1 Ch 12: More Advanced Linear Programming Concepts and Methods Applying Linear Programming to Those Investments in Which The Simplifying Assumptions of.

Slides:



Advertisements
Similar presentations
Chapter 7 Capital Budgeting Processes And Techniques
Advertisements

BU Decision Models Integer_LP1 Integer Optimization Summer 2013.
Chapter 19 – Linear Programming
Linear Programming Problem
11-1 Capital Budgeting Professor Trainor Capital Budgeting Decision Techniques Payback period: most commonly used Discounted Payback, not as common.
The Capital Budgeting Decision (Chapter 12)  Capital Budgeting: An Overview  Estimating Incremental Cash Flows  Payback Period  Net Present Value 
Capital Budgeting Processes And Techniques
© 2009 Cengage Learning/South-Western Capital Budgeting Chapter 8.
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Average.
CAPITAL BUDGETING TECHNIQUES
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
KHALID AZIZ Capital Budgeting. 2 JOIN KHALID AZIZ ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM. FINANCIAL ACCOUNTING OF ICMAP STAGE 1,3,4 ICAP MODULE.
Issues in Capital Budgeting II
1 Chapter 11 The Basics of Capital Budgeting: Evaluating Cash Flows.
1 Chapter 10: The Basics of Capital Budgeting: Evaluating Cash Flows Overview and “vocabulary” Methods Payback, discounted payback NPV IRR, MIRR Profitability.
13b.1 Van Horne and Wachowicz, Fundamentals of Financial Management, 13th edition. © Pearson Education Limited Created by Gregory Kuhlemeyer. Chapter.
Ch 6 Project Analysis Under Certainty
Example 6.1 Capital Budgeting Models | 6.3 | 6.4 | 6.5 | 6.6 | Background Information n The Tatham Company is considering seven.
Capital Budgeting Evaluation Technique Pertemuan 7-10 Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
COMPLEX INVESTMENT DECISIONS
FIN 40153: Advanced Corporate Finance EVALUATING AN INVESTMENT OPPORTUNITY (BASED ON RWJ CHAPTER 5)
Capital Budgeting For 9.220, Term 1, 2002/03 02_Lecture9.ppt.
Example 4.7 Data Envelopment Analysis (DEA) | 4.2 | 4.3 | 4.4 | 4.5 | Background Information n Consider a group of three hospitals.
1 What is capital budgeting? Analysis of potential additions to fixed assets. Long-term decisions; involve large expenditures. Very important to firm’s.
Measuring Return on Investments: Investment Decision Rules and Project Interactions 02/04/08 Ch. 5 part 2 and Ch. 6.
Capital Budgeting Decision Tools 05/17/06. Introduction Capital Budgeting is the process of identifying, evaluating, and implementing a firm’s longer.
© 2010 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible Web site, in whole or in part.
Non-Linear Simultaneous Equations
Capital Budgeting Chapter 11.
Chapter 19 Linear Programming McGraw-Hill/Irwin
Investment Decisions and Capital Budgeting
8-1 Copyright (C) 2000 by Harcourt, Inc. All rights reserved. Chapter 8: Capital Budgeting Techniques Copyright © 2000 by Harcourt, Inc. All rights reserved.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 1-1 Developed.
1 Southern Illinois University“The Nature of IT Outsourcing”April 2006 Lecture 5-2: Capital Budgeting Techniques Azerbaijan State Economic University.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
Class 3 Investment Decisions and Capital Budgeting.
CORNERSTONES of Managerial Accounting 5e. © 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
Types of IP Models All-integer linear programs Mixed integer linear programs (MILP) Binary integer linear programs, mixed or all integer: some or all of.
Linear Programming McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Principles of Engineering Economic Analysis, 5th edition Chapter 15 Capital Budgeting.
Net Present Value and Other Investment Rules. Percent of CFOs who say they use the following rules to evaluate projects 2.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Project Evaluation Criteria MF 807: Corporate Finance Professor Thomas Chemmanur.
Example 15.7 Capital Budgeting at the Tatham Company Integer Programming Models.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Blank & Tarquin: 5 th edition. Ch.13 Authored by Dr. Don Smith,
Chapter 24 – Multicriteria Capital Budgeting and Linear Programming u Linear programming is a mathematical procedure, usually carried out by computer software,
Capital Budgeting Decide how to invest money so that its value is maximized.
Net Present Value and Other Investment Rules
© 2012 Pearson Prentice Hall. All rights reserved. Using Costs in Decision Making Chapter 3.
FINANCE IN A CANADIAN SETTING Sixth Canadian Edition Lusztig, Cleary, Schwab.
3 Components for a Spreadsheet Optimization Problem  There is one cell which can be identified as the Target or Set Cell, the single objective of the.
Integer Programming Definition of Integer Programming If requiring integer values is the only way in which a problem deviates from.
0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition 6 Chapter Six Some Alternative Investment Rules.
Section VI Capital Rationing. Section Highlights F Capital rationing F Linear programming F Shadow prices and the cost of capital F Integer programming.
LINEAR PROGRAMMING. Linear Programming Linear programming is a mathematical technique. This technique is applied for choosing the best alternative from.
12-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 12 Independent Projects with Budget Limitation ©
King Faisal University [ ] 1 Business School Management Department Finance Pre-MBA Dr Abdeldjelil Ferhat BOUDAH 1.
Part Three: Information for decision-making Chapter Thirteen Capital investment decisions: Appraisal methods Use with Management and Cost Accounting 8e.
BENEFIT-COST ANALYSIS Financial and Economic Appraisal using Spreadsheets Ch. 3: Decision Rules © Harry Campbell & Richard Brown School of Economics The.
Chapter 9 Integer Programming to accompany Operations Research: Applications and Algorithms 4th edition by Wayne L. Winston Copyright (c) 2004 Brooks/Cole,
1 Capital Budgeting Techniques © 2007 Thomson/South-Western.
Professor XXXXX Course Name / Number
Key Concepts and Skills
Net Present Value Decision Rules IRR (Internal Rate of Return)
Chapter 12: Kay and Edwards
CAPITAL BUDGETING – CASH FLOWES
Net Present Value and Other Investment Rules
Adopted and modified by Dr. W-.W. Li of UTEP, Fall, 2003
Chapter 24: Capital Investment Decisions
Net Present Value (NPV) and Other Investment Rules
Presentation transcript:

1 Ch 12: More Advanced Linear Programming Concepts and Methods Applying Linear Programming to Those Investments in Which The Simplifying Assumptions of Basic LP Analysis Do Not Hold.

2 Simple Application of L. P. In Chapter 11, Linear Programming was applied to those investments satisfying the following assumptions: 1.Additivity within activities: resource consumption is constant per unit of output; there are no economies of scale. 2.Divisibility within activities: partial investments can be implemented. There is no requirement to accept equipment in discrete sizes. 3.Independence of activities: there is no recognition of productive or financial interdependencies.

3 Extensions to the Basic Application of L.P. This chapter extends the basic applications of L P, to allow investment analysis where projects take on a more ‘real word’ flavor: ie, where some simplifying assumptions are relaxed.These extensions include: 1.Allowing more activities and constraints 2.Recognizing indivisible investments 3.Allowing inter-year resource borrowings and transfers 4.Recognizing interdependent projects 5.Treating mutually exclusive investments 6.Recognizing threshold investments, economies of scale, multiple goals and investment risk.

4 Explanations of the ‘Extension’ Ideas I. More Activities and Constraints: this notion deals with more complex resource mixes, and more constraints, or combinations of projects Indivisible Investments: Most projects are not physically divisible. For example, power stations are not divisible, although they can vary in size as to scale. Inter-Year Transfers: Capital and supplies may become available at different times, or surplus amounts may be able to be transferred between years.

5 Explanations of the ‘Extension’ Ideas II. Interdependent projects: projects may provide mutual support and resources, or infrastructure to each other. Mutually Exclusive Investments: A casino built on a site will preclude the construction of an hotel or sporting facility. Only one of these projects can appear in the LP solution.

6 Explanations of the ‘Extension’ Ideas III. Threshold Investment, Economies of Scale, Multiple Goals, and Risk:  Projects may have a fixed scale: eg a single large airplane, requiring a fixed amount of capital.  Projects may generate scale of production economies with increased size.  Projects may have to satisfy conflicting wealth, environmental and social concerns.  All analyses must recognize risk.

7 Advanced LP Techniques Applied to A Complex Investment Problem : An Example, ‘Power Gen Inc’. Power Gen Inc. has identified this set of alternative power generating proposals:-

8 Advanced LP Techniques Applied to A Complex Investment Problem : An Example, ‘Power Gen Inc’. In maximizing total NPV by choosing a mixture of these generating alternatives, Power Gen Inc. faces these constraints:- At least 100 MW have to be produced from renewable resources. At least 200 MW have to be produced from natural gas. Total cash and credit available is limited to $700M.

The LP Solution For ‘Power Gen Inc’.

10 Notes On The LP Solution For ‘Power Gen Inc’. The chosen generating methods are: Hydro 70% of project adopted, Natural Gas, Site A 100% of project adopted, Natural Gas, Site B 100% of project adopted, Windfarm 100% of project adopted, Biofuel 0% of project adopted, Solar Panels 0% of project adopted. Total NPV from this selection is $M356. Calculated as: (0.70 x $180) + (1 x $100) + ( 1 x $80) + (1 x $50) Total capital outlay for this selection is $M700

11 Notes On Constraints For The LP Solution For ‘Power Gen Inc’. Output from renewable resources at 364MW is greater than the required minimum of 100MW. Output from natural gas at 450MW is greater than the required minimum of 200MW. All projects were artificially constrained at a maximum of 1 unit, so that more than one project of any technology could not be chosen. This constraint has been satisfied. Capital outlay at $M700 is equal to the maximum allowed of $M700.

12 Note On Output For The LP Solution Of ‘Power Gen Inc’. The solution shows that only 70% of the Hydro scheme is to be adopted. Such a scaled down scheme may not be acceptable. To ensure that projects are either accepted or rejected in their entirety, Mixed Integer Linear Programming can be used. ‘Integer’ settings such as 0,1,2,3… allow discrete zero or multiple selection of projects. ‘Binary’ settings with levels of 0 or 1 allow discrete zero or unitary selection of projects. MILP is invoked by selecting either ‘bin or ‘int’ constraints within the ‘Constraints’ selection in the ‘sign’ part of the Solver dialog box.

13 Setting Integer and Binary Constraints. ‘Binary’ constraint selected via the Solver ‘sign’ dialog box. ‘Integer’ constraint selected via the Solver ‘sign’ dialog box.

14 Other LP Formulations Mixed Integer Linear Programming can be used to solve other complex investment problems by careful specifications of the goals, and imaginative definitions of the constraints. For example: Inter-Year Capital Transfers -- Introduce activities for borrowing and capital transfers. Contingent Projects -- introduce permission constraints which allow one activity to proceed only if another is adopted. Mutually Exclusive Projects -- introduce constraints in which the total number of activities is below or equal to a maximum level.

15 Other LP Applications Threshold investment levels – the threshold level is set up as a binary constraint. Economies of Scale – particular scale levels are set up as independent activities with binary constraints. Multiple Goals - each goal is set up as a constraint goal, or each goal can be individually weighted in a total goal measure. Risk Analysis – risky alternatives could be constrained in the product mix; or an overall risk measure such as ‘variance could be targeted and minimized.

16 Advanced LP Applications: Summary Linear programming can be used to solve selection problems from amongst competing investment alternatives in the face of complex constraints. These constraints mirror real world problems, and present a more realistic picture of actual investment behavior, than that assumed in base level LP analysis. This higher level of analysis requires imaginative definitions of both goals and constraints, and an appreciation of Linear Programming methodology.