WMS 1/9/20131 Priority Power Management, LLC Proposed Changes to Holistic Solution WMS January 9, 2013 James Z. Brazell Law Office of James Z. Brazell.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

Outage Cost Study Market Analysis and Design Outage Coordination Improvement Task Force 3/23/2015.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG September 19, 2014.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
Network Customer Meeting Access Metric Update November 16, 2006.
THE PJM INTERCONNECTION STATE OF THE MARKET REPORT 2001 Joseph E. Bowring Manager PJM Market Monitoring Unit Federal Energy Regulatory Commission June.
NPRR 365 Change in Resource Outage Approvals from 8 to 45 or 90 Days Woody Rickerson Director Grid Coordination
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
Proposed Revision to the Shadow Price Cap and Power Balance Penalties in SCED Same Transmission Element.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
December 15, 2003ERCOT Market Operations Group1 PRR 371 LSL clarification Chris Ngai Market Project Group.
West to North CSC Location Scenario 3b WMS August 20, 2008.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
Bill Hellinghausen EDF Trading North America
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Energy Commission Ministry of Economic Affairs May 2004 Financing Renewable Energy Development in Chinese Taipei.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Attachment to Testimony of Joseph Bowring Ohio Energy Mandates Study Committee April 16, 2015.
April 28, 2008 Constraint Competitiveness Tests, an Overview Congestion Management Working Group.
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002.
2007 ERCOT SOM Report Recommendations Dan L. Jones Vice President Director, ERCOT IMM Potomac Economics ERCOT Wholesale Market Subcommittee Austin, Texas.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
Slack Bus Change and Impact to Market Market Analysis, ERCOT QMWG Sep. 4, 2015.
Generation Adequacy Task Force Update to WMS November 18, 2009.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
Competitive Constraints/ Protocols 3.19 Presented to CMWG 10/14/2011 Steve Reedy, Manager, CRR.
CMWG Update WMS September 2015 Meeting. CRR Balancing Account Fund Discussion The CRR Balancing Account fund appears to be working as expected The cap.
Congestion Management Working Group WMS update 11/7/2012.
Unit-Specific Bid Limits based on Modified Generic Cost.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
2% Shift Factor rule and associated price discrepancies Kris Dixit 1.
CMWG Update to WMS Report of CMWG Meetings of &
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG October 23, 2015.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
Review of PUC Discussion on Nodal Market Adoption Technical Advisory Committee September 7, 2005.
1 WMS Report TO TAC April 2007 (which is in March)
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Regional Operations Review Group Activities Status Report to TAC April 8, 2004.
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis.
CMWG Update to WMS M Wagner Edison Mission Marketing & Trading.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
CMWG Update to WMS Report of CMWG Meeting of
Transition Plan Network Operations Model Change Requests 5/26/2010.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
1 ECONOMIC TRANSMISSION PLANNING Wholesale Market Subcommittee March 22, 2006 CMWG Proposal #1.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
Protocol Revision Subcommittee Tom Burke November 29, 2012.
Settlements Analysis due to SFT Deration Issue
Review of Abnormal MCPEs
Presentation transcript:

WMS 1/9/20131 Priority Power Management, LLC Proposed Changes to Holistic Solution WMS January 9, 2013 James Z. Brazell Law Office of James Z. Brazell 100 Congress Avenue, Suite 2000 Austin, Texas James Z. Brazell Law Office of James Z. Brazell 100 Congress Avenue, Suite 2000 Austin, Texas

WMS 1/9/20132 Priority’s Initial Proposal to WMS November 7, Change Shadow Price Caps to $1,000; 2.Change $95,000 net margin threshold: a. once margin passes $65,000, if constraint will continue and reach $95,000 margin, apply the Caps; b. once margin applied and Shadow Price Caps in effect, leave Caps in place until constraint is fixed—do not restart calculating margin at the beginning of the next year. 3. Apply Shadow Price Caps to closely related nodes after system changes applied that move constraint from its initial locus. 1.Change Shadow Price Caps to $1,000; 2.Change $95,000 net margin threshold: a. once margin passes $65,000, if constraint will continue and reach $95,000 margin, apply the Caps; b. once margin applied and Shadow Price Caps in effect, leave Caps in place until constraint is fixed—do not restart calculating margin at the beginning of the next year. 3. Apply Shadow Price Caps to closely related nodes after system changes applied that move constraint from its initial locus.

WMS 1/9/20133 Priority’s Revised Proposal to WMS December 7, Change Shadow Price Caps back to $2,000; 2.Change $95,000 net margin threshold to $80,000/MW/year; 3.Trigger for applying and terminating Shadow Price Caps is changed from calendar year calculation (currently used) to rolling 12-month calculation, recalculated daily. Price caps remain in place for next six calendar months. Price caps terminate on the last day of the fifth calendar month after the rolling 12-month net margin from rents falls below the $80,000/MW/year trigger; 4.maintain the November 7th proposal that Shadow Price Caps that originate with a constraint shall follow and be applied to closely-related nodes to which the constraint moves when ERCOT implements solutions, such as system changes, to address the constraint. However, drop the requirement that the constraint at the closely-related node must be non-competitive and irresolvable. 1.Change Shadow Price Caps back to $2,000; 2.Change $95,000 net margin threshold to $80,000/MW/year; 3.Trigger for applying and terminating Shadow Price Caps is changed from calendar year calculation (currently used) to rolling 12-month calculation, recalculated daily. Price caps remain in place for next six calendar months. Price caps terminate on the last day of the fifth calendar month after the rolling 12-month net margin from rents falls below the $80,000/MW/year trigger; 4.maintain the November 7th proposal that Shadow Price Caps that originate with a constraint shall follow and be applied to closely-related nodes to which the constraint moves when ERCOT implements solutions, such as system changes, to address the constraint. However, drop the requirement that the constraint at the closely-related node must be non-competitive and irresolvable.

WMS 1/9/20134 Discussion at CMWG December 14, Shadow Price Caps not constrained by $2,000 LCAP (could be $1,000, $500); 2.Rolling 12-month calculation of net margin threshold has merit; 3.Rolling 12-month calculation may coordinate with revised CRR Auction schedule; 4.$80,000 threshold reflects cost of 390 MW CT from IMM Report and that separate 390 MW turbines not needed for each constraint. 1.Shadow Price Caps not constrained by $2,000 LCAP (could be $1,000, $500); 2.Rolling 12-month calculation of net margin threshold has merit; 3.Rolling 12-month calculation may coordinate with revised CRR Auction schedule; 4.$80,000 threshold reflects cost of 390 MW CT from IMM Report and that separate 390 MW turbines not needed for each constraint.

WMS 1/9/20135 Conclusion  West Zone needs Interim Relief until transmission is adequate;  West Zone congestion results from unique West Zone conditions/Limitations (limited generation, small total load, limited transmission, more wind that other zones, large oil and gas load, less weather sensitive, different heat rate);  When Holistic Solution adopted, April to October 2012 West Zone Congestion Crisis had not occurred;  Holistic Solution changes will help provide Interim Relief;  Holistic Solution changes are reasonable, appropriate, and timely.  West Zone needs Interim Relief until transmission is adequate;  West Zone congestion results from unique West Zone conditions/Limitations (limited generation, small total load, limited transmission, more wind that other zones, large oil and gas load, less weather sensitive, different heat rate);  When Holistic Solution adopted, April to October 2012 West Zone Congestion Crisis had not occurred;  Holistic Solution changes will help provide Interim Relief;  Holistic Solution changes are reasonable, appropriate, and timely.

WMS 1/9/20136 Questions/Comments?