State-Industry Regulatory Review Committee Phase 2 – SIRRC II.

Slides:



Advertisements
Similar presentations
The Role of the IRB An Institutional Review Board (IRB) is a review committee established to help protect the rights and welfare of human research subjects.
Advertisements

Slide 1 of 12 Extended School Year (ESY): Legal Foundation Adapted from Region IV Presentation August 28, Slides.
Mammography Industry: Review of Proposed Accessibility Standards U.S. Access Board May 8, 2012 Atlanta, Georgia.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Gathering Update Pipeline Safety – Getting to Zero Pipeline.
Hazard Prevention Program
Nearly 50 American workers are injured every minute of the 40-hour work week and almost 17 die each day (OSHA) In 2003: 111 million workers at 7 million.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Gas Transmission Pipelines
Congressional Reauthorization and PHMSA Rulemakings – Enough to avoid future tragedies? Carl Weimer, Executive Director Pipeline Safety Trust.
MFRPS Lesson Learned North Carolina
Recently Issued OHRP Documents: Guidance on Subject Withdrawal and Draft Revised FWA Secretary’s Advisory Committee on Human Research Protections October.
Legal & Administrative Oversight of NGOs Establishing and Monitoring Performance Standards.
WILLBROS A Good Job On Time Hydrostatic Testing Practices Establishing Verifiable, Traceable, and Accurate Documentation August 20, 2013 Hal Ozanne Willbros.
Gathering Definition – Proposed Rulemaking Rocky Mountain EHS Peer Group Meeting January 19, 2006 Jeannette Jones Director- Pipeline Integrity Duke Energy.
Excavation Instructional Goal: through class participation and discussion, the participant will identify the issues and hazards related to trenching and.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Tom Kader Chief Electrical Inspector Spaces About Electrical Equipment Sufficient access and working space shall be provided and maintained about.
© 2012 Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code and the.
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
Process Safety Management
Research Conflicts of Interest: Identifying and Minimizing COI from the Perspectives of Sponsors, Faculty and the IRB Research Conflicts of Interest: Identifying.
South Dakota Gas Pipeline Safety Program 2011 Summary.
SHRIMP: Model Distribution Integrity Management Plan Development Tool John Erickson, PE American Public Gas Association.
Western Regional Gas Conference August 25, 2009 Distribution Integrity Management Programs (DIMP) & SHRIMP.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Gathering Definition Rocky Mountain EHS Peer Group Meeting July 25, 2006 Jeannette Jones Director- Pipeline Integrity Duke Energy Field Services.
BOBTAIL DELIVERY OPERATIONS Bobtail Delivery Operations 1.
Georgia Environmental Protection Division Stage II Gasoline Vapor Recovery Decommissioning Workshop June 11, 2014 EPD Tradeport Training Room.
Comprehensive Review of the Public Safety Communications Center Phase 2 Report County of Dane, WI February 12, 2009.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Regulatory and Compliance Landscape Western Region Gas Conference.
HOUSTON, TEXAS1 Pipeline Repair ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
MRWS GROUND WATER RULE (GWR) PREPARED BY JOHN CAMDEN MRWS GROUND WATER TECH
API S64, 3 rd Edition. 18 Dec 2013 Update. API S64 Chair – Tony Hogg Co-Chair – Open Current Edition – 2nd Edition, November 2001 Listing of Meetings.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Aging Infrastructure Management and Challenges Sue Fleck Vice President Pipeline Safety Trust “Getting to Zero’ Conference 2011.
RAILROAD COMMISSION OF TEXAS Chairman David Porter Commissioner Christi Craddick Commissioner Ryan Sitton Date.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
PIPELINE SPECIFICATIONS
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Consequence Analysis: A More Comprehensive Proposed Regulatory Approach Western Regional Gas Conference Tempe, Arizona Daron Moore August 19, 2014.
Minimum Sign Retroreflectivity Requirements Updated August 2012 with compliance date revisions.
Installing Appliances and Interior Vapor Distribution Systems MODULE 1 Introduction.
Chapter VI Emergency, occupational safety, security, medical care and survival functions January Maritime Training & Human Element Section IMO Familiarization.
OSHA Area Director Concerns Sheila Schulmeyer PBSTEPS August 12, 2008.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
U.S. DOT Pipeline and Hazardous Materials Safety Administration Integrity Management Systems November 18, 2015 Chris McLaren - 1 -
BY: Winston G. Smith Environmental Engineer UST/PCB & OPA Enforcement & Compliance Section EPA Region 4.
Regional Dental Consultants’ Meeting Presented by Emerson Robinson, DDS, MPH Region II and V Dental Consultant.
Page 1 | Confidential and Proprietary Information Review of Part C Jim Gaa, Chair, Part C Task Force IESBA CAG Meeting New York, USA September 14, 2015.
Voting Protocol – Samples Gas Pipeline Advisory Committee December 17, 2015.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
86 th Annual Operations Conference Ames, IA August 5, 2009.
March 8, as.virginia.gov/wps/portal/Home 1 Department of Medical Assistance Services Changes.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Table 3 – Value of Dimension D
Cross Connection Survey Training
Designated substance requirements
THURSDAY TARGETED TRAINING: Reporting Regulations and Requirements
INTERCONNECTION GUIDELINES
PIPELINE SPECIFICATIONS
Legislative & Regulatory Update on Validation of MAOPs of Transmission Pipelines January 17, 2012 Best Practices Kickoff Meeting Andrew Lu
Plastic Pipe Rule – Tracking and Traceability Proposed Requirements
AGA Positions on Current PHMSA Rulemakings
AGA Operations Conference
County Wide Safety Program
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
PIPELINE SPECIFICATIONS
Presentation transcript:

State-Industry Regulatory Review Committee Phase 2 – SIRRC II

SIRRC II - Background Joint NAPSR-AGA-APGA product Equal representation from States and Industry Addressed Parts J, K, and L of 192 Consciously avoided changes to transmission and gathering DeWitt Burdeaux participated as a consultant

SIRRC II - Focus From the co-chairs letter to Stacey Gerard: Eliminate confusing, ambiguous, and conflicting language Clarify the distinction of the sections and paragraphs applicable to transmission lines and those applicable to distribution lines Ensure code requirements for uprating and establishing the MAOP of distribution systems are clarified as a distinct set of rules. Eliminate confusing cross-references Simplify and facilitate compliance with rule provisions while ensuring safety is maintained or enhanced

SIRCC II – Commentary on Code Changes: Test Requirements Sets the minimum test pressure for mains and service lines at 90 psig or 1.5 times the intended MAOP, whichever is greater. Exempts replacement lengths of mains and service lines less than 45 feet installed by open trench or above grade from pressure test requirements as long as the pipe is leak checked at operating pressure and visually inspected. Specifies that test duration shall take into consideration volume of test segment. Specifies minimum duration for tests on lines operating above 125 psig but less than 30% SMYS. If a service line is disconnected and reconnected on the same day and remains under the control of the operator, the portion of the service line from the point of disconnection to the service line valve does not need to be tested. Except for customer owned service lines, records for all pressure tests shall be kept. Sets record retention to a minimum of six years for mains and service lines tested under

SIRRC II – Commentary on Code Changes: Uprating When uprating specifies pressure increases to target MAOP only. Specifies what must be included in review of the system prior to uprate. Eliminates initial leak survey prior to uprating. Adds an additional leak survey 10 to 30 days after last incremental pressure increase. Specifies that all leakage surveys required by this section shall be conducted using methods appropriate for the conditions encountered.

SIRCC II – Commentary on Code Changes: Operations Allows temporary operation above MAOP within limitations for emergency conditions beyond the control of the operator. Requires operators to investigate and take corrective action based upon the review if the system is operated above MAOP. Requires a leak survey if a system has been operating below 50% of its MAOP for 5 years or longer after increasing the pressure by 50% or 20 psig whichever is greater above the highest sustained operating pressure in the preceding five years.