NA62: The LKr Electronics Matt Huszagh. Installation & Setup (1/5) Crate Setup 8 vertical columns of 4 crates Almost all installed.

Slides:



Advertisements
Similar presentations
Inputs: Digital and 4 configurable for Digital or 10 bit Analog Outputs:4 - 8 amp Relays or 700ma Transistors (1 PWM) 4 Line by 18 Character fully.
Advertisements

Abstract Overview Analog Circuit EEG signals have magnitude in the microvolt range. A much larger voltage magnitude is needed to detect changes in the.
What have we learned so far?  When we apply a voltage, the capacitor will charge up to the applied voltage.  The capacitor charges up exponentially.
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
LKr readout: present and future R. Fantechi 30/8/2012.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Data Acquisition Data acquisition (DAQ) basics Connecting Signals Simple DAQ application Computer DAQ Device Terminal Block Cable Sensors.
Steps To Set Up Your Home Wireless Network You can use a wireless network to share Internet access, files, printers, and more. Or you can use it to surf.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
“L1 farm: some naïve consideration” Gianluca Lamanna (CERN) & Riccardo Fantechi (CERN/Pisa)
Development of a wireless telemetry system for model rocketry.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Connectivity Devices. Network Interface Card (NIC) Allow user to connect to networks via Ethernet cable or Wi-Fi Nowadays integrally fitted into the.
Introduction to Vexnet
24/03/2010 TDAQ WG - CERN 1 LKr L0 trigger status report V. Bonaiuto, G. Carboni, L. Cesaroni, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
LKR Working group Introduction R. Fantechi October 27 th, 2009.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
News on GEM Readout with the SRS, DATE & AMORE
15 April 2008 B.Hallgren, M.Piccini and H.Wendler 1 A Proposal for the Readout of the NA62 LKr Calorimeter.
Performance of Programmable Logic Devices (PLDs) in read-out of high speed detectors Jack Fried INSTRUMENTATION DIVISION PLD ? PLD ? Muon Tracker PLD Muon.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
HDL-MGSM.431. Description MGSM.431 is an automation module based on GSM monitoring and controlling. Being at a great distance you can operate a target.
Shiuan-Hal,Shiu To-do-list and schedule 1. Things need to do before beam comes 2 Generate new trigger matrix for test beam base on the final geometry.(1)
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
FOCOMM_CAMAC Setup and Usage Guide Andrew Wong, Larry Ruckman.
ATLAS TDAQ RoI Builder and the Level 2 Supervisor system R. E. Blair, J. Dawson, G. Drake, W. Haberichter, J. Schlereth, M. Abolins, Y. Ermoline, B. G.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Threshold Scan Inject various charges and histogram number of hits seen (occupancy plot) for each pixel Vcal (charge) from 0V to 200V (101 steps) For each.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
SRB data transmission Vito Palladino CERN 2 June 2014.
LKr readout and trigger R. Fantechi 3/2/2010. The CARE structure.
Status of the NA62 network R. Fantechi 23/5/2012.
Final Year Project Eoin Culhane. MIDI Guitar Guitar with 6 outputs 1 output for each string Each individual string output will be converted to MIDI.
Current Status of RICH LVL-1 Trigger Module Takashi Matsumoto and Ken Oyama Presentation Outline Topics Geometry of Trigger Tile Required function of RICH.
09/09/2010 TDAQ WG - Louvain 1 LKr L0 trigger status report V. Bonaiuto, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti, F. Sargeni, F. Scarfi’
New digital readout of HFRAMDON neutron counters Proposal Version 2.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Modem. Introduction: A modem [Modulator -Demodulator] is a device. Data communication means transmitting digital information form one computer to other.
Straw (T)DAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
Start up: 1. Power off and insert a GSM card, power on and check the GSM signal on the LCD. 2. Use the LCD and keys on the module to check and set the.
Learning to read Installing a wired modem router.
Introduction to Vexnet
Status of NA62 straw readout
SMS module HDL-MGSM.431.
LKr status R. Fantechi.
Haiwell PLC Modules Introduce
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
CMS EMU TRIGGER ELECTRONICS
Status of the CERN ALIBAVA System
ENH500 WDS Bridge PtoP Link for IP Camera
BESIII EMC electronics
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

NA62: The LKr Electronics Matt Huszagh

Installation & Setup (1/5) Crate Setup 8 vertical columns of 4 crates Almost all installed

Installation & Setup (2/5) Calorimeter Readout Module Setup CREAMS: each crate contains 16 readout modules, one bridge and one motherboard (about half installed) Bridge: allows communication with the PC farm Motherboard: receives the L1 trigger from the PC farm and administers it to the CREAMs Ethernet connection: the creams send data via Ethernet ports to the switch, which then sends that data to the PC farm

Installation & Setup (3/5) The Switch Collects data from the CREAMs via Ethernet cables Combines data from all 16 CREAMS into a single 10Gb/s Ethernet connection, which is then sent up to the PC farm We have all of these installed but only 4 are currently configured There is also a problem with fitting the backplane behind the switches

Installation & Setup (4/5) The Trigger Administers the L1 trigger from the PC farm to each motherboard, which in turn administers the trigger to each individual CREAM

Installation & Setup (5/5) LKr Channels These channels send an analog signal from the LKr tank to each CREAM These are all in place, but few are actually connected I have not had any role in connecting these

Real Data / Equipment Testing (1/2) First real data! Data was acquired from 4 crates (64 CREAMS; 2048 channels) during a short period of time We can only take data for a short time currently because the cooling system is not yet installed I wrote and implemented a code which plotted a histogram of each channel and extracted the mean and sigma values I then plotted two histograms of all mean and all sigma values and fit them with a Gaussian I included the underflow and overflow to make sure no data was outside the range of each histogram Good result!

Real Data / Equipment Testing (2/2) This code is time-sensitive because it extracts the fit parameters of 2048 histograms currently and will eventually need to do so for 16,384 histograms I implemented two different methods for the same desired output Method 1: – creates a temporary array of 32 histograms (corresponding to all channels of a single CREAM) – The two final histograms (mean and sigma) are filled with the Gaussian fits of all 32 histograms – The array of histograms is emptied and refilled when the data from a different CREAM is being analyzed. Method 2: – creates an array of all 2048 histograms and iterates through to fill them with data – fits all 2048 histograms iteratively and extracts the mean and sigma values, which are then passed to the final histograms Method 1: ~3 minutes Method 2: >1hour