CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April 18-20 2012R.Guida PH-DT-DI.

Slides:



Advertisements
Similar presentations
E906 Gas System 1/7/09 LANL Meeting D. Northacker UIUC.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
RPC GAS SYSTEM Commercial grade Gas :Do in-situ purification Regeneration must :Get back ~90% Fixed pressure control room: pressure at all points in room.
Plans for the Muon Gas and Cooling Systems LHCb infrastructure workshop February Burkhard Schmidt, with important input from Roberto Guida and Beatrice.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
02/07/2014R. Guida CERN/PH-DT-DI1 RPC R&D Collaboration PH-DT Topics of Interest Studies of gas systems performance and development of dedicated gas modules.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
July 29, Update on the HBD Gas System Modifications Robert Pisani Brookhaven National Laboratory.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
Calliope ENEA Casaccia MON = monitor MWPC (CH1) T1 = test MWPC (CH3) T2 = test MWPC (BTF,CERN1,CERN2) T = temperature sensor P = atmospheric.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
Magnet & services projects P. Tropea 9 Nov 2011 – CMS upgrade workshop.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
19/02/2014A. D'Auria CERN/PH-DT-DI Maintenance ID flushing system:  Maintenance 2 dryers  Installation 2 flow meters  Maintenance of several hygrometers.
The RPC Closed loop Gas System Slides from Bianco and Guida.
Gas Systems for Particle Detectors R.Guida on behalf of the PH-DT-DI/Gas Service Team PH-DT Seminar CERN September 4 th, 2014.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Associated detection/extinction systems D. Swoboda.
BGV 05-may-2015CERNMassimiliano Ferro-Luzzi 1 BGV cooling : test & installation plans  point 8  LHC tunnel.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
MICROMEGAS General Meeting GAS DISTRIBUTION SHCEMES FOR THE MICROMEGAS DETECTORS OF THE NSW OF ATLAS NTUA T. Alexopoulos, S. Maltezos, S.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
NCP-CERN Project status Waqar Ahmed. Items Production sites requirements Clean room Gas system Gas leak measurement station. Leakage current measurement.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Cooling System Solutions
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Active gas system status & plans. S.Konovalov, K.Zhukov, K.Vorobev.
David Mcfarlane1 CMS Gas Systems (Nitrogen, Argon & CO2)
The closed loop system at ISR We moved the system at ISR in January. Preliminary tests has been done in order to verify the possible use in the “ISR conditions”:
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
S. Colafranceschi - Ischia CMS RPC Italia1 CMS RPC studies at ISR Stefano Colafranceschi Laboratori Nazionali Frascati Università di Roma – La Sapienza.
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
S.Colafranceschi 20 June Stefano Colafranceschi LNF Frascati CERN Universita’ di Roma – La sapienza An overview on gas studies, purifier materials.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
Detector Gas Systems Status Update Ferdi Hahn PH-DT1-GS 3 rd Detector Steering Meeting on Gas Systems June 2005.
CMS GEM services: Cooling
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Gas System Commissioning
Gas for World wide RPCs Ian Crotty 12 Feb 2015.
Tracker cooling loop “check out” draft for discussion
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
R. Guida PH-DT-DI Boston Students Program CERN, 16/1/2013
Pixel upgrade CO2 cooling plants – 3D modelling
Chamber Design and Integration RE3/1 and RE4/1
TRD GAS SYSTEM PRR Gas System Integration Gas building
RPC Detector Control System
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI

GEM gas system Main parameters: Detector volume: 3.4 m 3 Gas mixture: Ar 45%, CO 2 40%, CF 4 15% Required flow: 5 volume changes per day (~700 nl/h)  equivalent to about 200 kCHF/year for gas only in case of an open mode gas system: a closed loop recirculation system is a more cost effective solution (extra-cost are recuperated in about 6 months of running) Part of the infrastructures already exist since they were installed for the RPC RE1/1 and RE2/1 stations

Gas supplies Mixer Purifier module Pre-distribution and pump Final distribution Gas system layout Ar CO 2 CF 4 ok To be installed

Infrastructures for gas system  Gas system: Primary gas supplies Mixer Chamber pre-distribution system (some modifications are needed) Chamber distribution (some modifications are needed) Pump Purifier (optional) Exhaust Connection to CF4 recuperation (optional)  Main gas pipes: Supply and return gas pipes (+ spare?) from SGX to UGC

Gas infrastructures already existing  Gas system (standard installation as for all the gas systems for the LHC experiments) : Primary gas supplies (SGX5) All primary gases are already used by other CMS detector, therefore all the required components are already installed Chamber pre-distribution system (UGC) Gas pipes from UXC to UGC are available. Part (on/off valves + PT sensors) of the pre-distribution system is available, but most probably the best and clean solution would be to install two new racks (Endcap-, Endcap+) with dedicated pneumatic valves and pressure regulation valves Chamber distribution (UXC) 

Gas infrastructures already existing Chamber distribution (UXC) One manifold (12 supply and return channels) is available in each distribution racks. At the moment the controls are integrated in the RPC gas system. We need to decouple the two systems and re-calibrate the flow-meters. RPC RE 1/2, RE1/3 GEM GE 1/1

New gas infrastructures  Gas system: Mixer : three components gas mixer 30 kCHF Pump: gas circulation pump 25 kCHF Purifier (optional): 35 kCHF Needed only if the closed-loop circulation option will be adopted Exhaust: 10 kCHF Connection to CF4 recuperation (optional) - CMS is equipped with a CF4 recuperation system paid by the CSC group. Given the important amount of CF4 used by the GEM detector and the close similarity in the mixture composition, a connection to the existing plant should be evaluated and tested  Main gas pipes: Supply and return gas pipes (+ spare?) from SGX to UGC At least two pipes are needed to supply the pre-distribution and to collect the return gas from the detectors. More details and technical drawings are given in the technical proposal

Final gas distribution on the endcap disks On each RE1 and RE2 gas distribution racks, 12 channels were dedicated to the innermost RPC station. These channels could be re-used by the GEM detectors. The pipes from the gas distribution racks to the periphery of the disks should be also already installed and arranged in path panel. The piping from the periphery to the chambers on the disk most probably has to be installed (we can verify if something already exist during the 2013 long shutdown).

Conclusions  The closed-loop gas system for the CMS-GEM detector will cost about kCHF considering the re-use/modification of existing parts.  The installation of two new stainless-steel pipes from the SGX5 building to the UGC room is also needed. The cost for this item is not included in the present evaluation.  The piping on the disk needs to be verified: if present and/or reusable.  A final inspection, especially for what concerning the gas pipes on the disks, should be carried out (as soon as possible) at the beginning of the 2013 long shutdown.