Run Coordinator Report February 5 to 8 Stepan Stepanyan JLAB 1.

Slides:



Advertisements
Similar presentations
Y. R. Roblin, G2P review, 1/17/ HALLA G2P readiness review Yves Roblin, CASA.
Advertisements

FROST G9b FROST status update May 24 - June 13, Run Coordinators: Mike Dugger, Eugene Pasyuk, Barry Ritchie.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Beamline update Ken Moffeit 5 June 2013 The Beginning Overview of the beamline Beam diagnostics Silicon Protection New options for location of HPS Beamline.
Heavy Photon Search experiment in Hall-B slides/ideas borrowed/stolen from talks of S. Stepanyan, J. Jaros, T. Nelson Special thanks to S. Stepanyan M.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
Draft HPS Run Plan March 30, Next Steps Beamline Setup Trigger Commissioning Beam Stability Studies SVT Commissioning Data Taking Checking the.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Update on Accelerator Commissioning Plan Todd Satogata Accelerator Physics Group Head Center for Advanced Studies of Accelerators Accelerator Readiness.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
DESY: From High Energy Physics to Synchrotron Radiation Accelerator Operation in a changing Environment Michael Bieler DESY: From High Energy Physics to.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Hovanes Egiyan Jefferson Lab. Main Hall B Beamline Components Beam Tuning Procedure HV System in Hall B Temperature Sensors Summary 10/19/ Hovanes.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
Y. R. Roblin Hall A beamline and accelerator status.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
X>2 & SRC May 3rd – May 10th, 2011 Xiaohui Zhan Argonne National Lab.
HPS Experiment Overview John Jaros HPS Collaboration Meeting at JLAB October 26, 2015.
Run Coordnator Report 2012/04/ /04/10 Jixie Zhang
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
Extraction/Separator Setup Michael Spata Operations Stay Treat July 16, 2015.
2016 Operations StayTreat 4-Hall Ops and Operations: What is the Control room vision for 4-Hall Ops?
Beam Commissioning Adam Bartnik.
Bubble Chamber Schedule – 2017
Data-Driven Machine Retuning
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Ops & PSS Paul Vasilauskis Blue Title Page 1.
Accelerator status after the 12 GeV upgrade
Electron Beam Setup for Bubble Chamber
12 GeV CEBAF.
Beam Background and the SVT Protection Collimator
Preparation of the CLAS12 First Experiment Status and Time-Line
Bubble Chamber – Beam Requirements
Friday March 4th 08h32: Access for beam dump system.
Hall C Hot Check Out Process
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Qweak Coordination Meeting
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
S. Stepanyan (JLAB) HPS collaboration meeting May 3 – 5, 2017 JLAB
PQB Meeting March 05, 2009.
Injector Setup for G0 and HAPPEX & Lessons Learned
ThomX – Commissioning Meeting – 25/01/2018
Friday 15th February - morning
Another Immortal Fill….
HALLA APEL REPORT Yves Roblin Hall A colllaboration Meeting
Isotope Readiness Review Run Plans
Presentation transcript:

Run Coordinator Report February 5 to 8 Stepan Stepanyan JLAB 1

HPS 2016 S. Stepanyan, Preparing for spring run 2  Run is scheduled from February 5 to March 14, weekends only  The second energy run, again 1 pass beam but at 2.3 GeV  HPS has the hall from 3 pm on Friday till 7 am on Monday.  Hall-B/HPS is the priority hall over the weekends  Most of the data taking will be with 200 nA beam on r.l. W target  There will be several calibration runs such as – luminosity scans, carbon target, empty target, “straight through” (chicane off) runs, etc. ParameterValue Beam energy (1 pass)2.3 GeV Beam currentup to 300 nA Current stability< 10% Beam profile at the target σxσx < 250  m σyσy < 50  m Beam position stability in x < 100  m in y < 50  m

Goals for Weekend-I (Feb. 5 – 8) S. Stepanyan, Preparing for spring run 3  Complete 1-pass beam setup to Hall-B  Establish production quality beam on target  Complete beam commissioning, BPM calibrations, commissioning of orbit locks, FSD system, positioning of collimator (see procedures on Run wiki for details)  Start commissioning of HPS systems, chicane setup, rate studies, occupancies (see subsystem commissioning plans) Almost all done!

Feb. 4 & 5 S. Stepanyan, Preparing for spring run 4  February 4:  Documentation was complete, run certificate was assigned  HCO for all systems (exception beamline vacuum) was complete  Pumping downstream of the tagger started  February 5:  Vacuum beamline was restored but no vacuum around 2:30pm due to pump issue. HCO for vacuum by operations still not complete  Issue with Hall-B vacuum reading in EPICS prevented hall to go to beam permit at 3 pm. Work in the hall must be organized in such way that at 3pm every Friday beam line and hall are ready to close!  Hall went to controlled access at 6:30pm. Problem with the vacuum was resolved around 9:30pm.  Beam tune started, close to midnight ops was ready to send beam to tagger dump.

February 6 S. Stepanyan, Preparing for spring run 5  Started swing shift with ongoing work on beam dispersion and optics  At 4:20 am got first glimpse of CW beam to the tagger dump  Some beam profile studies and beam tuning with 2C21 and 2C24 (tagger) harps till 10:30 am (beam was too intermittent to go faster)  Experts came in for nA BPM calibrations, started at 10:30 am, work was not finished due to a vacuum problem in the machine at around noon (experts were gone when beam came back)  When beam came back Michael T. continued tuning the beam to the tagger till 6 pm. Beam profiles on 2C21 and 2C24 were acceptable for the commissioning plan  At 6:30 pm started degauss the tagger magnet

Beam profiles at 2C21 and 2C24 harps S. Stepanyan, Preparing for spring run 6

February 6 – 7 S. Stepanyan, Preparing for spring run 7  First beam on Faraday cup viewer was delivered at 7:00 pm  At 9:30 pm positioning of SVT protection collimator was done (perform scans for determination of the widths and centers of the holes)  Found a problem with 2H00 readback, orbit locks were engaged with only 2H02 (worked at some level)  Continued with beam tune on 2H02A harp with Michal T.,  At 1:30 am machine was delivering CW beam to 3 halls for the first time  Had to postponed beam profile studies due to a problem with 2H02A harp. Motor stuck half a way and want move up or down  At 2:40 am beam was good enough (on the viewer) to turn ECal ON  At 3 am cold box tripped at CHL, machine went down. Hall went to controlled access to address issues with 2H02A harp and IOC classc8  No engineering on call! Came at 6am to investigate the issues. Both problems were resolved 7:30am

February 7 S. Stepanyan, Preparing for spring run 8  Beam was restored on at 1 pm (too intermittent)  Beam had a tail requiring retune at the injector  At 4:30 pm got more-or-less good beam on 2H02A harp  Expert were called in to fixed and calibrated both striplines, 2H00 and 2H02  After BPM calibrations, beam orbit was optimized using rates on halo counters  At 7pm orbit was tuned and locked, reasonable beam profile at 2H02A.  Getting ready to turn on HPS

February S. Stepanyan, Preparing for spring run 9  At 11:00 pm chicane was ON, beam was slightly to right (~2 mm) on the screen  Perform ECal rate studies without and with target. Observe somewhat lower rates than expected (350 kHz at 150 nA, x2 lower than expected)  No beam from 1:30 am to 4:30 am RF issues  Continued with FSD system commissioning and trigger rate studies  At 7:00am hall was in restricted access

S. Stepanyan, Preparing for spring run 10

S. Stepanyan, Preparing for spring run 11

S. Stepanyan, Preparing for spring run nA, no target, chicane OFF 200 nA, 4  m W, chicane ON – too low rates (x2)?

ecalDiagGUI S. Stepanyan, Preparing for spring run 13