FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb. 2010 FEC: features and an application example J. Toledo Universidad.

Slides:



Advertisements
Similar presentations
On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
Advertisements

Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
8xADC AMC board Tomasz Klonowski Warsaw University of Technology PERG – ISE
ESODAC Study for a new ESO Detector Array Controller.
An ATCA and FPGA-Based Data Processing Unit for PANDA Experiment H.XU, Z.-A. LIU,Q.WANG, D.JIN, Inst. High Energy Physics, Beijing, W. Kühn, J. Lang, S.
PALM-3000 P3K FPDP Carrier Board Review Dean Palmer Building 318, Room 125 November 10, :00 am – 12:00 pm.
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
C-Card and MMFE using the BNL Peak Finding ASIC (VMM1) Ken Johns, Joel Steinberg, Jason Veatch, Venkat Kaushik (U. Arizona)
SRS-DTC Links WG5 RD51 Miniweek Alfonso Tarazona Martínez, CERN PH-AID-DT.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
Huazhong Normal University (CCNU) Dong Wang.  Introduction to the Scalable Readout System  MRPC Readout Specification  Application of the SRS to CMB-MRPC.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
The GANDALF Multi-Channel Time-to-Digital Converter (TDC)  GANDALF module  TDC concepts  TDC implementation in the FPGA  measurements.
Uni-Heidelberg, KIP, V.Angelov 1 International Workshop TRDs – Present & Future September, Romania Wafer Tester, Optical Link, GTU V. Angelov Kirchhoff.
1 20/02/12 SRS News SRU Revision, New Hybrids, DTC, Firmware, … Sorin Martoiu, CERN PH/DT SRS News, Sorin Martoiu, CERN 2012, 9th RD51 Collaboratin Meeting.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
PCIe Mezzanine Carrier Pablo Alvarez BE/CO. Functional Specifications External Interfaces User (application) FPGA System FPGA Memory blocks Mezzanine.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
Understanding Data Acquisition System for N- XYTER.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3-4 December 2007 Advanced.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
CaRIBOu Hardware Design and Status
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
C.Schrader; Oct 2008, CBM Collaboration Meeting, Dubna, Russia R/O concept of the MVD demonstrator C.Schrader, S. Amar-Youcef, A. Büdenbender, M. Deveaux,
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
BEE3 Updates June 13 th, 2007 Chuck Thacker, John Davis Microsoft Research Chen Chang UC Berkeley.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
Front-end readout study for SuperKEKB IGARASHI Youichi.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Status of NA62 straw electronics Webs Covers Services Readout.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
SRS Activities at IFIN-HH: VMM2 Hybrid, FECv6 Firmware, High- Density Optical ATCA-SRS Mezzanine Sorin Martoiu, Michele Renda, Paul Vartolomei (IFIN-HH.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
FEC electronicsRD-51 mini week, CERN, Sept Towards the scalable readout system: FEC electronics for APV25, AFTER and Timepix J.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 SysCore for N-XYTER Status Report Talk by Dirk Gottschalk Kirchhoff Institut für Physik Universität Heidelberg.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
29 May 2009 Henk Boterenbrood, Augusto Ceccucci, Bjorn Hallgren, Mauro Piccini and Helmut Wendler 1 The Calorimeter Recorder CARE.
Mircea Bogdan Chicago, Oct. 09, BIT, 500 MHz ADC Module for the KOTO Experiment The University of Chicago.
X SuperB Workshop - SLAC Oct 06 to Oct 09, 2009 A.Cotta Ramusino, INFN Ferrara 1 SuperB IFR: outline of the IFR prototype electronics A.C.R
Cloudland Instruments Hawkeye Electronics Snapshot March 10th, 2016.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
The Data Handling Hybrid
Test Boards Design for LTDB
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
PRAD DAQ System Overview
Production Firmware - status Components TOTFED - status
DHH progress report Igor Konorov TUM, Physics Department, E18
Large Area Endplate Prototype for the LC TPC
FMC adapter status Luis Miguel Jara Casas 5/09/2017.
Front-end digital Status
TPC Large Prototype Toward 7 Micromegas modules
Front-end electronic system for large area photomultipliers readout
Read Out and Data Transmission Working Group
FEE Electronics progress
Presentation transcript:

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb FEC: features and an application example J. Toledo Universidad Politécnica de Valencia NEXT Experiment

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb Outline  A list of features in the FEC card  Prototype production schedule  FEC firmware development  Application: NEXT-1 phase of the NEXT experiment

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb A list of features in the FEC card.

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb A list of features in the FEC card Concept Design a common interface between the RD51 DAQ (SRUs and/or DATE PCs) and a wide range of front-end electronics designs. This requires modularity, I/O flexibility and reconfigurability. FEC main board A-Card B-Card DAQ and trigger I/O Power (from ATX supplies) Application-specific I/O Common FEC mainboard + additional A, B and C-sized interface cards FPGA C-Card 6Ux220mm mechanics for Eurocard chassis

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb A list of features in the FEC card What’s in the FEC mainboard?  FPGA: Xilinx Virtex-5 LX50T FF665 FPGA A-Card conn. B-Card conns.  1x PCIe x16 (164 pin)  1x PCIe x8 (98 pin)  1x PCIe x1 (36 pin) for power  1 LEMO-00 NIM input  1 LEMO-00 NIM output  1 LEMO-0B LVDS input LEMO I/O  1Kb EEPROM for ID EEPROM SFP socket  1 SFP module (GbE copper or optical) RJ-45 I/O  2xRJ-45 LVDS I/O (2 pairs in, 2 out each)  Buffer: 2Gbit DDR2( MT47H128M16 MHz DDR2 Power  1 daisy-chainable power input (3.3V, 5V, 12V, -12V, -5V) from an ATX power supply  2-pin bias voltage input (up to 400V) JTAG  Daisy-chainable JTAG  On-board voltages monitor

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb A list of features in the FEC card What I/O is available for the A-Card?  Available I/O lines - 20 LVDS pairs (8 can be clock inputs to the FPGA) - 32 I/Os configurable as 32 slow SE, 16 fast SE or 16 differential, with selectable I/O signaling (VPIO: 1.8V, 2.5V, 3.3V) - 1 full MGT interface (in, out + clock pairs) - JTAG interface (2.5V levels, 3.3V tolerant) - I2C bus (2.5V levels) - Present and powergood lines - Power lines: 2xVPIO, 4x5V, 1x12V, 1x-12V FPGA EEPROM DDR2 JTAG A-Card Conn.  EEPROM interface via I2C bus - Mandatory: A-Cards have a AT24C01B compatible EEPROM - This is used for Card ID - After configuration, FPGA I/Os inactive until A-Card EEPROM is checked  Temp and voltage monitoring via I2C bus - Optional: A-Cards can have an I2C ADC for such purpose. First supported device: AD7417 (OTI line via powergood and CONVST via present line)

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb A list of features in the FEC card What I/O is available for the B-Card?  Available I/O lines - 20 LVDS pairs (8 can be clock inputs to the FPGA) - 28 I/Os configurable as 28 SE or 14 differential, with selectable I/O signaling (VPIO: 1.8V, 2.5V, 3.3V) - 2 MGT interfaces (in, out + clock pairs) - I2C bus (2.5V levels) - Present and powergood lines - Power lines: 2xVPIO, 5x5V, 5x3.3V, 2x12V, 2x-12V, 2x-5V - Bias voltage: 2xBias_GND, 2xBias_HV FPGA EEPROM DDR2 JTAG  EEPROM interface via I2C bus - Mandatory: Same functionality as described for A-Cards  Temp and voltage monitoring via I2C bus - Optional: Same functionality as described for A-Cards B-Card Conn.

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb A list of features in the FEC card How do I connect it to the DAQ?  Option 1: GbE to DATE via SFP module - Intended for stand-alone, test and small systems - This solution has been developed and tested (collab.CERN+U.P.Valencia) FPGA LEMO I/O EEPROM SFP socket RJ-45 I/O DDR2 Power JTAG  Option 3: To SRU via SFP module Foreseen as an option for “SRU v2”  Option 2: To SRU via RJ-45 conn. and DTC link protocol - Intended for larger systems - This solution is being developed (collab.CERN+U.Wuhan)

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb A list of features in the FEC card How do I connect it to trigger and clock distributions?  Possible clock inputs - LEMO LVDS input - LVDS on RJ-45: SRU conn. or second conn. - Additionally, on-board 200 MHz and 125 MHz clocks FPGA EEPROM DDR2 JTAG  Possible trigger inputs - LEMO NIM input - LEMO LVDS input - LVDS on RJ-45: SRU conn. or second conn.  Possible trigger outputs - LEMO NIM output - LVDS on RJ-45: SRU conn. or second conn.  Possible? connection to future CERN GBT via A-Card or B-Card LEMO I/O RJ-45 I/O

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb A list of features in the FEC card How about slow-controls?  Option 1: slow-controls from SRU via RJ-45 and DTC link protocol - Available only is SRUs are present in the architecture - DCS card production stopped… FPGA EEPROM DDR2 JTAG  Option 2: slow-controls from DATE via SFP module - First tests are successful… Work in progress (CERN+UP Valencia)  Additional alarms-system - Options 1,2 do not seem to allow slow-controls during data taking in the current configuration (can this be changed?) - Additional alarms-system needed in some applications for power supply failure, module overheating,… - We are developing an alarms system based on PLCs - Second RJ-45 could be used to interface the alarms-system RJ-45 I/O SFP

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb A list of features in the FEC card Can I hear a bit more on the power?  8-pin power connector from Phoenix - Daisy chainable - Standard ATX power supplies can be used FPGA EEPROM DDR2 JTAG - No fuses on the FEC card… these can be included in the ATX- to-FEC connector (to be developed)  Additional 2-pin connector for bias voltage (<400V) - Directly fed to the B-Card after filtering (10nF cap + transient suppression double diode)

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb Prototype production schedule.

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb Prototype production schedule Boards design  Schematic capture is finished  Board layout in progress PCB production  Scheduled for March/April  20 PCBs in the first batch Component mounting  Scheduled for April  BGAs and other ICs to be mounted in a company  Passives to be mounted in-house at University Board test  Scheduled for May  Basic FPGA firmware is being developed

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb FEC firmware development.  We can provide a basic set of features to RD-51 users  Users must then add their application-specific code

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb A-Card_INTERFACE Application-specific user code GbE_LINK Communication with DATE for data transfer and optional slow-controls I2C_CONTROL Two buses: A-Bus, B-Bus - EEPROMs - AD7417s - … SYSTEM_MONITOR VCCINT, VCCAUX and 5 other voltages + FPGA temp monitoring DDR2_CONTROL 400MHz 2Gbit buffer USER_RJ45_INTERFACE 4xLVDS RJ45 (optional alarms, clock and trigger) SRU_INTERFACE 4xLVDS RJ45 to SRU (Insert DTC Wuhan code here) MAIN_CONTROL B-Card_INTERFACE Application-specific user code FEC firmware development Common blocks to be provided Application-specific user blocks  Manpower for green blocks: 1,5 engineers  Basic code development started in Valencia in mid February, to be released by June

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb First application: NEXT-1 phase of the NEXT experiment.

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb NEXT-1 phase of the NEXT experiment NEXT-1  Small-scale electroluminiscent TPC filled with 136 Xe gas  PMT plane for Energy and primary light measurement (trigger)  Opposite SiPM tracking plane  Find out more about this  experiment at:

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb LDC GDC FEC1 FEC2FEC3FEC4FEC5FEC6FEC7 Tracking A- or C-Card Digitizing A-Card Trigger and sync. fanout Card Front-end electronics for tracking 440 tracking channels 14 FE cards (32ch/card) Front-end electronics for PMTs 64 Energy ch (4 FE cards, 16ch/card) +(1-to-4) primary light channels Trigger fanout (to 6 FEC boards) Primary light data (t o ) Final storage Slow controls via DATE Electronics alarms system EAS Trigger and synchronization NEXT-1 phase of the NEXT experiment

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb No SRUs are needed for NEXT-1 - FEC cards with GbE link connect directly to DATE PCs (tested!) - No GbE routers (DATE accepts unique data sources per GbE link in the current configuration) - For NEXT-1 we need: -7 FEC modules equipped with function cards: -5 digitizing A-Cards -2 tracking A-Cards or C-Cards -1 trigger fanout B-Card - 4+ DATE PCs (3xLDC + GDCs) This accounts for: 440 tracking channels 64 PMT channels (EL) <8 PMT channels (primary light) Primary-light based trigger and distribution NEXT-1 phase of the NEXT experiment

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb NEXT-1 phase of the NEXT experiment Interface to the front-end electronics  Analog front-end (PMTs): we receive 16 analog differential signals and send an I2C control bus for channel settings - 68-pin VHDCI connector with differential pinout? - 50-pin D Sub? - Flat cable?  Digital front-end (SiPMs) for tracking: 4xLVDS RJ-45 connector, full duplex: clock+data in each direction (similar to FEC-SRU LVDS link) - FEC-to-frontend data: short frames with timestamp sync, trigger and monitoring request - Frontend-to-FEC data: digitized sensor data + monitoring response - We will not not power the front-end from the FEC - We will digitally control the SiPM bias from the FEC

FEC features and an application exampleRD-51 WG5 meeting, CERN, Feb Thank you !