Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.

Slides:



Advertisements
Similar presentations
Update on FCPS Construction/Renovation Projects July 2009.
Advertisements

Update on FCPS Construction/Renovation Projects September 2009.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
U.S. Customs and Border Protection Infrastructure Update Transportation Border Working Group October 27, 2010.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Hargrave Street Pumpstation – Site Preparation July 2014.
LNG in-ground tank March 6 th, 2006 Kajima Corporation.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
Interior and Exterior Demo Continue Dust Control Measures for Air Quality Management Per LEED Construction Plan 4/16/12 – 4/20/12 Iconic Birdcage Removed.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
Rectangular framed structures
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Steel Bar Joists Tyler Wells. Academy Sports Building The building we chose is Academy Sports. It is located in Opelika Alabama. Academy is a sporting.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
MARIAN BROTHERS- YUMBE(UGANDA) Construction of toilets, kitchen and renovation of library for Immaculate Heart Secondary School Yumbe- Uganda.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Community Meeting September 9, 2015 COMMUNITY CENTER IMPROVEMENT PROJECT BENNING PARK COMMUNITY CENTER.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Progress Photos March Construction Progress Park Station Portal Shaft Excavation 16 March 2007 View towards South 16 March 2007 General views of.
Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high”
North Augusta High School Design Development Presentation.
Access for All – The WMI Elevator Project What started as a dream several years ago is now becoming a reality. By the fall of 2010, the WMI will have a.
Caretakers House Demolition Decking to STEM and ARTS.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Orthographic Drawings
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Bond Oversight Committee Meeting Fourth Quarter 2015 January 26, 2016.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Structural Systems Design for a Laramie Office Building
Viktor Krivenkov Pavel Titov Roman Zinovjev Dmitry Pinezhko TTK/UAS, 2010.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
Building Committee Presentation March 03, MAIN ENTRANCE.
Bond Oversight Committee
School Improvement Bond Projects
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Designing a Commercial Shopping Center
Capital Improvements Presentation
CHANNEL DISTRICT ACTION TEAM
Council Rock High School South
Minuteman Vocational Technical Regional High School Progress
Progress Report 11/10/11.
Minuteman Vocational Technical Regional High School Progress
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Lecture 4 Building Construction 2 Week 5
New White Lake Township Library
416 UA College of Pharmacy Skaggs Building Addition and Renovation
In-Class Scheduling Exercise
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
North Augusta High School – Phase 2A and 2B
Minuteman Vocational Technical Regional High School Progress
Lafayette Airport Commission New Terminal Program Update
21st Century School Buildings Plan
Presentation transcript:

Elevating the Quality of Life in the District

AFTER RENOVATION BEFORE RENOVATION

Elevating the Quality of Life in the District AFTER RENOVATION BEFORE RENOVATION

Elevating the Quality of Life in the District BEFORE RENOVATION AFTER RENOVATION

Excavation & Demo in Courtyard

Installation of Foundation System & Elevator Pit in Courtyard

Courtyard Retaining Wall Installation

Courtyard Concrete Slab Installation

Erection of Structural Steel in Cafeteria & Roof of 1956 Building

Courtyard Concrete Slab Retaining Wall & Elevator Shaft Installation

1956 Building Addition Structural Steel Installation

1956 Building Addition Structural Steel, Framing Installation

1956 Building Addition Structural Steel Installation

Entrance Structural Steel Installation

Courtyard Structural Steel & Sprinkler Installation

1956 Building Addition Metal Deck Installation

1956 Building Addition Concrete Slab Installation

1956 Building Addition MEP Installation

1956 Building Addition Structural Steel Framing and MEP Installation

Courtyard Steel and Opening Installation

Playground Entrance Steel and Opening Installation

Shepherd ES Logo in Courtyard & Mural

Elevating the Quality of Life in the District NEXT STEPS TWO WEEK LOOK AHEAD  EXCAVATION ON INFILTRATION TRENCH AT SOUTH SITE  EXCAVATION OF SPRINKLER MAIN LINE PARKING AREA  FORMING & INSTALLATION OF CONCRETE SLAB IN COURTYARD  ERECTION OF STRUCTURAL STEEL IN COURTYARD AND 1956 BUILDING  INSTALLATION OF 1956 ADDITION EXTERIOR FRAMING

Kenneth Diggs DGS Associate Director DGS Government Affairs & Communications (202) Elevating the Quality of Life in the District