Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.

Slides:



Advertisements
Similar presentations
The Why, What and How of Disaster Recovery Plan Testing Presented By: Ed Deveau.
Advertisements

Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 En Route Route Clearances Draft Use Case Introduction Boeing –
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #26 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12.
Federal Aviation Administration Data Communications Program Data Comm Trials and Production Requirements: High Level Impact Presented To: DCIT #23 Plenary.
ATN Subnetwork Implementation:
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
Harris.com Michael Earl Systems Engineering, Trials and OPR Trials Status and OPR Update.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
Data Communications Implementation Team (DCIT)
Document Tracking and the Related Process Andria Roney Rob Mead Andy Fry Andrew Onken.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT23 Update To:DCIT23 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig & Pete Muraca.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #33 Agenda 6/4/2014 Harris – Washington, DC.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 Agenda 06/12-06/13/2013 Boeing – Arlington, VA.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #21 Plenary 02/01/2013 To: DCIT By: Gregg Anderson.
EWR DCL Trial Update Capt Gregg Kastman MD-11 Flt Trng Sup.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT Meeting 08/24/2011.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #23 Plenary 05/09/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT Update To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Presented to: DCIT By: Andy Fry, Thane Inc. Date: September 26, 2013 Federal Aviation Administration Data Communications DCIT FDWG Climb Via Discussion.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT 37 Plenary Agenda December 10, 2014 Harris Corp Washington, DC.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #15 Plenary 05/31/2011 To: DCIT By: Gregg Anderson.
| 1 harris.com Matt Maki DCL Trials Lead DCL Trials Decommissioning Plan 29 Sep 2015.
Nodal Program Update Mike Cleary Sr. VP and Chief Technology Officer.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #9 Meeting 09/21/2011 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #22 Plenary 03/14/2013 To: DCIT By: Gregg Anderson.
P. Muraca v0.4 Data Comm DCL Trials end to end system test.
P. Muraca v0.2 Data Comm DCL Trials end to end system test.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #16 Plenary 05/31/2011 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Subscriber Database (SDB) and Web Access To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 3/13/13.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT24 Update To:DCIT24 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #32 PLENARY DCL Trials.
DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system.
Presented to: DCIT Flight Deck Working Group By: Andy Fry, Thane Inc. Date: October 12, 2011 Federal Aviation Administration Data Communications DCIT #10.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #12 Plenary 01/12/2011 To: DCIT By: Gregg Anderson.
International Civil Aviation Organization
Data Communications Implementation Team (DCIT)
Data Communications Implementation Team (DCIT)
Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
Data Communications Implementation Team (DCIT)
Data Communications Program
Data Communications Implementation Team (DCIT)
15-19 Nov 2010 Rockville, MD – Lockheed Martin
Presentation transcript:

Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented by:Pete Muraca Date:September 26, 2012

Federal Aviation Administration DCL Trials – Test Status DCIT #18 (September 26, 2012) Agenda End to End Functional Testing – to date Documentation – to date Lab Test Environment DCL Trials Test Timeline Lab Photos 2

Federal Aviation Administration DCL Trials – Test Status DCIT #18 (September 26, 2012) End to End Functional Testing – to date DTAP Build 2 (adds UM79 : CLEARED TO (position) VIA (route) & AOC Dispatch Out Copy ) - Run system test cases with Tech Center bench avionics -Run system test cases with Boeing and Airbus labs (multiple flight deck configs) -Exercised test scenarios with DCIT aircraft -Conducted Regression testing Documented / Socialized Findings Resolution(s) -All High PTRs and most others being addressed / resolved in DTAP Build 3 (Oct 1, 2012) -Build 3 also adds UM80 -Continue system testing for added functionality, and Regression 3 Outstanding PTRs High6 Medium10 Low12 3 Total discovered to date: 37

Federal Aviation Administration DCL Trials – Test Status DCIT #18 (September 26, 2012) Documentation – to date Concept / Requirements -Requirements Document -SSS System Test Cases - Exercising defined test procedures associated with testable requirements -Pass / Fail test cases are being tracked VRTM -Traceability with Requirements -Mapped with Test Cases -Association with documented PTRs -Categorized in association with DTAP Build / Releases PTRs / Reporting -All PTRs are being documented, tracked and socialized -Internal Data Comm program reporting on a weekly basis -E-E Functional Test Report (planned) -E-E Functional and Operational Test Report (planned) Working Schedule -Following test schedule to the extent possible. Adapting as constraints and programmatics impact the working schedule 4 4 Note: contract deliverables are being managed / documented between Thales/ITT and FAA personnel

Federal Aviation Administration DCL Trials – Test Status DCIT #18 (September 26, 2012) Lab Test Environment Currently running DTAP Build / Release 2 HADDS connectivity and simulation capability FNTB connectivity for external FAA G/G communications Ground/Ground and Air/Ground Communication service via ARINC Ground/Ground and Air/Ground Communication service via SITA is planned (work in progress) Full utilization of Boeing configurable flight deck Full utilization of Airbus configurable flight deck Full utilization of FAA Technical Center bench avionics DCIT Airlines Participation (Jerry Smith / Andy Fry will cover with greater details in related brief) Internal and External resources allocated Plans and Procedures in place 5 5

Tech Center DTAP E-E Functional Testing Tech Center DTAP E-E Functional Testing DCL Trials – MEM Timeline (updated: 9/24/2012) pDTAP and Update pDTAP / HADDS vin box test pDTAP / HADDS via FNTB Failover / Rev # test pDTAP / HADDS / CSP Interface via FNTB + bench Avionics pDTAP (applicable reqs/VRTM) testing with bench avionics pDTAP testing via Boeing + Airbus air labs PTR fixes / regression Test Cases document final Sept 17 OT&E Sept MEM Nov 12 Trials Start MEM Training DTAP 1&2 setup/prep Dry Run & Prep Conduct Controller OT (Prep / Dry Run & Conduct) System test case / bench avionics System test case / Boeing air lab System test case / Airbus air lab System test case / DCIT aircraft Error conditions / failover PTR fixes / regression 8/23/1012: Security Assessment Regression with B2 (in lab) Regression with B3 (Oct 1 in lab) Regression with B4 (Oct 23 in lab) E-E Functional Test Report Install & checkout MEM / FDX Training 11/2/2012: Facility / User Review SAT sub_test cases final SAT sub_test cases functional testing/ FedEx aircraft E-E Operational scenarios based on DCIT doc / Live aircraft Error conditions / failover in field 9/27/1012: Security Assessment Regression with B3 (in lab & in field) SAT Test Report May 10 (B1) Aug 17 Aug 22Sept 7Sept 14 DCL & AFN attempt with DCIT aircraft pre-arranged event # 1 (Aug 28, 29 & 30) AFN and CPDLC connect with Boeing event (July 31, Aug 3, 7, 11) Video Tech Center event (Sept. 13) (B2) Sept 3 (B3) Oct 1 (B5) Nov 30 (B1) = CAF, Revised DCLs other than route, CHI, AFN (B2) = Adds UM79, AOC DC (no ack) (B3) = Adds UM80 (B5) = Adds UM83 & gate response processing AFN and CPDLC connect with Airbus event (Aug 6-8) Oct 29 – Nov 10 Video MEM event (Sept. 24) Controllers early look & feel (Aug. 29) Func. Regression & Operational OT&E SAT Oct (B4) Oct 23 DTAP 2 setup/install&ch MEM (B4) = Adds FIDO AFN, DCL, Revisions with DCIT aircraft event # Tech Center (Oct. 10 & 11)

Federal Aviation Administration DCL Trials – Test Status DCIT #18 (September 26, 2012) Lab Photos 7

Federal Aviation Administration DCL Trials – Test Status DCIT #18 (September 26, 2012) Lab Photos 8

Federal Aviation Administration DCL Trials – Test Status DCIT #18 (September 26, 2012) 9

Federal Aviation Administration DCL Trials – Test Status DCIT #18 (September 26, 2012) 10

Federal Aviation Administration DCL Trials – Test Status DCIT #18 (September 26, 2012) Lab Photos 11