Traffic Management for Events Generic Traffic Control Diagram Declaration The uncontrolled traffic management diagrams(TCD) have been provided as a guide.

Slides:



Advertisements
Similar presentations
The Role of the IRB An Institutional Review Board (IRB) is a review committee established to help protect the rights and welfare of human research subjects.
Advertisements

Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Symbols Race HQ Other Marshal Points (Static or flag marshals) Race Start Point Accredited Marshal A (with authority to stop traffic) End of neutralised.
Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
2008 Mid-States Highway–Rail Grade Crossing Safety Conference May 20, 2008 David Peterson.
Today’s Meeting There are approximately 25 people killed by electricity per year in Australia (average for the last 7 years), 700 people are hospitalised.
© OPDS 2009 WELCOME TO OCEAN PARK DRIVING SCHOOL My Name is Kim Filby and I will be your Driving School Instructor First things first, do we all know our.
Traffic Signals, Signs and Pavement Markings  are used for traffic control to provide a smooth, orderly flow of traffic Remember: Obey all signs and signals.
The necessity of New Regulations for New Technologies regarding R79 Japan September / 2012 Informal document GRRF (73rd GRRF, September 2012,
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
Share the Road Lesson Plan. “Share The Road” Lesson Plan: Why??  Usually little or no training for cyclists, motorists, and pedestrians on safe interactions.
A guide to proctoring and scoring Regents exams
Freeway Signing Plan Design April 29, 2008
1 Austin Transportation Department Ali Mozdbar, P.E., PTOE Division Manager, Traffic Signals Traffic Signal Features for Pedestrians & Bicyclists.
The Highway Code You must turn left! You must turn right! You must stop! Signs giving ORDERS – blue circles – what must you do? Obligation You must go.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
Understanding the Virginia Driver’s Manual
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Contractor Management and ISO 14001:2004
Lec 14, Ch. 15: Introduction to intersection control (Objectives) Understand why some sort of control is essential to allocate ROW at intersections Understand.
Lec 14, Ch.8, pp : Intersection control and warrants (objectives) Know the purpose of traffic control Know what MUTCD is and what’s in it Know what.
Work Zone Safety It Starts With YOU!!. 2 BOOK 7 What is NEW??? IMSA TECHNICAL EXPO October, 2014 Dave Edwards.
ASPEC Internal Auditor Training Version
Quality Representative Training Version
Network security policy: best practices
Traffic Management for Events Uncontrolled Traffic Control Diagram Declaration The uncontrolled traffic management diagrams(TCD) have been provided as.
Highways Interface National Highways Interface Team.
Job Hazard Analysis Development
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
1 Section III Day 2 DMV Manual p. 5-6, Write a scenario about how the driver of the white truck managed to keep his truck on the edge of the.
Unit 2 Rules of the road TRAFFIC CONTROL DEVICES
Negotiating Intersections
Temporary Traffic Control Standards Update. Why? Came into this position soon after TC details became TTC standards about 1.5 years ago (2/13/2013) As.
February 24, 2015 First Public Hearing 1.  Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15 
Revisions to Part 6 – Temporary Traffic Control. Guidance on lengths of short tapers and downstream tapers.
HIPAA and Research Basics for IRB Tim Atkinson Director, Research and Sponsored Programs Director, Institutional Review Board Research Privacy Officer.
March 10, 2015 Second Public Hearing 1.  Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15  Second.
M The Road to Skilled Driving April 2006 Montana Driver Education and Training Obtaining and Maintaining Your Montana Driver’s License.
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
The new VicSmart process and provisions. What is VicSmart? VicSmart is a fast planning permit process A decision is expected to be made in 10 days All.
Travel. Handbook References Chapter 4: Reporting – Travel Report 2.
Intersections.
REVIEW OF THE PROPOSED SIGNIFICENT REVISIONS TO THE 2011 VIRGINIA WORK AREA PROTECTION MANUAL Fall 2014 Virginia ATSSA Chapter Meeting October 1, 2014.
Assessment Validation. MORE THAN YOU IMAGINE ASQA (Australian Skills Quality Authority) New National Regulator ASQA as of 1 July, 2011.
Understanding the Virginia Driver’s Manual
Intersection Control Chapter 8 Dr. TALEB AL-ROUSAN.
Chapter 6: Intersections
1 © 2013 Protiviti Inc. All Rights Reserved. This document has been prepared for use by OOCEA’s management, audit committee, and board of directors. This.
Doc.: IEEE /0039r1 Submission January 2007 Larry Green, Ixia Slide 1 TCP Parameters and Settings Notice: This document has been prepared to assist.
SATTM Safety audit procedure CoPTTM 4th edition Version 2.0.
Quality Management Systems Advice from ISO/TC 176 for Sector-specific applications.
MHA Receipt & Scrutiny Training for Qualified Nurses & MHPs Presented by: Sharon Long Deputy MHA Manager Version 1.
IMUTCD–Recent Revision, Panel Sign Standards & OHSSI Lalit Garg, P.E. Traffic Administration, INDOT March 9, 2016.
0 OFSC Signage Guidelines Signage Training. 1 Signage Training is now mandatory for all District and Club Signage Coordinators every 3 years.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Development Management Customer Satisfaction Survey 2015/16 Economy, Planning and Employability Services Reported Prepared May 2016.
Table 3 – Value of Dimension D
2016 OBRA TEAM TIME TRIAL CHAMPIONSHIP May 21th, 2016.
Drawings Introduction to FIDIC - Drawings -.
Revisions to Part 7 – Traffic Control for School Areas
TCP Parameters and Settings
Safety Effects of Marked vs
SAFE WORK INSTRUCTIONS
Reason for performance difference between LVW and GVW
Off-channel selection
Example of cones and signs as traffic control at a roadway incident.
Training Presentation Truck Controller- Surfacing
Presentation transcript:

Traffic Management for Events Generic Traffic Control Diagram Declaration The uncontrolled traffic management diagrams(TCD) have been provided as a guide and assistance to event organisers in the preparation of a Traffic Control Diagram for Events. It is the user’s responsibility to verify that the TCD(s) satisfies the user’s requirements All Traffic Management Plans and Traffic Control Diagrams for events must be prepared and endorsed by a person holding a current Main Roads accreditation in Advanced Worksite Traffic Management (AWTM). Further information regarding Traffic Management Plan preparation, management and accreditation is provided in Section 7 and 10, Main Roads’ Traffic Management for Events Code of Practice. Main Roads’ Traffic Management for Events Code of Practice is available from the Main Roads website (Our Roads > Traffic Management > Events on Roads) To the extent permitted by law, Main Roads, its employees, agents, authors and contributors are not liable for any loss resulting from any action taken or reliance made by you on the information herein displayed. Main Roads hold no responsibility as to the accuracy of the content and the suitability of the information provided. It is the sole responsibility of the end user to ensure and verify the content provided is consistent with Main Roads’ Traffic Management for Events Code of Practice, current standards and best practice. For further information, please contact Main Roads’ Road Safety Policy Coordinator on (08) PREFACE

Traffic Management for Events Generic Traffic Control Diagram AMENDMENT / REVISION STATUS RECORD DateSection / Page Amendment / Revision Description April 2015Whole document Distance of traffic controller advanced warning signs to traffic controller position amended March 2011Whole document Relationship between Dimension ‘D’ and approach speed clarified

Traffic Management for Events Generic Traffic Control Diagram On Road Bicycle Race Control at Regulatory Signed 4-Way Intersection - - Right Turn fromTCD BR Right Turn or Straight Through fromTCD BR Left Turn fromTCD BR Left Turn fromTCD BR Straight Through on Major RoadTCD BR05-1 Straight Through on Minor RoadTCD BR06-1 Control at 3-Way Intersection - - Right Turn from Continuing RoadTCD BR Right Turn from Terminating RoadTCD BR Left Turn from Continuing RoadTCD BR Left Turn from Terminating RoadTCD BR10-1 Control at 4-Way Roundabout - - Right TurnTCD BR Left TurnTCD BR Straight ThroughTCD BR13-1 Control at 3-Way Roundabout - - Right Turn from Continuing RoadTCD BR Right Turn from Terminating RoadTCD BR Left Turn from Continuing RoadTCD BR Left Turn from Terminating RoadTCD BR17-1 U-Turn on 2-Way CarriagewayTCD BR18-1 On Road Race (Non Vehicular) Control at 4-Way Intersection - - Straight Through onTCD FR Straight Through onTCD FR02-1 Off Road Race Control at Shared Path Crossing - - Straight Through on Shared PathTCD FR Control at T Intersection Shared Path CrossingTCD FR04-1 Road Closure Detour at 3-Way Intersection - - Closure ofTCD RC Closure ofTCD RC02-1 Index

Traffic Management for Events Generic Traffic Control Diagram 15 m ‘D’ m Major Road Minor Road ‘D’ m or 30 m Control at Regulatory Signed 4-way Intersection Right Turn from Major Road On-Road Bicycle Race BR FINAL Major Road and Minor Road A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) Not to Scale (#)(#) (#)(#) For Signed Controlled Intersection ‘D’ m otherwise ‘2D’ m For Signed Controlled Intersection ‘D’ m otherwise ‘2D’ m

Traffic Management for Events Generic Traffic Control Diagram Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook. 4. Additional traffic controllers/ marshals and/or containment fencing to be used to control pedestrians where conflict between pedestrians crossing minor leg and cyclists is likely to occur. 5.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 6.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 7.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 8. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 9.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 MR-TAW x 6002 T1-34(A)900 x 6002 T1-18(A)900 x 6002 Stop/Slow Bat450DIA1 Traffic Cones7002 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR01 Table1 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6002 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Major Road Minor Road Control at Regulatory Signed 4-way Intersection Right Turn from Minor Road On-Road Bicycle Race BR FINAL 60 Major Road and Minor Road To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) 15 m ‘D’ m Not to Scale (#)(#) (#)(#) ‘D’ m or 30 m (#)(#) (#)(#)

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook. 4. Additional traffic controllers/ marshals and/or containment fencing to be used to control pedestrians where conflict between pedestrians crossing minor leg and cyclists is likely to occur. 5.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 6.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 7.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 8. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 9.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. 10.Traffic controllers to bring to a stop all traffic and to assist in clearing all intersection traffic located on the event course side road prior to the arrival of the event participants. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6005 MR-TAW x 6001 T1-34(A)900 x 6005 T1-18(A)900 x 6005 Stop/Slow Bat450DIA3 Traffic Cones7004 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR02 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Control at Regulatory Signed 4-way Intersection Left Turn from Major Road On-Road Bicycle Race 2 12 FINAL 60 Major Road and Minor Road To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) ‘D’ m otherwise 2D m Minor Road Major Road BR03 Not to Scale For Signed Controlled Intersection ‘D’ m otherwise ‘2D’ m For Signed Controlled Intersection ‘D’ m otherwise ‘2D’ m

Traffic Management for Events Generic Traffic Control Diagram 1. Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.Traffic controllers/marshals and/or containment fencing to be used to control pedestrians where conflict between pedestrians crossing minor leg and cyclists is likely to occur. 3.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 4.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 5.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 6. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 7.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 MR-TAW x 6004 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR03 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1

Traffic Management for Events Generic Traffic Control Diagram Major Road Minor Road Control at Regulatory Signed 4-Way Intersection Left Turn from Minor Road On-Road Bicycle Race 2 12 FINAL 60 Major Road and Minor Road To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) 15 m ‘D’ m BR04 Not to Scale (#)(#) (#)(#) ‘D’ m or 30 m Controlled Intersection ‘D’ m otherwise ‘2D’ m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook. 4. Additional traffic controllers/ marshals and/or containment fencing to be used to control pedestrians where conflict between pedestrians crossing minor leg and cyclists is likely to occur. 5.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 6.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 7.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 8. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 9.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. 10.Traffic controller to bring to a stop all traffic and to assist in clearing all intersection traffic located on the event course side road prior to the arrival of the event participants. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6003 MR-TAW x 6001 T1-34(A)900 x 6002 T1-18(A)900 x 6002 Stop/Slow Bat450DIA1 Traffic Cones7002 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR04 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6002 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Traffic Control at 4-Way Intersection Straight Through on Major Road On-Road Bicycle Race 2 12 FINAL 60 Road One and Road Two To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) ‘D’ m Road Two Road One 15 m ‘D’ m BR05 Not to Scale (#)(#) (#)(#) ‘D’ m or 30 m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook.. 4.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 5.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 6.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 7.MR-TAW-28 (Runner) sign can be substituted with MR-TAW-31 (Pedestrian) sign or MR-TAW-27 (Cyclist) sign as applicable. 8. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 9.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 MR-TAW x 6002 T1-34(A)900 x 6004 T1-18(A)900 x 6004 Stop/Slow Bat450DIA3 Traffic Cones7002 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR05 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6002 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram 15 m ‘D’ m Major Road Minor Road Control at Regulatory Signed 4-Way Intersection Straight Through on Minor Road On-Road Bicycle Race 2 12 FINAL 60 Major Road and Minor Road To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) 15 m ‘D’ m BR06 Not to Scale (#)(#) (#)(#) (#)(#) (#)(#) ‘D’ m or 30 m Controlled Intersection ‘D’ m otherwise ‘2D’ m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook. 4. Additional traffic controllers/ marshals and/or containment fencing to be used to control pedestrians where conflict between pedestrians crossing minor leg and cyclists is likely to occur. 5.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 6.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 7.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 8. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 9.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. 10.Traffic controllers to bring to a stop all traffic and to assist in clearing all intersection traffic located on the event course side road prior to the arrival of the event participants. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6005 MR-TAW x 6001 T1-34(A)900 x 6004 T1-18(A)900 x 6004 Stop/Slow Bat450DIA2 Traffic Cones7004 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR06 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Through Road Minor Road Control at 3-Way Intersection Right Turn from Continuing Road On-Road Bicycle Race 12 FINAL 60 Through Rd and Minor Rd To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) 15 m ‘D’ m BR07 2 Not to Scale (#)(#) (#)(#) ‘D’ m or 30 m Controlled Intersection ‘D’ m otherwise ‘2D’ m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook. 4. Additional traffic controllers/ marshals and/or containment fencing to be used to control pedestrians where conflict between pedestrians crossing minor leg and cyclists is likely to occur. 5.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 6.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 7.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 8. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 9.Dimension of 'D' is the distance (in metres) equal to the speed limit in kilometres per hour or the average (85 th percentile) approach speed of traffic where significantly different from the speed limit. The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6003 MR-TAW x 6001 T1-34(A)900 x 6002 T1-18(A)900 x 6002 Stop/Slow Bat450DIA1 Traffic Cones7002 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR07 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6002 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Major Road Terminating Road Control at 3-Way Intersection Right Turn from Terminating Road On-Road Bicycle Race 2 12 FINAL 60 Major Rd and Terminating Rd To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) 15 m ‘D’ m BR08 Not to Scale (#)(#) (#)(#) (#)(#) (#)(#) ‘D’ m or 30 m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook. 4. Additional traffic controllers/ marshals and/or containment fencing to be used to control pedestrians where conflict between pedestrians crossing minor leg and cyclists is likely to occur. 5.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 6.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 7.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 8. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 9.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. 10.Traffic controllers to bring to a stop all traffic and to assist in clearing all intersection traffic located on the event course side road prior to the arrival of the event participants. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 T1-34(A)900 x 6004 T1-18(A)900 x 6004 Stop/Slow Bat450DIA2 Traffic Cones7004 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR08 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Control at Regulatory Signed 3-Way Intersection Left Turn from Continuing Road On-Road Bicycle Race 1 12 FINAL 60 Continuning Rd and Minor Rd To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) Kalamunda 2D m Continuing Road Minor Road BR09 Not to Scale Controlled Intersection ‘D’ m otherwise ‘2D’ m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook. 3. Additional traffic controllers/ marshals and/or containment fencing to be used to control pedestrians where conflict between pedestrians crossing minor leg and cyclists is likely to occur. 4.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 5.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 6.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 7. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 8.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6003 MR-TAW x 6003 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR09 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1

Traffic Management for Events Generic Traffic Control Diagram Major Road Terminating Road Control at 3-Way Intersection Left Turn from Terminating Road On-Road Bicycle Race 2 12 FINAL 60 Major Rd and Terminating Rd To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) 15 m ‘D’ m or 30 m BR10 Not to Scale (#)(#) (#)(#) ‘D’ m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook. 4. Additional traffic controllers/ marshals and/or containment fencing to be used to control pedestrians where conflict between pedestrians crossing minor leg and cyclists is likely to occur. 5.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 6.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 7.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 8. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 9.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. 10.Traffic controllers to bring to a stop all traffic and to assist in clearing all intersection traffic located on the event course side road prior to the arrival of the event participants. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6002 T1-34(A)900 x 6002 T1-18(A)900 x 6002 Stop/Slow Bat450DIA1 Traffic Cones7002 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR10 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6002 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Control at 4-Way Roundabout Left Turn On-Road Bicycle Race 2 12 FINAL 60 Road One and Road Two To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) ‘D’ m 2D m ‘D’ m Road Two Road One BR11 Not to Scale (#)(#) (#)(#) (#)(#) (#)(#) ‘D’ m or 30 m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook.. 4.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 5.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 6.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 7. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 8.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6006 MR-TAW x 6002 T1-34(A)900 x 6004 T1-18(A)900 x 6004 Stop/Slow Bat450DIA2 Traffic Cones7004 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR11 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Control at 4-Way Roundabout Left Turn On-Road Bicycle Race 2 12 FINAL 60 Road One and Road Two To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) ‘D’ m 2D m ‘D’ m Road Two Road One BR12 Not to Scale (#)(#) (#)(#) (#)(#) (#)(#) ‘D’ m or 30 m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook.. 4.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 5.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 6.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 7. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 8.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6006 MR-TAW x 6002 T1-34(A)900 x 6004 T1-18(A)900 x 6004 Stop/Slow Bat450DIA2 Traffic Cones7004 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR12 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Control at 4-Way Roundabout Straight Through On-Road Bicycle Race 2 12 FINAL 60 Road One and Road Two To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) ‘D’ m 2D m ‘D’ m Road Two Road One BR13 Not to Scale (#)(#) (#)(#) (#)(#) (#)(#) ‘D’ m or 30 m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook.. 4.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 5.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 6.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 7. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 8.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6006 MR-TAW x 6002 T1-34(A)900 x 6004 T1-18(A)900 x 6004 Stop/Slow Bat450DIA2 Traffic Cones7004 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR13 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Control at 3-Way Roundabout Right Turn from Continuing Road On-Road Bicycle Race 2 12 FINAL 60 Continuing Rd and Minor Rd To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) ‘D’ m Minor Rd ‘D’ m Continuing Rd BR14 Not to Scale (#)(#) (#)(#) (#)(#) (#)(#) ‘D’ m or 30 m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook.. 4.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 5.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 6.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 7. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 8.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 T1-34(A)900 x 6004 T1-18(A)900 x 6004 Stop/Slow Bat450DIA2 Traffic Cones7004 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR14 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Control at 3-Way Roundabout Right Turn from Terminating Road On-Road Bicycle Race 2 12 FINAL 60 Continuing Rd and Minor Rd To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) Minor Road ‘D’ m Continuing Rd ‘2D’ m BR15 Not to Scale (#)(#) (#)(#) ‘D’ m or 30 m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook.. 4.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 5.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 6.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 7. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 8.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 MR-TAW x 6002 T1-34(A)900 x 6002 T1-18(A)900 x 6002 Stop/Slow Bat450DIA1 Traffic Cones7002 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR15 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Control at 3-Way Roundabout Left Turn from Continuing Road On-Road Bicycle Race 2 12 FINAL 60 Continuing Rd and Minor Rd To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) Minor Road ‘D’ m Continuing Rd BR16 Not to Scale (#)(#) (#)(#) ‘D’ m or 30 m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook.. 4.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 5.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 6.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 7. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 8.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6002 T1-34(A)900 x 6002 T1-18(A)900 x 6002 Stop/Slow Bat450DIA1 Traffic Cones7002 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR16 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Control at 3-Way Roundabout Left Turn from Terminating Road On-Road Bicycle Race 2 12 FINAL 60 Major Rd and Terminating Rd To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) Terminating Rd ‘D’ m Major Rd BR17 Not to Scale (#)(#) (#)(#) ‘D’ m or 30 m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook.. 4.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 5.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 6.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 7. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 8.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6002 T1-34(A)900 x 6002 T1-18(A)900 x 6002 Stop/Slow Bat450DIA1 Traffic Cones7002 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR17 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6002 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram 2D m 30 m ‘D’ m 8 traffic cones at 4 m spacing's U-Turn on Two-Way Carriageway On-Road Bicycle Race 2 12 FINAL 60 Road Carriageway Rd To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) BR18 Not to Scale ‘D’ m or 30 m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook.. 4.Additional traffic controllers/ marshals and/or containment fencing to be used to control pedestrians where conflict between pedestrians crossing minor leg and cyclists is likely to occur. 5.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 6.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 7.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 8. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 9.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 MR-TAW x 6004 T1-34(A)900 x 6002 T1-18(A)900 x 6002 Stop/Slow Bat450DIA1 Traffic Cones70010 Sheet 2 - Notes and Conditions of Use to Diagram TCD BR18 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1

Traffic Management for Events Generic Traffic Control Diagram Traffic Control at 4-Way Intersection Straight Through on Major Road On-Road Race (Non-Vehicular) 2 12 FINAL 60 Road One and Road Two To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) Kalamunda ‘D’ m Road Two Road One 15 m ‘D’ m FR01 Not to Scale (#)(#) (#)(#) ‘D’ m or 30 m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook.. 4.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 5.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 6.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 7.MR-TAW-28 (Runner) sign can be substituted with MR-TAW-31 (Pedestrian) sign as applicable. 8. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 9.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 MR-TAW x 6002 T1-34(A)900 x 6004 T1-18(A)900 x 6004 Stop/Slow Bat450DIA3 Traffic Cones7002 Sheet 2 - Notes and Conditions of Use to Diagram TCD FR01 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6002 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Control at Regulatory Signed 4-Way Intersection Straight Through on Minor Road On-Road Race (Non-Vehicular) 2 12 FINAL 60 Road One and Road Two To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) ‘D’ m Road Two Road One 15 m ‘D’ m 15 m FR02 Not to Scale (#)(#) (#)(#) (#)(#) (#)(#) ‘D’ m or 30 m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook.. 4.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 5.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 6.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 7.MR-TAW-28 (Runner) sign can be substituted with MR-TAW-31 (Pedestrian) sign as applicable. 8. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 9.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. 10.Traffic controllers to bring to a stop all traffic and to assist in clearing all intersection traffic located on the event course side road prior to the arrival of the event participants. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6005 MR-TAW x 6001 T1-34(A)900 x 6005 T1-18(A)900 x 6005 Stop/Slow Bat450DIA3 Traffic Cones7004 Sheet 2 - Notes and Conditions of Use to Diagram TCD FR02 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Control at Shared Path Crossing Straight Through on Shared Path Off-Road Race (Non-Vehicular) 2 12 FINAL 60 Road One and Shared Path To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) ‘D’ m Road One 15 m ‘D’ m 15 m Shared Path FR03 Not to Scale ‘D’ m or 30 m (#)(#) (#)(#) (#)(#) (#)(#)

Traffic Management for Events Generic Traffic Control Diagram 1.The maximum approach speed of traffic is 60 km/h. 2.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 3.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook.. 4.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 5.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 6.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 7.MR-TAW-28 (Runner) sign can be substituted with MR-TAW-31 (Pedestrian) sign as applicable. 8. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 9.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 T1-34(A)900 x 6004 T1-18(A)900 x 6004 Stop/Slow Bat450DIA2 Traffic Cones7004 Sheet 2 - Notes and Conditions of Use to Diagram TCD FR03 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6004 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Control at T-Intersection Shared Path Crossing Straight Through on Shared Path Off-Road Race (Non-Vehicular) 12 FINAL 60 Road One and Shared Path To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) ‘D’ m Road One 15 m Shared Path ’D’ m Road Two Distance not to exceed 50 m FR04 2 Not to Scale ‘D’ m or 30 m ’D’ m (#)(#) (#)(#) (#)(#) (#)(#) (#)(#)

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum approach speed of traffic is 60 km/h. 3.The maximum traffic volume on the continuing road is vpd. 4.The maximum traffic volume on the terminating road is vpd. 5.Traffic Controller/s to be suitably accredited and comply with Main Roads’ Traffic Controller Handbook.. 6.The traffic control signs shall be displayed only when the race event is in progress and all traffic control devices shall be removed immediately after the event. 7.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 8.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 9.MR-TAW-28 (Runner) sign can be substituted with MR-TAW-27 (Cyclist) sign, or MR-TAW-31 (Pedestrian) sign as applicable. 10. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 11. Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6003 MR-TAW x 6004 T1-34(A)900 x 6004 T1-18(A)900 x 6004 Stop/Slow Bat450DIA2 Traffic Cones7004 Sheet 2 - Notes and Conditions of Use to Diagram TCD FR04 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6006 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1 (#)(#) Variation to Standards clause 9.3, Main Roads’ Traffic Management for Works on Roads Code of Practice. Event Symbolic Sign may be omitted subject to Road Authority Approval. (#)(#)

Traffic Management for Events Generic Traffic Control Diagram Detour at 3-Way Intersection Closure of Major Road Event Road Closure 12 FINAL 60 Road One and Road Two To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) Road One Road Two ‘D’ m Closed Road ‘Event in Progress’ sign shall be attached to the bottom of the Road Closed Sign (T2-4) RC01 1 Not to Scale

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.Doubled-up signing is not required on roads with traffic volumes of vpd or less. 3.Marshal/s to be provided to move barricades as required to allow vehicle access to and from closed road for property owners, business proprietors, event participants, etc. 4.Appropriate reassurance and ‘End Detour’ signing shall be specified to supplement the detour arrangement shown. 5.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 6.MR-TAW-28 (Runner) sign can be substituted with MR-TAW-27 (Cyclist) sign or MR-TAW-31 (Pedestrian) sign as applicable. 7. Procedures for the implementation of this Traffic Control Diagram shall be documented in the ‘Event’ specific Traffic Management Plan (TMP). Approval must be obtained from the relevant road authority prior to the implementation of the TMP. 8.Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. 9.Detour signs (T5-1)(L or R) to be located at intersection involving change in directions, to reassure and guide traffic along the route of the road detour. Route detour must be checked to verify suitable for use by the dominated vehicle type. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty MR-TAW x 6002 T x 6002 T5-1(L)(A)1200 x T5-1(R)(A)1200 x T2-4(A)1800 x 3001 MR-TP x 2001 Sheet 2 - Notes and Conditions of Use to Diagram TCD RC01 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty Barricade2+ T2-23(A)1200 x 6001 Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1

Traffic Management for Events Generic Traffic Control Diagram Detour at 3-Way Intersection Closure of Minor Road Event Road Closure 12 FINAL 60 Road One and Road Two To Be Advised A4 Not To Scale (Refer Sheet 2 for Notes and Condition of Use) Road One Road Two ‘Event in Progress’ sign shall be attached to the bottom of the Road Closed Sign (T2-4) RC02 1 Not to Scale ‘D’ m

Traffic Management for Events Generic Traffic Control Diagram 1.Traffic control diagram must be read in conjunction with the Event Traffic Management Plan. 2.The maximum traffic volume on the continuing road is vpd. 3.The maximum traffic volume on the terminating road is vpd. 4.Marshal/s to be provided to move barricades as required to allow vehicle access to and from closed road for property owners, business proprietors, event participants, etc. 5.Appropriate reassurance and ‘End Detour’ signing shall be specified to supplement the detour arrangement shown. 6.This generic Traffic Control Diagram shall not be used for events other than that subject to the approval of the relevant authority unless specified otherwise. 7. Dimension 'D' as shown in the diagram relates to approach speed of traffic at which 85% of the traffic is travelling as observed in accordance with Section 4.1.5(a) and Figure 4.2, AS The value of ‘D’ shall be determined from Table 1 below. Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty T2-4(A)1800 x 3001 MR-TAW x T1-32(A)1800 x 2004 MR-TP x 2001 T5-1(L)(A)1200 x 3001 T5-1(R)(A)1200 x 3001 Sheet 2 - Notes and Conditions of Use to Diagram TCD RC02 SIGN AND DEVICE INVENTORY Sign/ Device AS/MR Ref.Sign Dimension (MM) Qty G9-40-2(A)Barricade1 2+ Key Reference Documents Main Roads Western Australian Traffic Management for ‘Events’ and ‘Roadworks’ Code of Practice. Australian Standards AS – Traffic Control for Works on Roads. Approved ‘Event’ Traffic Management Plan. ‘Event’ Risk and Emergency Plan. Speed of Traffic km/h Value of 'D' m 55 or less15 56 to 6545 Greater than 65Equals speed of traffic, in Km/h Table1