and Flight Test Plan Preliminary Design Review October 26, 2000 Presented By: Mark Blanton & Chris Curtis Team DR2 Loren Garrison Chris Peters Jeff Rodrian

DR1 PF, E, & FTP PDR Presentation Contents -Remaining Design Tasks -Prototype Fabrication -Flight Test Plan -Economic Plan

DR1 PF, E, & FTP PDR Remaining Tasks – Propulsion -Motor and battery performance tests (due 11/4) Remaining Tasks – Aerodynamics -Stability analysis in CMARC to verify stability derivatives (due 10/29) -Verify aerodynamic properties of aircraft in CMARC (due 10/29)

DR1 PF, E, & FTP PDR Remaining Design Tasks – Structures -Final wing construction technique with balsa back-up (due 10/31) -Verify wing construction with prototype wing (due 11/4) -Wing Test (due 11/4) Remaining Design Tasks – Performance -Verify performance parameters

DR1 PF, E, & FTP PDR Team Deadlines -Critical Design Review (10/31) -Thiokol Draft Report (11/2) -Flight Readiness Review (11/16) -First Test Flight (11/16) -First Official Flight Mollenkopf (11/21)

DR1 PF, E, & FTP PDR Prototype Fabrication Nov. 5Lay-up 1 st wing in mold, start fuselage mold construction Nov. 6 Release 1 st wing, lay-up 2 nd wing Nov. 7 Release 2 nd wing, lay-up 3 rd wing, fuselage mold complete Nov. 8 Release 3 rd wing, lay-up 4 th wing Nov. 9 Lay-up fuselage skin Nov. 10 Release 4 th wing Nov. 13 Install components (motor, electronics, servos, batteries, horizontal stabilizer, etc)

DR1 PF, E, & FTP PDR Flight Test Plan First Flight on Thursday November 16, Unpowered flight to observe lifting capabilities and stability - Straight and level powered flight including take-off and landing -All practice test flights to be conducted at airport intramural fields. Alternate flight location in event of adverse weather in Armory if available.

DR1 PF, E, & FTP PDR Flight Test Plan Friday (11/17) – Sunday (11/19) -Perform necessary aircraft modifications Sunday (11/19) -Fly a complete mission to verify endurance time and flying qualities Monday (11/20) -Perform final modifications and ready aircraft. Tuesday (11/21) -First Official Flight in Mollenkopf Athletic Center

DR1 PF, E, & FTP PDR

DR1 PF, E, & FTP PDR Economic Test Plan Prototype Fabrication and Testing Cost Tower Hobbies $97.20 Fiberglass & Resin$71.50 Foam $24.85 Total $193.55

DR1 PF, E, & FTP PDR Projected

DR1 PF, E, & FTP PDR Projected

DR1 PF, E, & FTP PDR Economic Test Plan -Total Number of Hours as of 10/24/ hours -Estimated Total Hours at Project Completion hours -Cost per Man-hour$ Employee Wages at Project Completion$

DR1 PF, E, & FTP PDR Questions