TE-MPE participation on the GSI-CERN Collaboration for Testing Super-FRS's Superconducting Magnets (aka FAIR project) Daniel Calcoen Acknowledgements:

Slides:



Advertisements
Similar presentations
TE-MPE-CP, RD, 03-Dec Quench Detection and Energy Extraction Systems R. Denz (Quench Detection), K. Dahlerup-Petersen (Energy Extraction Systems),
Advertisements

HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Progress report on the test facility project design and construction P. Schnizer and L. Serio on behalf of bldg. 180 test facility project team members.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
E. Todesco HL-LHC: OUTLOOK ON PROTECTION FOR IR MAGNETS (WP3) E. Todesco CERN, Geneva Switzerland CERN, 23 rd April 2015 MPE meeting.
Changes in QPS R. Denz, TE-MPE-EP MPP workshop Acknowledgements: K. Dahlerup-Petersen, V. Froidbise, S. Georgakakis, B. Magnin, C. Martin, J.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Becoming familiar with QPS systems in the LHC (incl. EE) Presentation 02 Sept PART 1 of 3. Part 1: General layouts and principles Presentation of.
Update and status for the Work Unit ‘Energy Extraction’ - equipping the three test benches for series testing of Super-FRS Dipoles D2, D3, D4 and Quadrupoles.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
GSI Helmholtzzentrum für Schwerionenforschung GmbH LINK EXISTING FACILITY I n order to prepare the existing GSI accelerator facility (mainly the SIS18)
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
Fabio Formenti - Feb. 25th, LHC enhanced Quench Protection System project Review committee meeting February 24 th –26 th 2009.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
13 kA Energy Extraction LHC machine Gert Jan Coelingh – Knud Dahlerup-Petersen – TE/MPE/EE.
QPS R2E Status R2E Internal Meeting, October 24 th 2013Discussion 1 LS1 developments Digital Quench Protection insertion region magnets Delivery/installation.
Modelling and testing of circuit protection of new superconducting magnets for the HL-LHC project 1 st Workshop FTEC 2015 Alejandro Fernandez Navarro.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
TE-MPE-CP, RD, LHC Performance Workshop - Chamonix Feb R. Denz TE-MPE-CP on behalf of the QPS team QPS Upgrade and Re-commissioning.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
CERN TE-MPE-EP, RD, 09-April Quench Protection Systems (QPS) for the LHC R. Denz, TE-MPE-EP Acknowledgements: K. Dahlerup-Petersen, A. Siemko, J.
SC Undulators protection and commissioning W. Venturini Delsolaro Acknowledgements: R. Denz, R. Maccaferri.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
ELENA installation progress F. Butin / ELENA collaboration.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
CERN Construction Planning and Scheduling (LHC installation)
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
HL-LHC IT STRING and Series test of SC link
Daniel Calcoen TE-MPE-EP
Quench Simulation at GSI
Powering LHC magnets version 30/3/2007.
Testing of SC Magnets Status - November 2010
The HL-LHC Circuits: Global View and Open Questions
TE-MPE LS1 review Vision from EN-EL(CF)
Document Plan & Milestones WP7
(Procurement, testing of magnets)
J. Uythoven for the MPE-MI & MS Teams
MPE main activities planned for LS2
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
Lucio Rossi Project Leader
EN-ICE Technical Committee SM18 activities & projects
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Detailed global view on protection and detection of the circuits
TEST PLANS for HL LHC IT STRING
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
CERN-FAIR Steering Committee
Presentation transcript:

TE-MPE participation on the GSI-CERN Collaboration for Testing Super-FRS's Superconducting Magnets (aka FAIR project) Daniel Calcoen Acknowledgements: R. Denz, K. Dahlerup-Petersen. Special thanks to Edit. Copy-Paste who made this presentation possible. TE-MPE-TM#

Outline Introduction What and Where will be tested When will be tested MPE business (EES) MPE business (QPS) Conclusion TE-MPE-TM#

Introduction TE-MPE-TM# FAIR is a facility for fundamental science research at Darmstadt, Germany. (Facility for Antiproton and Ion Research). What we mention as the "FAIR project" is a collaboration between CERN and GSI to test all the superconducting magnets for the Super Fragmentation Separator (SuperFRS). The Collaboration protocol dates from 20th June 2012.protocol GSI webpagesGSI webpages. The information collected by EP for its WP is available here.here

What will be tested TE-MPE-TM#

What Long Multiplet TE-MPE-TM# about 7 meters long, 70 tons, containing 9 magnets inside.

Where will located TE-MPE-TM#

Where As today TE-MPE-TM#

Where Layout v2.x TE-MPE-TM#

Where Layout v3.x TE-MPE-TM#

When Prj Leader vision TE-MPE-TM#

Prj Leader vision (2) TE-MPE-TM#

GSI vision (Multiplets) TE-MPE-TM#

When GSI facts For S.C. Multiplets contract signing expected Q2/2015 FAT of first short multiplet Q1/2017 FAT of first long multiplet Q2/2017 Series testing: Q2/2018 – Q2/2021 For S.C. Dipoles FAT Pre-Series: Q1/2017 SAT Series: Q2/2018 – Q2/2020 TE-MPE-TM#

MPE Business EES Mandate : Provide the Energy Extraction System for the Test Bench. Knud presentationKnud presentation at CERN-GSI Technical Coordination Meeting 13 May There was an obvious interest in using an extraction system which had already been developed for the LHC, with adaptations if required. The 6 extraction systems for FAIR + the 2 spare are the ones removed from LHC point 6 (UA67) and refurbished. (incident with sprayed demineralized water from the cooled cables above the racks). TE-MPE-TM# Modifications Specifications leads to a requested Rdump figure of 2.8 Ω. Due to arc voltage limitations the solution is to insert 2 identical Rdump systems in each circuit (such as in the LHC Main Dipole circuits) - with Rdump 1.4 Ω per system. Six new 1.4 Ω energy absorption resistors are needed.

EE Modifications TE-MPE-TM# new dump resistor prototype 1.4 Ω (16 discs of 5.6 Ω). Each disc is capable of absorbing 100 kJ. EE systems for FAIR test benches ready for testing in Bldg. 281 (ISR).

MPE Business QPS Mandate : Provide the Quench Protection System for the Test Bench. Reiner presentationReiner presentation at CERN-GSI Technical Coordination Meeting 13 May A Standard Quench Detection System for magnet and leads will be provided, its architecture and design will follow proven LHC concepts (Digital, FPGA based, redundant detection systems). For the Supervision a LHC like solution (WinCC OA) will handle data for test bench operation, logging database and post-mortem. The Supervision will also treat all data acquired from voltage taps (including those not used for protection) and provide DAQ systems for EE (as in LHC) Infrastructure requests, general design studies and functional specification Final design and type testing, production, installation and commissioning. TE-MPE-TM# Modifications No need for quench heaters. No real PIC (synthetized by PLCs). Total voltage taps to measure : 155 (The long Multiplet with 9 magnets inside has 98 voltage taps and for the FoS they will add 57 extra voltage taps). For measurement sampling rate they wish 20Khz but they accept 10KHz. Tuning the algorithms for these new magnets.

Conclusion The project is waking up. Still some fuzzy corners on specifications and modifications. Warning! The uncertain schedule tends to relax the resources estimation and when they need to be apply (rush at the end). TE-MPE-TM#

Questions? TE-MPE-TM#