STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC 301-286-4807) Tycho.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

MP Prototype 2 1IWF-EXP/ÖAW GRAZ  Smaller Size  Outcome of the test results with MP-P1 was the need for a reduced cross section  Rectangular Shaped.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 Low Energy Telescope (LET) Overview Alan Cummings
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 LET Electronics Rick Cook
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 SEP Integration and Test Alan Cummings
STEREO IMPACT Preliminary Design Review 2001-September 11,12 David Curtis1 IMPACT Project Overview.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Observatory - Overview July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 1 Single Observatory Stowed.
SPP FIELDS V5 Antenna Mechanical Peer Review David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
SPP FIELDS V5 Antenna Mechanical Peer Review Draft 2 David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
ZTF Interconnecting Scheme Stephen Kaye
INTRUSION ALARM TECHNOLOGY
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
MAVEN PFP Mechanical Peer Review SEP (Solar Energetic Particles) Instrument May 10, 2010 David Glaser Davin Larson Robert Lillis Paul Turin David Curtis.
C osmic R Ay T elescope for the E ffects of R adiation Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Peter Walpole, UMd1 SUPRATHERMAL ION TELESCOPE SIT.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Presenter1 Thermal Control R.Eby Impact Boom Stowed and Deployed SWEA STE Magnetometer Bob.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
LRR – Mechanical Alphonso Stewart Judy Brannen David Steinfeld Ilene Sokolsky Eric Jenkins.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
C osmic R Ay T elescope for the E ffects of R adiation Mechanical Design CRaTER and the Electronics Assembly Matthew Smith Mechanical Engineer (617)
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
1 SPP FIELDS MEP Main Electronics Package Preliminary Design Review Bill Donakowski UCB/SSL 13/14 NOVEMBER 2013 MAVEN PFDPU Flight.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
Main Electronics Package
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
1 PFP Peer iCDR 2011/5/11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review STATIC Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
STEREO IMPACT Preliminary Design Review 2001-September 11,12 Rick Cook1 LET Electronics.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 P.Berg1 STEREO IMPACT POWER SUPPLIES Peter Berg, UC Berkeley Space Sciences Lab,
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
C osmic R Ay T elescope for the E ffects of R adiation CDR v1 Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
First Wall Panel - Overview
Rose Navarro HMI Lead Thermal Engineer
Telescope - Mechanical
Low Energy Telescope (LET) Overview Alan Cummings caltech
University of California - Berkeley
Bill Donakowski Mechanical Engineer UCB/SSL
High Energy Telescope (HET) GSFC Caltech JPL
Chamber Design and Integration RE3/1 and RE4/1
Hawkeye Mechanical Design Snapshot
University of California, Berkeley
Matthew Smith (617) June 27, 2006 Mechanical Design, CRaTER Assembly and Electronics Assembly Critical Design Review Matthew.
Systems Engineering Bob Goeke.
HCAL HV splice box.
SNS PPU Cryomodule Instrumentation
GLAST Large Area Telescope:
Presentation transcript:

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho von Rosenvinge, GSFC

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR2 SIT Instrument Assembly Telescope HVPS Electronics Enclosure Actuator Door Assembly

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR3 SIT Enclosures High Voltage enclosure is being designed by GSFC Electronics enclosure is being designed by GSFC

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR4 SIT Telescope Door Single re-settable thermal actuator purchased from TiNi Aerospace. One-time opening door is needed for acoustic seal on launch and as a sun blocker during S/C early mission maneuvers. Door protects a thin Nickel window at the front of the telescope. Single-hinged door with a pre-tensioned spring and hard stop point.

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR5 SIT Mechanical Component Status The SIT Telescope design is a minor variation on the STEP telescope built earlier for WIND/EPACT. Only the SIT door actuator and mechanical enclosures for the electronics are new. Designs for new mechanical pieces for SIT are 75% complete. Designs for retro-fit of telescope are 50% complete. Drawings for SIT overall are 90% complete, new components 40%.

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR6 Main SEP Assembly LET Telescope HET Telescope SEP Central Enclosure Analog/ Post-Regulator Electronics Board Digital Logic Electronics Board LVPS HV Bias Supply Behind S/C configuration shown

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR7 Main SEP Electronics Assembly Electronics box is made up of 4 major components, the SEP Central Enclosure, the LVPS, the HET Enclosure and the LET Bracket Base. All interfacing walls, when attached will provide a continuous RF shield for internal electronics. Internal shielding between critical components will create separate shielded areas as necessary. Internal boards will be connected using Nanonics cables. Connections to the S/C will be via standard D Subminiature connectors Connections to external components (SIT and both SEPT’s) will be cabled using Micro-D (MDM) connectors.

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR8 Main SEP Assembly Status Designs for Main SEP Electronics Box components are 75% complete. HV Bias Shields design is 80% complete. Internal bracket designs and cable harnessing runs are 50% complete. Drawings are 25% complete. Analysis is being performed on the box structure to assure stiffness for the LET bracket as well as internal components.

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR9 Low Energy Telescope (LET) Schematic Top Cover M.I.S.C. Electronics Board Upper Shields L2 & L3 Detectors Inner Detector Housing Detector Collimators L1 Detectors Main Housing Lower Shields Front-End Electronics Bottom Covers

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR10 LET Telescope Bracket LET Telescope and Electronics SEP Box

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR11 LET Telescope & Bracket Status Telescope and enclosure designs are 85% complete. Drawings are 40% complete. Detector mounts have been fabricated and prototype detectors are being installed into the mounts. Bracket vibration analysis results TBD. Purge restrictor calculations will be performed upon completion of design Vibration and Acoustics tests will be performed on the bracket at the instrument assembly level.

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR12 HET Telescope Schematic and Assembly Front Foil, 10 mil Kapton 500A VDG inside GSFC Comp. Coat and ITO outside Collimator H1 Detector Telescope Main Body H2 Detector H3A & H3B Detectors Telescope Bottom Cover H4A & H4B Detectors H5A & H5B Detectors H6 Detector

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR13 HET Telescope Status Telescope and enclosure designs are 80% complete. Drawings are 50% complete. Detector mounts have been fabricated and prototype detectors are being built. Purge: sintered metal restrictor at 15 PSI permits flow rate of 1 liter/hour (~1 volume replacement every 4 minutes)

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR14 HET Electronics Assembly Inside view of componentsOutside view of components Telescope HET/SEP Enclosure Front-end Electronics Board Telescope HET Enclosure

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR15 HET Electronics Enclosure Electronics enclosure is aluminum and makes up half of the top and two thirds of the side of the Main SEP Electronics Box. Provides a base for the Flex/ Rigid PCB assembly to be held in its flight configuration to limit working the flex area. Allows telescope to remain attached to electronics from early on through testing and final integration to the Main SEP Box without having to be separated.

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR16 SEP Supplies (LVPS & Bias) Low Voltage Power Supply boards are being designed by UC Berkeley Housing is being designed at GSFC. Common Ground Shield Isolated Ground Shield PCB High Voltage Bias Supply board is being designed by Space Instruments. Shields are being designed at GSFC. Housing PCB’s

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR17 SEP Central Assembly SEP Central Enclosure Logic Board Analog/ Post- Regulator Board Houses common electronics for all telescopes

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR18 SEP Suite Purge 15 PSI dry nitrogen purge accepted from S/C through a ¼” teflon line into distribution manifold on main SEP box. Purge is then sent out via three 1/8” teflon lines to the HET, LET and SIT telescopes. Purge flow will be restricted by a sintered stainless steel plug at the inlet to each telescope in order to limit the flow per individual telescope needs.

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR19 Typical Mounting Foot Showing Thermal Isolation Ultem bushing for thermal isolation from S/C deck, 18mm diameter X 19mm thick. SEP Box aluminum mounting foot, 5mm thick Ultem Bushing for thermal isolation 13mm diameter X 3mm thick Titanium washer for ¼-28 bolt S/C mounting bolt 1/4”-28 Titanium x 2.0” long (electrically isolated from SEP Structure)

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR20 Typical SEP Ground Strap Being designed at UC Berkeley Design Goal: Thermal resistivity to be < 1/5th of total allowed between instrument and spacecraft.

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR21 SEP Instrument Suites SEPT-E SIT SEP/ HET & LET SEPT-N/S AHEAD SPACECRAFT SIT SEP/ HET & LET SEPT-E SEPT-N/S IN SAME POSITION AS AHEAD S/C BEHIND SPACECRAFT

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR22 SEP Locations on the Ahead Spacecraft

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR23 SEP Locations on Behind Spacecraft

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR24 SEPT-E F.O.V. (Behind S/C) Impingement and Close-call Rear FOV 0.16” from Solar Panel Catch BracketRear FOV Impinged by SWAVES Antenna

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR25 SEPT-N/S Impingement (both S/C) FOV impingement with Solar Panels

STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR26 LET Telescope FOV (Behind S/C) Impingement and Close-call 0.06” clearance Forward FOV impingement was accepted at PDR but has since been cleared Rear FOV Impingement with SWAVES Antenna