European Developments Transmission Workgroup 1 st December 2011.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
European Developments Transmission Workgroup 5 th April 2012.
EU Developments Transmission Workgroup 3rd November 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments Transmission Workgroup 5 th January 2012.
Completing the EU internal energy market IFIEC, 22 November 2011
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
EU Developments. September Update  ACER Framework Guidelines on interoperability rules  Scoping paper still to be published  Rather than conduct a.
EU Developments Transmission Workgroup 6th October 2011.
European Developments Transmission Workgroup 1 March 2012.
Gas Regional Initiative Region North-West Gas Regional Investment Plan Project Marie-Claire Aoun, Carole Mathieu CRE RCC Meeting The Hague – 4 April 2013.
GRI NW European Energy Work Plan 2011 – 2014 Programme Office RCC meeting, 15 September 2011.
Completing the EU internal energy market
European Developments: Capacity Transmission Workgroup 6th October 2011.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
The next steps for regional co-operation GRI NW Stakeholder Group 25 November 2011.
Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Ten Year Network Development Statement Volker Schippers GTE+ Senior Adviser GTE+ Workshop on GTE+ Work Programme 24 June 2008.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
European Developments Transmission Workgroup 3 rd May 2012.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Enagás, GRTgaz, Reganosa, REN and TIGF
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
EU Implementation Programme
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Gas Regional Initiative
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
ACER’s view on the future role of the Gas Regional Initiative
Gas Regional Investment Plan North West
Update on European Network Codes
26th February 2015 Teleconference
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Gas Regional Investment Plan North West
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Enagás, GRTgaz, Reganosa, REN and TIGF
26th February 2015 Teleconference
EUROPEAN TRANSPARENCY UPDATE
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
EU Developments.
ACER’s view on the future role of the Gas Regional Initiative
Update on WS3 Activities
Presentation transcript:

European Developments Transmission Workgroup 1 st December 2011

Interoperability Network Code Update Transmission Workgroup 1 st December 2011

Introduction  ‘Interoperability’ represents the third priority area of European Network Code development  The term refers to the ability of diverse networks to work together - ‘inter-operate’  The aim of the Code is to harmonise the physical / operational differences between TSOs that could impair the functioning of the EU gas market

Interoperability Timeline FG Drafting FG Consultation FG sent to Commission Network Code Development ComitologyImplementation Period (?)

Draft Framework Guideline  Scope of application is to all European TSO entry and exit points  ENTSOG view (supported by NG NTS) is that it should only apply to cross border interconnection points  Nomination matching processes supported by OBAs  Harmonisation of interconnection agreements  Harmonisation of units  Gas quality  Data exchange  Capacity calculation

Next Steps  Interoperability Framework Guideline to be published by ACER for consultation in mid-December  ACER workshop in January 2012  Consultation closes in mid-February 2012  Final Framework Guideline submitted by ACER to the Commission in Spring 2012  Code drafting starts in Summer 2012

Gas Regional Investment Plan – NW Region Transmission Workgroup 1 st December 2011

North West Gas Regional Investment Plan 15 TSO from 9 NW European Countries Based on Regulation (EC) 715/2009 (July 13 th 2009) GRIP to be published once every two years (art 12.1) TSOs may take investment decisions based on that GRIP (art. 12.1) TYNDP shall take into account GRIPs (art. 8.10)

Objective of the GRIP  To focus on transmission projects of the NW Region which have an impact on cross-border capacities  Highlight the extent to which these projects impact the Interconnection points Capacity within the NW region  Provide the most recent useful information on Transmission projects to stakeholders  Support informed discussion in assessing the ability of investment projects to answer regional market needs  First edition of GRIP feed back from stakeholder to improve the effectiveness of future editions

NW GRIP Structure  Foreword  Introduction  North West Specifics  Supply and Demand  Transmission Projects  Next Steps  Projects Information  Country Profiles  Border Point Reviews

Transmission Projects  Matrix Extract: identifying IP influenced by TSO projects

National Grid Perspective  First report of its kind, and it should be remembered that across the North West region, each country is at a different stage in their development of National let alone regional plans  As the report was only focused on projects that have a direct impact on Cross Border Capacities, couple with National Grid RIIO submission and the Infrastructure development that has occurred over the last decade, the GRIP shows minimal UK projects.  The UK Country Profile outlines clearly that in the coming years, investment in infrastructure will be key, especially with regard to network flexibility and the meeting of the governments targets.

Next Steps  Regional cooperation between TSOs is a key element for the effective integration of gas markets in NW Europe – very good co-operation from all parties in the process  GRIP was published on 21 st November 2011 – available on ENTSOG or participating TSO website  Presented to NW Gas Regional Initiatives on 25 th November  Consultation document will be published together with the GRIP  Consolidated feed back on consultation will be given in Q1 2012

EU Updates Timetable  Timetable aims to highlight the key items (consultations, workshops, decisions, etc.) NG NTS expect to cover via this agenda item in the forthcoming months TopicTX Workgroup EU Gas Balancing Update CAM Update Interoperability – differences between initial Framework Guidelines and version issued for consultation Jan 5th 2012 CAM & CMP UpdateFeb 2nd 2012 Interoperability - National Grid NTS response to FG consultation Gas Regional Investment Plan (GRIP) Consultation Feedback. March 2012